Steel goalpost frames in Archway

Steel goalpost frames for homes in N4, N5, N6, designed by a structural engineer.

  • Survey, design and installation in one
  • Covering N4, N5, N6
  • Inspected before it is covered

Free survey in Archway

Tell us about the steel goalpost frame job in Archway.

Please enter your name.
Please enter a UK phone number.
Please enter a valid email.
Please enter a UK postcode.
Please tell us a little about the job.
  • Free survey visit
  • Engineer's calculations arranged
  • Building control handled
  • Fixed written price once scope is agreed
  • England, Wales, mainland Scotland & NI

About our steel goalpost frames service in Archway

Need steel goalpost frames in Archway? The wider London area is covered as well. We survey the property, arrange the engineer's design, deal with local building control, fit the steel and make good, all under one quote for N4, N5, N6, N7 and N8 addresses.

When a rear wall is opened almost corner to corner, or the brickwork either side is too thin, cracked or broken up by openings to take a concentrated load, a beam on padstones is not enough. A goalpost frame brings its own supports: two columns carry the beam's ends straight down to new foundations, so the walls around the opening are not relied on.

Worth knowing before you start

  • Goalpost frames are made to measure, so accurate site dimensions matter. Floor-to-ceiling height, the finished floor level and the width between column positions are taken before fabrication, because a frame that is a few millimetres out cannot simply be trimmed on site.
  • Columns are commonly universal columns or square hollow sections, welded to steel base plates at the foot and cap plates at the head. Holding-down bolts fix the base plates to the pad, and grout fills the gap beneath once the frame is level.
  • Keep the engineer's calculations, the frame drawings and the building control completion certificate together. They show a future buyer's surveyor how the opening is supported and save questions about the columns when the house is sold.
  • A goalpost frame is structural work, so building regulations approval is needed in England and Wales, a building warrant before work in Scotland, and a building control application in Northern Ireland. The inspector typically wants to see the pad excavations as well as the finished steel.
  • Columns can be boxed in with fire-rated plasterboard to look like small piers, built into new stud walls, or left exposed and painted. Where an extension wall continues past the opening, a column can often sit within it out of sight.

From survey to sign-off in Archway

  1. Free visit

    A short visit to Archway to see the job, agree what you want and check the bearings, floors and services that affect the design.

  2. Calculations

    The engineer's calculations and a simple drawing are prepared for your opening and shared with you before anything is ordered.

  3. Building control

    We submit a building notice or full plans application to the local council's building control team, so approval is in place before the wall is touched.

  4. Steel in, made good

    On site we prop, open up, fit and pack the steel, then fire protect, box in and plaster once the inspection is done.

What do steel goalpost frames cost in Archway?

As a guide, budget £2,550–£7,700 including VAT for steel goalpost frame in Archway, based on published UK cost guides adjusted for London prices (+28%).

JobTypical guide rangeWhat it usually covers
Steel goalpost frame£2,550–£7,700Two posts and a beam bolted as a frame, pad foundations, base plates and fitting
Rear wall opening for bi-fold or sliding doors£3,200–£8,950External wall opened up to about 5 m with steel, propping, cavity tray and making good (doors supplied separately)
Steel column or post£640–£1,920 per columnColumn supplied and fitted with base and cap plates on a pad foundation
Structural calculations for a beam£320–£960Site measure or photos, beam and padstone design and calculations for building control

Figures include our approximate regional adjustment for London prices (+28%) and are rounded. How these figures are worked out.

Building control and neighbours in Archway

In England, taking out a load-bearing wall or putting in a beam is building work under the Building Regulations 2010. It needs approval from building control, either the local council's building control team or a registered building control approver, through a full plans application or a building notice. Part A covers the structure and Part B covers fire safety, which is why steel in homes is usually fire protected.

If the beam bears into a wall you share with a neighbour, the Party Wall etc. Act 1996 applies, and a party structure notice must be served at least two months before that work starts. We arrange this through a party wall surveyor.

Building rules in England

Steel goalpost frames near Archway

Steel goalpost frames in Archway: your questions

Who approves steel goalpost frames in Archway?

Structural work in Archway needs a building notice or full plans application to the local council's building control team or a registered building control approver. We prepare and submit it with the structural engineer's calculations and arrange the inspections, so the completion paperwork follows the job.

Can you work on older or listed homes in Archway?

Yes. Older homes often have lime mortar, timber lintels or shallow footings, which the engineer allows for. Listed buildings need listed building consent for internal structural changes as well as building regulations approval, and that must be in place first.

Can a goalpost column go next to my neighbour's wall?

It can, but in England and Wales it may bring in the Party Wall etc. Act 1996. Digging a pad near a neighbour's building to below the level of its foundations, or fixing into a shared wall, can be notifiable. We arrange notices through a party wall surveyor where needed. There is no equivalent Act in Scotland or Northern Ireland.

What is the difference between a goalpost and a portal frame?

A domestic goalpost is a simple version of a portal frame. Both use columns and a beam joined together, but a full portal frame has rigid joints designed to resist sideways loads on its own, as used in steel-framed industrial buildings. In a house, the engineer decides how rigid the goalpost joints need to be for that opening.

What is a goalpost frame in an extension?

A goalpost frame is a steel beam sitting on two steel columns, bolted together so it stands as one unit. In an extension it is usually placed where the old rear wall was, holding up the house above while leaving a wide, clear opening. The columns rest on concrete pads, so the frame does not depend on the surrounding brickwork.

Do you cover Archway for steel goalpost frames?

Yes. We carry out steel goalpost frames in Archway and the N4, N5, N6, N7 and N8 postcode districts. Book a free survey visit and we will check the wall, arrange the engineer's calculations and send an itemised written quote.

Planning to take a wall out?

Book a free survey visit. You get an itemised written quote covering calculations, building control, steel and making good.