Steel BeamInstallers
Grey steel goalpost frame installed where a rear wall has been removed

Steel goalpost frames · Harlow

Steel goalpost frames in Harlow

Steelwork, approvals and making good for steel goalpost frames in Harlow and nearby.

  • Itemised written quote
  • Beam sized by a structural engineer
  • Covering Harlow and nearby

Free survey in Harlow

Tell us about the steel goalpost frame job in Harlow.

Please enter your name.
Please enter a UK phone number.
Please enter a valid email.
Please enter a UK postcode.
Please tell us a little about the job.
  • Free survey visit
  • Engineer's calculations arranged
  • Building control handled
  • Fixed written price once scope is agreed
  • England, Wales, mainland Scotland & NI

About our steel goalpost frames service in Harlow

Need steel goalpost frames in Harlow? We also cover the surrounding towns and villages in Essex. We survey the property, arrange the engineer's design, deal with local building control, fit the steel and make good, all under one quote for CM17, CM18, CM19 and CM20 addresses.

When a rear wall is opened almost corner to corner, or the brickwork either side is too thin, cracked or broken up by openings to take a concentrated load, a beam on padstones is not enough. A goalpost frame brings its own supports: two columns carry the beam's ends straight down to new foundations, so the walls around the opening are not relied on.

Worth knowing before you start

  • Digging the column pads means breaking through the floor, which is noisier and messier than fitting a beam alone. Floor coverings near the column positions need lifting, and the spoil from the excavations is bagged and removed from site.
  • A goalpost frame differs from a simple beam because the beam does not rely on the walls at its ends. The two columns and the beam are connected so the whole frame carries the load down into foundations of its own.
  • Keep the engineer's calculations, the frame drawings and the building control completion certificate together. They show a future buyer's surveyor how the opening is supported and save questions about the columns when the house is sold.
  • While the old wall or piers come out, the floor, walls and roof above are held on props and needles. These stay in until the frame is fully bolted, levelled and packed, so the structure is never left without support.
  • Each column usually needs its own concrete pad foundation, because a column delivers a heavy point load that an ordinary floor slab or old strip footing may not take. The engineer sets the pad size and depth from the load and the ground conditions found.

Four stages, one team

  1. Survey in Harlow

    We visit, look at the wall and what sits above it, measure the opening and note services, access and how the steel can be brought in.

  2. Engineer's design

    A structural engineer sizes the beam, padstones and any posts, and sets out the temporary support needed while the wall is out.

  3. Building control

    We submit a building notice or full plans application to the local council's building control team, so approval is in place before the wall is touched.

  4. Install and sign-off

    Props go in, the opening is formed, the steel is set and packed, building control inspects it, and we make good.

Guide prices for steel goalpost frames in Harlow

As a guide, budget £2,100–£6,350 including VAT for steel goalpost frame in Harlow, based on published UK cost guides adjusted for prices in the East of England (+6%).

JobTypical guide rangeWhat it usually covers
Steel goalpost frame£2,100–£6,350Two posts and a beam bolted as a frame, pad foundations, base plates and fitting
Rear wall opening for bi-fold or sliding doors£2,650–£7,400External wall opened up to about 5 m with steel, propping, cavity tray and making good (doors supplied separately)
Steel column or post£530–£1,590 per columnColumn supplied and fitted with base and cap plates on a pad foundation
Structural calculations for a beam£260–£800Site measure or photos, beam and padstone design and calculations for building control

Figures include our approximate regional adjustment for prices in the East of England (+6%) and are rounded. How these figures are worked out.

Building rules for Harlow

For Harlow, building control is provided by the local council's building control team, or by a registered building control approver if preferred. We send them the engineer's calculations with a building notice or full plans application and book the inspections. Work done without approval can cause problems at sale and is far dearer to put right later.

Terraced and semi-detached homes often need party wall notices, because cutting into a shared wall to take a beam end is notifiable under the Party Wall etc. Act 1996. Allow at least two months for the notice period unless your neighbour agrees sooner.

Building rules in England

Steel goalpost frames near Harlow

Questions about steel goalpost frames in Harlow

What happens at the survey visit in Harlow?

We look at the wall, the floor and ceiling either side and what sits above, measure the opening you want, and note cables, pipes and access for the steel. It usually takes under an hour and there is no charge.

Are goalpost frames welded or bolted?

Most domestic goalposts are bolted, with plates welded to the beam and columns in the fabrication shop and bolted together on site. That lets each piece be carried into the house separately. The engineer specifies the connection details, including whether the joints need to resist sway, and the fabricator makes the frame to suit.

Can a goalpost column go next to my neighbour's wall?

It can, but in England and Wales it may bring in the Party Wall etc. Act 1996. Digging a pad near a neighbour's building to below the level of its foundations, or fixing into a shared wall, can be notifiable. We arrange notices through a party wall surveyor where needed. There is no equivalent Act in Scotland or Northern Ireland.

How long does it take to install a steel goalpost?

Allow around one to two weeks on site for a typical job. Breaking out and digging the pads, the foundation inspection, pouring concrete and letting it gain strength take up much of that time. Erecting and bolting the frame itself is often done in a day, followed by inspection and boxing in.

Planning to take a wall out?

Book a free survey visit. You get an itemised written quote covering calculations, building control, steel and making good.