Steel BeamInstallers
Grey steel goalpost frame installed where a rear wall has been removed

Steel goalpost frames · Crowborough

Steel goalpost frames in Crowborough

Steelwork, approvals and making good for steel goalpost frames in Crowborough and nearby.

  • Itemised written quote
  • Beam sized by a structural engineer
  • Covering Crowborough and nearby

Free survey in Crowborough

Tell us about the steel goalpost frame job in Crowborough.

Please enter your name.
Please enter a UK phone number.
Please enter a valid email.
Please enter a UK postcode.
Please tell us a little about the job.
  • Free survey visit
  • Engineer's calculations arranged
  • Building control handled
  • Fixed written price once scope is agreed
  • England, Wales, mainland Scotland & NI

Steel goalpost frames in Crowborough: how it works

Crowborough has a mix of housing, and steel goalpost frames need a slightly different approach in each. The wider East Sussex area is covered as well. Whatever the age of the property, the steel goes in on proper bearings with temporary support in place throughout.

When a rear wall is opened almost corner to corner, or the brickwork either side is too thin, cracked or broken up by openings to take a concentrated load, a beam on padstones is not enough. A goalpost frame brings its own supports: two columns carry the beam's ends straight down to new foundations, so the walls around the opening are not relied on.

Things to plan for

  • In older homes with suspended timber ground floors, the column has to pass through the void to reach the pad. Air bricks, joists and the damp-proof course around each column are considered so ventilation and damp protection are not compromised.
  • Columns are commonly universal columns or square hollow sections, welded to steel base plates at the foot and cap plates at the head. Holding-down bolts fix the base plates to the pad, and grout fills the gap beneath once the frame is level.
  • A goalpost frame usually takes longer than a single beam because the pads need digging, inspecting, pouring and time to gain strength before the columns take load. The engineer sets when the frame can be loaded.
  • Keep the engineer's calculations, the frame drawings and the building control completion certificate together. They show a future buyer's surveyor how the opening is supported and save questions about the columns when the house is sold.
  • Each column usually needs its own concrete pad foundation, because a column delivers a heavy point load that an ordinary floor slab or old strip footing may not take. The engineer sets the pad size and depth from the load and the ground conditions found.

From survey to sign-off in Crowborough

  1. Look and measure

    We check the wall, the span you want and what the wall is carrying, and photograph anything the engineer needs to see.

  2. Design and price

    Calculations come back from the engineer and we confirm your fixed written price, line by line.

  3. Building control

    We submit a building notice or full plans application to the local council's building control team, so approval is in place before the wall is touched.

  4. Fit, inspect, finish

    The work is propped and the steel installed and packed tight. After inspection the opening is boxed, plastered and left clean.

How much should I budget in Crowborough?

As a guide, budget £2,250–£6,700 including VAT for steel goalpost frame in Crowborough, based on published UK cost guides adjusted for prices in the South East (+12%).

JobTypical guide rangeWhat it usually covers
Steel goalpost frame£2,250–£6,700Two posts and a beam bolted as a frame, pad foundations, base plates and fitting
Rear wall opening for bi-fold or sliding doors£2,800–£7,850External wall opened up to about 5 m with steel, propping, cavity tray and making good (doors supplied separately)
Steel column or post£560–£1,680 per columnColumn supplied and fitted with base and cap plates on a pad foundation
RSJ supply and fit (single beam)£900–£2,800 per beamBeam supplied, delivered, lifted and packed on padstones, with propping (calculations and approval priced separately)

Figures include our approximate regional adjustment for prices in the South East (+12%) and are rounded. How these figures are worked out.

Building rules for Crowborough

Structural openings in English homes need building regulations approval before work starts. The local council's building control team can deal with it, or you can use a registered building control approver. Either way the steel is inspected before it is covered, and a completion certificate is issued at the end. Keep it safe for when you sell.

If the beam bears into a wall you share with a neighbour, the Party Wall etc. Act 1996 applies, and a party structure notice must be served at least two months before that work starts. We arrange this through a party wall surveyor.

Building rules in England

Steel goalpost frames near Crowborough

Questions about steel goalpost frames in Crowborough

How soon can steel goalpost frames start in Crowborough?

Start dates depend on the engineer's calculations, the building control approval and, where needed, party wall notice periods. We give you a realistic timetable after the survey and keep you updated as each approval comes through.

Can I stay at home while the work is done in Crowborough?

Usually, yes. The work area is screened and floors are protected. The rooms either side of the opening are out of action for a few days, and there is some noise and dust while the masonry comes out.

What is a goalpost frame in an extension?

A goalpost frame is a steel beam sitting on two steel columns, bolted together so it stands as one unit. In an extension it is usually placed where the old rear wall was, holding up the house above while leaving a wide, clear opening. The columns rest on concrete pads, so the frame does not depend on the surrounding brickwork.

What is the difference between a goalpost and a portal frame?

A domestic goalpost is a simple version of a portal frame. Both use columns and a beam joined together, but a full portal frame has rigid joints designed to resist sideways loads on its own, as used in steel-framed industrial buildings. In a house, the engineer decides how rigid the goalpost joints need to be for that opening.

When do you need a goalpost instead of a steel beam?

You need a goalpost when the walls at either end of the opening cannot safely carry the beam. That happens when piers are too narrow, the masonry is weak or cracked, the opening runs almost wall to wall, or the footings below are unsuitable. The structural engineer makes the call after looking at the loads and the bearings available.

What happens at the survey visit in Crowborough?

We look at the wall, the floor and ceiling either side and what sits above, measure the opening you want, and note cables, pipes and access for the steel. It usually takes under an hour and there is no charge.

Planning to take a wall out?

Book a free survey visit. You get an itemised written quote covering calculations, building control, steel and making good.