
Steel goalpost frames · Heavitree
Steel goalpost frames in Heavitree
Steel goalpost frames for homes in EX1, EX2, EX3, designed by a structural engineer.
- Itemised written quote
- Beam sized by a structural engineer
- Covering Heavitree and nearby
- Free survey visit
- Engineer's calculations arranged
- Building control handled
- Fixed written price once scope is agreed
- England, Wales, mainland Scotland & NI
What steel goalpost frames involve in Heavitree
Planning steel goalpost frames in Heavitree? Our team covers EX1, EX2, EX3 and EX4 and the streets around them. It sits about 1.4 miles from Exeter, which we also cover. You get one written quote for the calculations, approvals, propping, steel and making good.
When a rear wall is opened almost corner to corner, or the brickwork either side is too thin, cracked or broken up by openings to take a concentrated load, a beam on padstones is not enough. A goalpost frame brings its own supports: two columns carry the beam's ends straight down to new foundations, so the walls around the opening are not relied on.
Worth knowing before you start
- Keep the engineer's calculations, the frame drawings and the building control completion certificate together. They show a future buyer's surveyor how the opening is supported and save questions about the columns when the house is sold.
- Price depends on the opening width, the loads the beam carries, the number of bolted connections, the depth of the pads and how easily the steel can be carried in. Any redesign after the ground is opened is priced before it goes ahead.
- A goalpost frame usually takes longer than a single beam because the pads need digging, inspecting, pouring and time to gain strength before the columns take load. The engineer sets when the frame can be loaded.
- Stability is part of the design, not just strength. A frame standing in a wide opening can sway sideways if the joints are too flexible, so the engineer decides whether the connections must be moment-resisting or whether the frame is tied back to the surrounding structure.
- A goalpost frame is structural work, so building regulations approval is needed in England and Wales, a building warrant before work in Scotland, and a building control application in Northern Ireland. The inspector typically wants to see the pad excavations as well as the finished steel.
Four stages, one team
Look and measure
We check the wall, the span you want and what the wall is carrying, and photograph anything the engineer needs to see.
Design and price
Calculations come back from the engineer and we confirm your fixed written price, line by line.
Building control
We submit a building notice or full plans application to the local council's building control team, so approval is in place before the wall is touched.
Fit, inspect, finish
The work is propped and the steel installed and packed tight. After inspection the opening is boxed, plastered and left clean.
Guide prices for steel goalpost frames in Heavitree
As a guide, budget £2,050–£6,200 including VAT for steel goalpost frame in Heavitree, based on published UK cost guides adjusted for prices in the South West (+3%).
| Job | Typical guide range | What it usually covers |
|---|---|---|
| Steel goalpost frame | £2,050–£6,200 | Two posts and a beam bolted as a frame, pad foundations, base plates and fitting |
| Opening into a rear extension | £2,600–£7,200 | Original rear wall removed with a beam or goalpost, approvals and propping, coordinated with the extension build |
| Rear wall opening for bi-fold or sliding doors | £2,600–£7,200 | External wall opened up to about 5 m with steel, propping, cavity tray and making good (doors supplied separately) |
| Steel column or post | £520–£1,540 per column | Column supplied and fitted with base and cap plates on a pad foundation |
Figures include our approximate regional adjustment for prices in the South West (+3%) and are rounded. How these figures are worked out.
Building rules for Heavitree
In England, taking out a load-bearing wall or putting in a beam is building work under the Building Regulations 2010. It needs approval from building control, either the local council's building control team or a registered building control approver, through a full plans application or a building notice. Part A covers the structure and Part B covers fire safety, which is why steel in homes is usually fire protected.
Terraced and semi-detached homes often need party wall notices, because cutting into a shared wall to take a beam end is notifiable under the Party Wall etc. Act 1996. Allow at least two months for the notice period unless your neighbour agrees sooner.
Questions about steel goalpost frames in Heavitree
Do I need a party wall agreement for steel goalpost frames in Heavitree?
Yes, if the beam bears into a shared wall: the Party Wall etc. Act 1996 applies in England and Wales, and a party structure notice must be served at least two months before that work starts. We arrange it through a party wall surveyor.
Can I stay at home while the work is done in Heavitree?
Usually, yes. The work area is screened and floors are protected. The rooms either side of the opening are out of action for a few days, and there is some noise and dust while the masonry comes out.
How long does it take to install a steel goalpost?
Allow around one to two weeks on site for a typical job. Breaking out and digging the pads, the foundation inspection, pouring concrete and letting it gain strength take up much of that time. Erecting and bolting the frame itself is often done in a day, followed by inspection and boxing in.
What is the difference between a goalpost and a portal frame?
A domestic goalpost is a simple version of a portal frame. Both use columns and a beam joined together, but a full portal frame has rigid joints designed to resist sideways loads on its own, as used in steel-framed industrial buildings. In a house, the engineer decides how rigid the goalpost joints need to be for that opening.
Can a goalpost frame be hidden?
Usually, yes. The columns can be boxed in with fire-rated plasterboard so they read as small piers, set inside new walls, or hidden within the line of an extension's side walls. The beam is boxed like any other steel. Some owners prefer to leave the frame exposed and painted as a design feature.
How much do steel goalpost frames cost in Heavitree?
As a guide, budget £2,050–£6,200 including VAT for steel goalpost frame in Heavitree, based on published UK cost guides adjusted for prices in the South West (+3%). The exact figure depends on the span, what the wall carries, access and the finish, and is fixed in writing once the scope is agreed.