Steel BeamInstallers
Grey steel goalpost frame installed where a rear wall has been removed

Steel goalpost frames · Derby

Steel goalpost frames in Derby

Steel goalpost frames for homes in DE1, DE3, DE21, designed by a structural engineer.

  • Survey, design and installation in one
  • Covering DE1, DE3, DE21
  • Inspected before it is covered

Free survey in Derby

Tell us about the steel goalpost frame job in Derby.

Please enter your name.
Please enter a UK phone number.
Please enter a valid email.
Please enter a UK postcode.
Please tell us a little about the job.
  • Free survey visit
  • Engineer's calculations arranged
  • Building control handled
  • Fixed written price once scope is agreed
  • England, Wales, mainland Scotland & NI

About our steel goalpost frames service in Derby

We carry out steel goalpost frames in Derby, covering the DE1, DE3, DE21, DE22 and DE23 postcode districts. We also cover the surrounding towns and villages in Derbyshire. The job starts with a free survey visit so the engineer's calculations are based on your actual walls, floors and loads.

We arrange the engineer's design, building control, the foundation pads, temporary propping and the fabricated frame, then box it in and make good. Everything is set out in one itemised written quote, and the price is fixed in writing once the layout and specification are agreed.

Things to plan for

  • While the old wall or piers come out, the floor, walls and roof above are held on props and needles. These stay in until the frame is fully bolted, levelled and packed, so the structure is never left without support.
  • Column pads can clash with drains, gas pipes and underfloor heating runs below the floor. These are located before digging, and if a drain runs where a pad needs to go, the engineer may move the column or redesign the pad.
  • Goalpost frames are made to measure, so accurate site dimensions matter. Floor-to-ceiling height, the finished floor level and the width between column positions are taken before fabrication, because a frame that is a few millimetres out cannot simply be trimmed on site.
  • Columns are commonly universal columns or square hollow sections, welded to steel base plates at the foot and cap plates at the head. Holding-down bolts fix the base plates to the pad, and grout fills the gap beneath once the frame is level.
  • A goalpost frame is structural work, so building regulations approval is needed in England and Wales, a building warrant before work in Scotland, and a building control application in Northern Ireland. The inspector typically wants to see the pad excavations as well as the finished steel.

Four stages, one team

  1. Look and measure

    We check the wall, the span you want and what the wall is carrying, and photograph anything the engineer needs to see.

  2. Design and price

    Calculations come back from the engineer and we confirm your fixed written price, line by line.

  3. Building control

    We submit a building notice or full plans application to Derby City Council, so approval is in place before the wall is touched.

  4. Fit, inspect, finish

    The work is propped and the steel installed and packed tight. After inspection the opening is boxed, plastered and left clean.

Guide prices for steel goalpost frames in Derby

As a guide, budget £1,950–£5,900 including VAT for steel goalpost frame in Derby, based on published UK cost guides adjusted for prices in the East Midlands (-2%).

JobTypical guide rangeWhat it usually covers
Steel goalpost frame£1,950–£5,900Two posts and a beam bolted as a frame, pad foundations, base plates and fitting
Opening into a rear extension£2,450–£6,850Original rear wall removed with a beam or goalpost, approvals and propping, coordinated with the extension build
Rear wall opening for bi-fold or sliding doors£2,450–£6,850External wall opened up to about 5 m with steel, propping, cavity tray and making good (doors supplied separately)
Steel column or post£490–£1,470 per columnColumn supplied and fitted with base and cap plates on a pad foundation

Figures include our approximate regional adjustment for prices in the East Midlands (-2%) and are rounded. How these figures are worked out.

Building rules for Derby

In England, taking out a load-bearing wall or putting in a beam is building work under the Building Regulations 2010. It needs approval from building control, either Derby City Council or a registered building control approver, through a full plans application or a building notice. Part A covers the structure and Part B covers fire safety, which is why steel in homes is usually fire protected.

If the beam bears into a wall you share with a neighbour, the Party Wall etc. Act 1996 applies, and a party structure notice must be served at least two months before that work starts. We arrange this through a party wall surveyor.

Building rules in England

Steel goalpost frames near Derby

Local questions answered

Do you also work near Derby?

Yes. We also cover nearby towns including Belper, Ilkeston, Heanor and Ripley.

How soon can steel goalpost frames start in Derby?

Start dates depend on the engineer's calculations, the building control approval and, where needed, party wall notice periods. We give you a realistic timetable after the survey and keep you updated as each approval comes through.

What is a goalpost frame in an extension?

A goalpost frame is a steel beam sitting on two steel columns, bolted together so it stands as one unit. In an extension it is usually placed where the old rear wall was, holding up the house above while leaving a wide, clear opening. The columns rest on concrete pads, so the frame does not depend on the surrounding brickwork.

Does a goalpost frame need foundations?

Yes, in most cases each column needs a concrete pad foundation beneath it. A column concentrates a lot of weight on a small area, and a normal floor slab is rarely designed for that. The engineer sizes each pad, and building control usually inspects the excavation before the concrete goes in.

Are goalpost frames welded or bolted?

Most domestic goalposts are bolted, with plates welded to the beam and columns in the fabrication shop and bolted together on site. That lets each piece be carried into the house separately. The engineer specifies the connection details, including whether the joints need to resist sway, and the fabricator makes the frame to suit.

Do I need a party wall agreement for steel goalpost frames in Derby?

Yes, if the beam bears into a shared wall: the Party Wall etc. Act 1996 applies in England and Wales, and a party structure notice must be served at least two months before that work starts. We arrange it through a party wall surveyor.

Planning to take a wall out?

Book a free survey visit. You get an itemised written quote covering calculations, building control, steel and making good.