Steel BeamInstallers
Grey steel goalpost frame installed where a rear wall has been removed

Steel goalpost frames · Ballycastle

Steel goalpost frames in Ballycastle

Steel goalpost frames for homes in BT54, designed by a structural engineer.

  • Price fixed in writing once scope is agreed
  • Building control arranged
  • Temporary works and making good included

Free survey in Ballycastle

Tell us about the steel goalpost frame job in Ballycastle.

Please enter your name.
Please enter a UK phone number.
Please enter a valid email.
Please enter a UK postcode.
Please tell us a little about the job.
  • Free survey visit
  • Engineer's calculations arranged
  • Building control handled
  • Fixed written price once scope is agreed
  • England, Wales, mainland Scotland & NI

About our steel goalpost frames service in Ballycastle

Our steel goalpost frames service in Ballycastle covers everything from the first visit to the completion paperwork. The wider Causeway Coast and Glens area is covered as well. Postcode districts we cover here include BT54.

When a rear wall is opened almost corner to corner, or the brickwork either side is too thin, cracked or broken up by openings to take a concentrated load, a beam on padstones is not enough. A goalpost frame brings its own supports: two columns carry the beam's ends straight down to new foundations, so the walls around the opening are not relied on.

Worth knowing before you start

  • Keep the engineer's calculations, the frame drawings and the building control completion certificate together. They show a future buyer's surveyor how the opening is supported and save questions about the columns when the house is sold.
  • A goalpost frame usually takes longer than a single beam because the pads need digging, inspecting, pouring and time to gain strength before the columns take load. The engineer sets when the frame can be loaded.
  • Goalpost frames are made to measure, so accurate site dimensions matter. Floor-to-ceiling height, the finished floor level and the width between column positions are taken before fabrication, because a frame that is a few millimetres out cannot simply be trimmed on site.
  • Columns are commonly universal columns or square hollow sections, welded to steel base plates at the foot and cap plates at the head. Holding-down bolts fix the base plates to the pad, and grout fills the gap beneath once the frame is level.
  • Each column usually needs its own concrete pad foundation, because a column delivers a heavy point load that an ordinary floor slab or old strip footing may not take. The engineer sets the pad size and depth from the load and the ground conditions found.

From survey to sign-off in Ballycastle

  1. Survey in Ballycastle

    We visit, look at the wall and what sits above it, measure the opening and note services, access and how the steel can be brought in.

  2. Engineer's design

    A structural engineer sizes the beam, padstones and any posts, and sets out the temporary support needed while the wall is out.

  3. Building control

    A full plans application or building notice goes to Causeway Coast and Glens Borough Council under the Building Regulations (Northern Ireland) 2012 before work begins.

  4. Install and sign-off

    Props go in, the opening is formed, the steel is set and packed, building control inspects it, and we make good.

What do steel goalpost frames cost in Ballycastle?

As a guide, budget £1,700–£5,150 including VAT for steel goalpost frame in Ballycastle, based on published UK cost guides adjusted for prices in Northern Ireland (-14%).

JobTypical guide rangeWhat it usually covers
Steel goalpost frame£1,700–£5,150Two posts and a beam bolted as a frame, pad foundations, base plates and fitting
Steel column or post£430–£1,290 per columnColumn supplied and fitted with base and cap plates on a pad foundation
Side return extension steelwork£3,000–£7,300Beams and posts along the old side wall line, propping and approvals (extension build extra)
Rear wall opening for bi-fold or sliding doors£2,150–£6,000External wall opened up to about 5 m with steel, propping, cavity tray and making good (doors supplied separately)

Figures include our approximate regional adjustment for prices in Northern Ireland (-14%) and are rounded. How these figures are worked out.

Approvals in Ballycastle

Building control in Ballycastle is run by Causeway Coast and Glens Borough Council. Beams and new openings are controlled work under the Northern Ireland regulations, so we apply before anything is removed and the steel is inspected before it is covered.

Northern Ireland has no Party Wall Act, so there is no statutory notice to serve. Where the steel bears into a shared wall, the title deeds and the general law apply, and agreeing the work with your neighbour in writing first is good practice.

Building rules in Northern Ireland

Steel goalpost frames near Ballycastle

Questions about steel goalpost frames in Ballycastle

Can I stay at home while the work is done in Ballycastle?

Usually, yes. The work area is screened and floors are protected. The rooms either side of the opening are out of action for a few days, and there is some noise and dust while the masonry comes out.

What happens at the survey visit in Ballycastle?

We look at the wall, the floor and ceiling either side and what sits above, measure the opening you want, and note cables, pipes and access for the steel. It usually takes under an hour and there is no charge.

Are goalpost frames welded or bolted?

Most domestic goalposts are bolted, with plates welded to the beam and columns in the fabrication shop and bolted together on site. That lets each piece be carried into the house separately. The engineer specifies the connection details, including whether the joints need to resist sway, and the fabricator makes the frame to suit.

Does a goalpost frame need foundations?

Yes, in most cases each column needs a concrete pad foundation beneath it. A column concentrates a lot of weight on a small area, and a normal floor slab is rarely designed for that. The engineer sizes each pad, and building control usually inspects the excavation before the concrete goes in.

Can a goalpost frame be hidden?

Usually, yes. The columns can be boxed in with fire-rated plasterboard so they read as small piers, set inside new walls, or hidden within the line of an extension's side walls. The beam is boxed like any other steel. Some owners prefer to leave the frame exposed and painted as a design feature.

Do you also work near Ballycastle?

Yes. We also cover nearby towns including Ballymoney, Portrush, Coleraine and Ballymena.

Planning to take a wall out?

Book a free survey visit. You get an itemised written quote covering calculations, building control, steel and making good.