Steel BeamInstallers
Steel column with a bolted base plate on a concrete pad supporting a beam

Steel columns & posts · Burgess Hill

Steel columns & posts in Burgess Hill

Steelwork, approvals and making good for steel columns & posts in Burgess Hill and nearby.

  • Price fixed in writing once scope is agreed
  • Building control arranged
  • Temporary works and making good included

Free survey in Burgess Hill

Tell us about the steel columns & post job in Burgess Hill.

Please enter your name.
Please enter a UK phone number.
Please enter a valid email.
Please enter a UK postcode.
Please tell us a little about the job.
  • Free survey visit
  • Engineer's calculations arranged
  • Building control handled
  • Fixed written price once scope is agreed
  • England, Wales, mainland Scotland & NI

What steel columns & posts involve in Burgess Hill

We carry out steel columns & posts in Burgess Hill, covering the BN6 and RH15 postcode districts. We also work in nearby Brighton, roughly 9.0 miles away. The job starts with a free survey visit so the engineer's calculations are based on your actual walls, floors and loads.

Sometimes the right support for a beam is not a wall at all. A long span can be broken in two with a slim post in the middle, a beam can land on a column where the masonry below is weak, or the corner of an L-shaped opening can be held up by a single post instead of a brick pier.

Worth knowing before you start

  • Adding a structural column is building work that building control needs to approve, with the pad usually inspected before concrete and the column before it is covered. The completion certificate at the end is the record to keep for any future sale.
  • Older properties sometimes have cast iron columns, timber posts or brick piers doing this job, especially in cellars and former shops. Their condition and capacity are often unknown, so the engineer assesses whether they can stay or need replacing with new steel.
  • While the existing support is removed or the new column goes in, props hold the beam and the structure above. They are only taken out once the column is fixed, packed tight at the head and grouted at the base.
  • A tall, slender column can buckle under load before the steel itself is overstressed. That is why the engineer checks the height between restraints as well as the weight carried, and why a taller column may need a heavier section.
  • Placing a post well can make an open-plan room work better. It can mark the edge of a kitchen island, frame a dining area or line up with a worktop end, so it reads as part of the design rather than an obstruction.

From survey to sign-off in Burgess Hill

  1. Survey in Burgess Hill

    We visit, look at the wall and what sits above it, measure the opening and note services, access and how the steel can be brought in.

  2. Engineer's design

    A structural engineer sizes the beam, padstones and any posts, and sets out the temporary support needed while the wall is out.

  3. Building control

    We submit a building notice or full plans application to the local council's building control team, so approval is in place before the wall is touched.

  4. Install and sign-off

    Props go in, the opening is formed, the steel is set and packed, building control inspects it, and we make good.

What do steel columns & posts cost in Burgess Hill?

As a guide, budget £560–£1,680 per column including VAT for steel column or post in Burgess Hill, based on published UK cost guides adjusted for prices in the South East (+12%).

JobTypical guide rangeWhat it usually covers
Steel column or post£560–£1,680 per columnColumn supplied and fitted with base and cap plates on a pad foundation
Structural calculations for a beam£280–£840Site measure or photos, beam and padstone design and calculations for building control
Steel goalpost frame£2,250–£6,700Two posts and a beam bolted as a frame, pad foundations, base plates and fitting
Kitchen-diner knock-through£2,800–£6,700Internal structural wall between kitchen and dining room, steel beam, approvals and making good (kitchen fitting extra)

Figures include our approximate regional adjustment for prices in the South East (+12%) and are rounded. How these figures are worked out.

Approvals in Burgess Hill

For Burgess Hill, building control is provided by the local council's building control team, or by a registered building control approver if preferred. We send them the engineer's calculations with a building notice or full plans application and book the inspections. Work done without approval can cause problems at sale and is far dearer to put right later.

If the beam bears into a wall you share with a neighbour, the Party Wall etc. Act 1996 applies, and a party structure notice must be served at least two months before that work starts. We arrange this through a party wall surveyor.

Building rules in England

Steel columns & posts near Burgess Hill

Steel columns & posts in Burgess Hill: your questions

Do you cover Burgess Hill for steel columns & posts?

Yes. We carry out steel columns & posts in Burgess Hill and the BN6 and RH15 postcode districts. Book a free survey visit and we will check the wall, arrange the engineer's calculations and send an itemised written quote.

Can you work on older or listed homes in Burgess Hill?

Yes. Older homes often have lime mortar, timber lintels or shallow footings, which the engineer allows for. Listed buildings need listed building consent for internal structural changes as well as building regulations approval, and that must be in place first.

Can I put a steel post in the middle of a beam?

Yes, a central post is a common way to support a long beam, and it often lets the engineer specify a shallower steel. The post needs its own foundation and has to sit somewhere that works with the room layout. The engineer compares a post against a single deeper beam and specifies whichever suits the loads and the space.

Do I need building control for a steel column?

Yes. A new structural column is building work under the building regulations in England and Wales, and needs a building warrant first in Scotland and a building control application in Northern Ireland. Inspectors normally check the foundation excavation and the fixed column before it is covered. We deal with the application, notices and inspection visits.

How long does it take to fit a steel post?

The column itself can often be fixed in a day, but the whole job usually spans a few working days. The floor is cut and the pad dug, building control inspects it, the concrete is poured and left to cure, and then the column goes in and is packed tight to the beam.

Do you also work near Burgess Hill?

Yes. We also cover nearby towns including Haywards Heath, Portslade, Hove and Brighton.

Planning to take a wall out?

Book a free survey visit. You get an itemised written quote covering calculations, building control, steel and making good.