Steel BeamInstallers
Steel column with a bolted base plate on a concrete pad supporting a beam

Steel columns & posts · Lincoln

Steel columns & posts in Lincoln

Steel columns & posts for homes in LN1, LN2, LN6, designed by a structural engineer.

  • Price fixed in writing once scope is agreed
  • Building control arranged
  • Temporary works and making good included

Free survey in Lincoln

Tell us about the steel columns & post job in Lincoln.

Please enter your name.
Please enter a UK phone number.
Please enter a valid email.
Please enter a UK postcode.
Please tell us a little about the job.
  • Free survey visit
  • Engineer's calculations arranged
  • Building control handled
  • Fixed written price once scope is agreed
  • England, Wales, mainland Scotland & NI

What steel columns & posts involve in Lincoln

We cover steel columns & posts in Lincoln (LN1, LN2, LN6) and the streets around it. The wider Lincolnshire area is covered as well. Each job is designed by a structural engineer and approved through local building control before work begins.

Sometimes the right support for a beam is not a wall at all. A long span can be broken in two with a slim post in the middle, a beam can land on a column where the masonry below is weak, or the corner of an L-shaped opening can be held up by a single post instead of a brick pier.

What to expect

  • While the existing support is removed or the new column goes in, props hold the beam and the structure above. They are only taken out once the column is fixed, packed tight at the head and grouted at the base.
  • Columns on upper floors cannot simply stand on joists. The load has to be traced down through the building to the ground, which can mean a column directly below, a beam to collect it, or a redesign of the layout.
  • Hollow sections, either square or circular, give a neat, slim profile and are common where a post stays on show. Universal columns have an H-shaped section and are often used where the post will be boxed in or built into a wall.
  • The base plate is welded to the foot of the column and fixed to the pad with holding-down bolts. A cap plate at the top bolts to the beam above, so the two act together and the beam cannot slide off its support.
  • Steel at floor level can corrode if it sits in damp. The detail at the base is designed to keep damp away, using grout, protective paint and the floor's damp-proof membrane, and a column in a cellar or garage may need a heavier coating.

From survey to sign-off in Lincoln

  1. Free visit

    A short visit to Lincoln to see the job, agree what you want and check the bearings, floors and services that affect the design.

  2. Calculations

    The engineer's calculations and a simple drawing are prepared for your opening and shared with you before anything is ordered.

  3. Building control

    We submit a building notice or full plans application to the local council's building control team, so approval is in place before the wall is touched.

  4. Steel in, made good

    On site we prop, open up, fit and pack the steel, then fire protect, box in and plaster once the inspection is done.

What do steel columns & posts cost in Lincoln?

As a guide, budget £490–£1,470 per column including VAT for steel column or post in Lincoln, based on published UK cost guides adjusted for prices in the East Midlands (-2%).

JobTypical guide rangeWhat it usually covers
Steel column or post£490–£1,470 per columnColumn supplied and fitted with base and cap plates on a pad foundation
Kitchen-diner knock-through£2,450–£5,900Internal structural wall between kitchen and dining room, steel beam, approvals and making good (kitchen fitting extra)
Steel goalpost frame£1,950–£5,900Two posts and a beam bolted as a frame, pad foundations, base plates and fitting
RSJ supply and fit (single beam)£780–£2,450 per beamBeam supplied, delivered, lifted and packed on padstones, with propping (calculations and approval priced separately)

Figures include our approximate regional adjustment for prices in the East Midlands (-2%) and are rounded. How these figures are worked out.

Building rules for Lincoln

In England, taking out a load-bearing wall or putting in a beam is building work under the Building Regulations 2010. It needs approval from building control, either the local council's building control team or a registered building control approver, through a full plans application or a building notice. Part A covers the structure and Part B covers fire safety, which is why steel in homes is usually fire protected.

If the beam bears into a wall you share with a neighbour, the Party Wall etc. Act 1996 applies, and a party structure notice must be served at least two months before that work starts. We arrange this through a party wall surveyor.

Building rules in England

Steel columns & posts near Lincoln

Local questions answered

How soon can steel columns & posts start in Lincoln?

Start dates depend on the engineer's calculations, the building control approval and, where needed, party wall notice periods. We give you a realistic timetable after the survey and keep you updated as each approval comes through.

How much do steel columns & posts cost in Lincoln?

As a guide, budget £490–£1,470 per column including VAT for steel column or post in Lincoln, based on published UK cost guides adjusted for prices in the East Midlands (-2%). The exact figure depends on the span, what the wall carries, access and the finish, and is fixed in writing once the scope is agreed.

Can I put a steel post in the middle of a beam?

Yes, a central post is a common way to support a long beam, and it often lets the engineer specify a shallower steel. The post needs its own foundation and has to sit somewhere that works with the room layout. The engineer compares a post against a single deeper beam and specifies whichever suits the loads and the space.

How thin can a steel support post be?

It depends entirely on the load, the height and how the post is restrained, so there is no standard size. Hollow sections often give the slimmest look for a given strength, and an engineer can sometimes reduce the section by adding restraint partway up. They specify the exact section after calculating the load.

Can a steel column be left exposed?

Yes, many people leave a column on show, painted to suit the room. In homes exposed steel commonly needs fire protection, often intumescent paint applied to the specified thickness as part of a compatible paint system. Building control checks the protection meets what was specified. Boxing in with fire-rated plasterboard is the alternative where a hidden column is preferred.

Who approves steel columns & posts in Lincoln?

Structural work in Lincoln needs a building notice or full plans application to the local council's building control team or a registered building control approver. We prepare and submit it with the structural engineer's calculations and arrange the inspections, so the completion paperwork follows the job.

Planning to take a wall out?

Book a free survey visit. You get an itemised written quote covering calculations, building control, steel and making good.