Steel BeamInstallers
Steel column with a bolted base plate on a concrete pad supporting a beam

Steel columns & posts · Aberdeen

Steel columns & posts in Aberdeen

Steel columns & posts across Aberdeen, designed by a structural engineer and built under a building warrant.

  • Survey, design and installation in one
  • Covering AB10, AB11, AB12, AB13
  • Inspected before it is covered

Free survey in Aberdeen

Tell us about your steel columns & posts project in Aberdeen.

Please enter your name.
Please enter a UK phone number.
Please enter a valid email.
Please enter a UK postcode.
Please tell us a little about the job.
  • Free survey visit
  • Engineer's calculations arranged
  • Building control handled
  • Fixed written price once scope is agreed
  • England, Wales, mainland Scotland & NI

Steel columns & posts in Aberdeen: how it works

A steel column is an upright structural element that collects the load from a beam, floor or roof and carries it down to a foundation. In homes it is usually a square or circular hollow section or a universal column, welded to a base plate fixed to a concrete pad, and sized by a structural engineer for the load it carries.

Steel columns & posts in Aberdeen follows the same careful process wherever the property is: a survey, an engineer's design, the right approval and safe temporary works. We cover the whole area, from the centre out to the suburbs. We price it all up front so there are no surprises once the wall is open.

Worth knowing before you start

  • While the existing support is removed or the new column goes in, props hold the beam and the structure above. They are only taken out once the column is fixed, packed tight at the head and grouted at the base.
  • Steel at floor level can corrode if it sits in damp. The detail at the base is designed to keep damp away, using grout, protective paint and the floor's damp-proof membrane, and a column in a cellar or garage may need a heavier coating.
  • A tall, slender column can buckle under load before the steel itself is overstressed. That is why the engineer checks the height between restraints as well as the weight carried, and why a taller column may need a heavier section.
  • The base plate is welded to the foot of the column and fixed to the pad with holding-down bolts. A cap plate at the top bolts to the beam above, so the two act together and the beam cannot slide off its support.
  • Underfloor heating pipes, drains and cables in the slab can sit right where a pad is wanted. These are traced before cutting, and the column position is adjusted where possible rather than damaging a heating loop or drain run.

How the job runs in Aberdeen

  1. Survey in Aberdeen

    We visit, look at the wall and what sits above it, measure the opening and note services, access and how the steel can be brought in.

  2. Engineer's design

    A structural engineer sizes the beam, padstones and any posts, and sets out the temporary support needed while the wall is out.

  3. Building warrant

    A building warrant is applied for from Aberdeen City Council, and work starts only once the warrant has been granted.

  4. Install and sign-off

    Props go in, the opening is formed, the steel is set and packed, building standards inspects it, and we make good.

How much should I budget in Aberdeen?

As a guide, budget £460–£1,360 per column including VAT for steel column or post in Aberdeen, based on published UK cost guides adjusted for prices in Scotland (-9%).

JobTypical guide rangeWhat it usually covers
Steel column or post£460–£1,360 per columnColumn supplied and fitted with base and cap plates on a pad foundation
Fire protection to a steel beam£140–£550 per beamFire-rated board boxing or an intumescent coating system as specified
Kitchen-diner knock-through£2,300–£5,450Internal structural wall between kitchen and dining room, steel beam, approvals and making good (kitchen fitting extra)
Structural calculations for a beam£230–£680Site measure or photos, beam and padstone design and calculations for building standards

Figures include our approximate regional adjustment for prices in Scotland (-9%) and are rounded. How these figures are worked out.

Building rules for Aberdeen

Scottish rules are stricter on timing than in England: the building warrant must be in place before the wall is touched. We prepare the application with the engineer's calculations and submit it to Aberdeen City Council. The finished work is then certified and a completion certificate submitted for acceptance.

Scotland has no Party Wall Act. Work affecting a shared wall is governed by your title deeds and the general law, and in flats by the Tenements (Scotland) Act 2004, so it is sensible to agree the work with neighbours in writing before starting.

Building rules in Scotland

Steel columns & posts in Aberdeen: your questions

Can I stay at home while the work is done in Aberdeen?

Usually, yes. The work area is screened and floors are protected. The rooms either side of the opening are out of action for a few days, and there is some noise and dust while the masonry comes out.

What happens at the survey visit in Aberdeen?

We look at the wall, the floor and ceiling either side and what sits above, measure the opening you want, and note cables, pipes and access for the steel. It usually takes under an hour and there is no charge.

Can a steel post replace a supporting wall?

Yes, in many layouts a wall can come out with a beam above it and one or more posts taking the beam's load down to the ground. This keeps most of the openness while shortening the span. The engineer decides how many posts are needed and where they can go.

What is the difference between a column and a padstone?

A padstone is a block bedded into a wall to spread a beam's load into the masonry beneath. A column replaces the need for a wall altogether, carrying the load down to its own foundation. Where the wall below a beam end is too weak for a padstone, the engineer may call for a column instead.

Can you replace an old timber or cast iron post?

Usually, yes. Old posts in cellars, garages and converted shops are often undersized, rotten or of unknown strength. The engineer assesses the load they carry and specifies a new steel column and pad. The structure is propped while the old post comes out, and the new column is packed tight before the props are removed.

How long does it take to fit a steel post?

The column itself can often be fixed in a day, but the whole job usually spans a few working days. The floor is cut and the pad dug, building standards inspects it, the concrete is poured and left to cure, and then the column goes in and is packed tight to the beam.

Who approves steel columns & posts in Aberdeen?

Structural work in Aberdeen needs a building warrant from Aberdeen City Council, granted before work starts. We prepare and submit it with the structural engineer's calculations and arrange the inspections, so the completion paperwork follows the job.

Planning to take a wall out?

Book a free survey visit. You get an itemised written quote covering calculations, building control, steel and making good.