Steel BeamInstallers
Victorian side return extension with grey steel beams and roof rafters

Side return extension steels · West Lothian

Side return extension steels in West Lothian

Side return extension steels across West Lothian, designed by a structural engineer and built under a building warrant.

  • Survey, design and installation in one
  • Covering EH27, EH47, EH48, EH49
  • Inspected before it is covered

Free survey in West Lothian

Tell us about your side return extension steels project in West Lothian.

Please enter your name.
Please enter a UK phone number.
Please enter a valid email.
Please enter a UK postcode.
Please tell us a little about the job.
  • Free survey visit
  • Engineer's calculations arranged
  • Building control handled
  • Fixed written price once scope is agreed
  • England, Wales, mainland Scotland & NI

What side return extension steels involve in West Lothian

Side return extension steels are the beams and columns that replace the side wall of a terraced house's rear wing when the narrow passage beside it is built over. Sized by a structural engineer, they carry the wall, floor and roof loads above along the line of the old wall, so the kitchen and the infilled side return become one wide room.

From the first survey visit to the completion certificate, we take care of side return extension steels across West Lothian. We can survey in places such as Livingston, Bathgate and Broxburn and the villages around them. The engineer sizes the steel, we deal with West Lothian Council, and our team fits and packs the beam before making good.

What to expect

  • Where the beam along the old side wall meets a beam across the main house, the junction carries a heavy point load. The engineer usually details a column or a bolted connection there, which needs a solid foundation beneath it.
  • The side wall of a typical outrigger carries the first-floor wall above it, and sometimes the rear wing's roof and the joists of the room over the kitchen. That is why taking it out calls for a beam along its full length.
  • Bathrooms above outriggers are common, and their floors carry baths, tiles and water. The engineer allows for those loads, and any soil pipe or waste running down the side wall is rerouted before the wall comes out.
  • Fitting the steel frame for a side return usually takes a few working days on site, depending on how many beams and columns there are. It is scheduled with the builder so the new space can be roofed and weathertight soon after the old wall comes down.
  • Side passages often carry the house drains and rainwater pipes from the outrigger roof. Manholes and pipe runs are located early, and a shared or public sewer under the passage may need the water company's agreement before building over or near it.

What happens, step by step

  1. Survey in West Lothian

    We visit, look at the wall and what sits above it, measure the opening and note services, access and how the steel can be brought in.

  2. Engineer's design

    A structural engineer sizes the beam, padstones and any posts, and sets out the temporary support needed while the wall is out.

  3. Building warrant

    A building warrant is applied for from West Lothian Council, and work starts only once the warrant has been granted.

  4. Install and sign-off

    Props go in, the opening is formed, the steel is set and packed, building standards inspects it, and we make good.

How much should I budget in West Lothian?

As a guide, budget £3,200–£7,750 including VAT for side return extension steelwork in West Lothian, based on published UK cost guides adjusted for prices in Scotland (-9%).

JobTypical guide rangeWhat it usually covers
Side return extension steelwork£3,200–£7,750Beams and posts along the old side wall line, propping and approvals (extension build extra)
Opening into a rear extension£2,300–£6,350Original rear wall removed with a beam or goalpost, approvals and propping, coordinated with the extension build
Steel column or post£460–£1,360 per columnColumn supplied and fitted with base and cap plates on a pad foundation

Figures include our approximate regional adjustment for prices in Scotland (-9%) and are rounded. How these figures are worked out.

Approvals in West Lothian

In Scotland, structural alterations need a building warrant under the Building (Scotland) Act 2003, and work must not start until the warrant is granted. For West Lothian, warrants are handled by West Lothian Council's building standards service. When the work is finished, a completion certificate is submitted and has to be accepted by the council.

Scotland has no Party Wall Act. Work affecting a shared wall is governed by your title deeds and the general law, and in flats by the Tenements (Scotland) Act 2004, so it is sensible to agree the work with neighbours in writing before starting.

Building rules in Scotland

Side return extension steels by town

Side return extension steels in West Lothian: your questions

Can you work on older or listed homes in West Lothian?

Yes. Older homes often have lime mortar, timber lintels or shallow footings, which the engineer allows for. Listed buildings need listed building consent for internal structural changes as well as building regulations approval, and that must be in place first.

How much do side return extension steels cost in West Lothian?

As a guide, budget £3,200–£7,750 including VAT for side return extension steelwork in West Lothian, based on published UK cost guides adjusted for prices in Scotland (-9%). The exact figure depends on the span, what the wall carries, access and the finish, and is fixed in writing once the scope is agreed.

Can a side return be built over a drain?

Sometimes, but drains in side passages need checking early. A shared or public sewer may need the water company's agreement before building over or close to it, and column foundations may have to avoid the pipe run. Manholes may need moving or adapting as part of the wider build.

Do I need planning permission for a side return extension?

It depends on the house and where it is. Some side return infills can be built under permitted development, but the rules for side extensions are restrictive, and conservation areas and listed buildings add further controls. Check with your local planning authority or architect before committing to a design.

Why does a side return need columns?

Columns are used where two beams meet or where there is not enough solid wall to carry the end of a beam. The column takes the concentrated load down to a pad foundation in the ground. Sometimes it can be hidden in a wall nib or boxed in neatly.

How long does it take to fit side return steels?

Most side return steel frames take two to five working days on site, depending on the number of beams and columns and how easy access is. That covers propping, removing the old side wall, fitting the steels and packing them. Fire protection and finishes follow afterwards.

What happens at the survey visit in West Lothian?

We look at the wall, the floor and ceiling either side and what sits above, measure the opening you want, and note cables, pipes and access for the steel. It usually takes under an hour and there is no charge.

Planning to take a wall out?

Book a free survey visit. You get an itemised written quote covering calculations, building control, steel and making good.