
Side return extension steels · Nottingham
Side return extension steels in Nottingham
Steelwork, approvals and making good for side return extension steels in Nottingham and nearby.
- Free survey visit in Nottingham
- Engineer's calculations arranged
- Building control handled for you
- Free survey visit
- Engineer's calculations arranged
- Building control handled
- Fixed written price once scope is agreed
- England, Wales, mainland Scotland & NI
About our side return extension steels service in Nottingham
Our side return extension steels service in Nottingham covers everything from the first visit to the completion paperwork. We also cover the surrounding towns and villages in Nottinghamshire. Postcode districts we cover here include NG1, NG3, NG5, NG7 and NG8.
Many Victorian and Edwardian terraces have a narrow back wing, often called an outrigger, with a strip of yard down one side. Infilling that strip turns a galley kitchen into a wide family room, but the outrigger's side wall usually holds up a bathroom or bedroom above, so it has to be replaced with steel.
What to expect
- The kitchen is usually out of use while the side wall comes down and the frame goes in, so many households set up a temporary kitchen elsewhere in the house. The rest of the property normally stays in use throughout the steel stage.
- Fitting the steel frame for a side return usually takes a few working days on site, depending on how many beams and columns there are. It is scheduled with the builder so the new space can be roofed and weathertight soon after the old wall comes down.
- The number of beams, columns and connections drives steel cost more than the length of the side return alone. Keep the calculations, any party wall paperwork and the completion certificate together for when the house is sold.
- Many outrigger kitchens have a chimney breast on the side wall being removed or on the party wall. Its position affects where beams can bear, and if any part of the breast is taken out, what remains above has to be supported as the engineer specifies.
- Victorian outrigger walls are often a single brick thick in soft lime mortar, sometimes on very shallow footings. The engineer may ask for trial holes before deciding whether new foundations are needed under the column positions or beam ends.
From survey to sign-off in Nottingham
Free visit
A short visit to Nottingham to see the job, agree what you want and check the bearings, floors and services that affect the design.
Calculations
The engineer's calculations and a simple drawing are prepared for your opening and shared with you before anything is ordered.
Building control
We submit a building notice or full plans application to Nottingham City Council, so approval is in place before the wall is touched.
Steel in, made good
On site we prop, open up, fit and pack the steel, then fire protect, box in and plaster once the inspection is done.
Guide prices for side return extension steels in Nottingham
As a guide, budget £3,450–£8,350 including VAT for side return extension steelwork in Nottingham, based on published UK cost guides adjusted for prices in the East Midlands (-2%).
| Job | Typical guide range | What it usually covers |
|---|---|---|
| Side return extension steelwork | £3,450–£8,350 | Beams and posts along the old side wall line, propping and approvals (extension build extra) |
| Steel column or post | £490–£1,470 per column | Column supplied and fitted with base and cap plates on a pad foundation |
| Opening into a rear extension | £2,450–£6,850 | Original rear wall removed with a beam or goalpost, approvals and propping, coordinated with the extension build |
| Temporary works and propping | £150–£490 | Props, spreaders, needles and sole plates for a typical opening, installed and struck |
Figures include our approximate regional adjustment for prices in the East Midlands (-2%) and are rounded. How these figures are worked out.
Approvals in Nottingham
In England, taking out a load-bearing wall or putting in a beam is building work under the Building Regulations 2010. It needs approval from building control, either Nottingham City Council or a registered building control approver, through a full plans application or a building notice. Part A covers the structure and Part B covers fire safety, which is why steel in homes is usually fire protected.
Terraced and semi-detached homes often need party wall notices, because cutting into a shared wall to take a beam end is notifiable under the Party Wall etc. Act 1996. Allow at least two months for the notice period unless your neighbour agrees sooner.
Side return extension steels near Nottingham
- West Bridgford 1.9 mi
- Arnold 3.3 mi
- Hucknall 5.9 mi
- Long Eaton 6.3 mi
- Ilkeston 6.7 mi
- Heanor 9.4 mi
Questions about side return extension steels in Nottingham
What happens at the survey visit in Nottingham?
We look at the wall, the floor and ceiling either side and what sits above, measure the opening you want, and note cables, pipes and access for the steel. It usually takes under an hour and there is no charge.
Can I stay at home while the work is done in Nottingham?
Usually, yes. The work area is screened and floors are protected. The rooms either side of the opening are out of action for a few days, and there is some noise and dust while the masonry comes out.
Does a glazed roof affect the steel beam?
Yes. Glazed roofs need the beam they sit on to stay very straight under load, so the engineer may set a stricter deflection limit than for a solid roof. That can mean a deeper or heavier steel section, and the roof supplier's details need sharing early.
How long does it take to fit side return steels?
Most side return steel frames take two to five working days on site, depending on the number of beams and columns and how easy access is. That covers propping, removing the old side wall, fitting the steels and packing them. Fire protection and finishes follow afterwards.
What steels do I need for a side return extension?
Usually a long beam along the line of the old outrigger side wall, often a second beam opening the back of the main house, and one or more columns where the loads meet. The exact arrangement depends on the house and the layout, and a structural engineer specifies every beam, column and connection.