About our side return extension steels service in Dungannon
For homes in Dungannon and the BT71 district, we handle side return extension steels from survey to sign-off. We also cover the surrounding towns and villages in Mid Ulster. The beam is sized by a structural engineer and inspected before it is boxed in.
Many Victorian and Edwardian terraces have a narrow back wing, often called an outrigger, with a strip of yard down one side. Infilling that strip turns a galley kitchen into a wide family room, but the outrigger's side wall usually holds up a bathroom or bedroom above, so it has to be replaced with steel.
Key points for your project
- Side passages often carry the house drains and rainwater pipes from the outrigger roof. Manholes and pipe runs are located early, and a shared or public sewer under the passage may need the water company's agreement before building over or near it.
- The side wall of a typical outrigger carries the first-floor wall above it, and sometimes the rear wing's roof and the joists of the room over the kitchen. That is why taking it out calls for a beam along its full length.
- Propping a side return is awkward because space in a narrow kitchen is tight and the infill side is often open ground. Props outside may stand on temporary pads or boards, set so they do not sink or shift in wet weather.
- Fitting the steel frame for a side return usually takes a few working days on site, depending on how many beams and columns there are. It is scheduled with the builder so the new space can be roofed and weathertight soon after the old wall comes down.
- Some owners leave the long beam on show as a feature under a glazed roof. Exposed steel still needs fire protection where building control requires it, which usually means a specified intumescent paint system applied to the correct thickness.
From survey to sign-off in Dungannon
Free visit
A short visit to Dungannon to see the job, agree what you want and check the bearings, floors and services that affect the design.
Calculations
The engineer's calculations and a simple drawing are prepared for your opening and shared with you before anything is ordered.
Building control
A full plans application or building notice goes to Mid Ulster District Council under the Building Regulations (Northern Ireland) 2012 before work begins.
Steel in, made good
On site we prop, open up, fit and pack the steel, then fire protect, box in and plaster once the inspection is done.
What do side return extension steels cost in Dungannon?
As a guide, budget £3,000–£7,300 including VAT for side return extension steelwork in Dungannon, based on published UK cost guides adjusted for prices in Northern Ireland (-14%).
| Job | Typical guide range | What it usually covers |
|---|---|---|
| Side return extension steelwork | £3,000–£7,300 | Beams and posts along the old side wall line, propping and approvals (extension build extra) |
| Structural calculations for a beam | £220–£640 | Site measure or photos, beam and padstone design and calculations for building control |
| Temporary works and propping | £130–£430 | Props, spreaders, needles and sole plates for a typical opening, installed and struck |
Figures include our approximate regional adjustment for prices in Northern Ireland (-14%) and are rounded. How these figures are worked out.
Building control and neighbours in Dungannon
In Northern Ireland, structural work comes under the Building Regulations (Northern Ireland) 2012 and is approved by the local council's building control. For Dungannon that is Mid Ulster District Council. We submit a full plans application or building notice before work starts and book the inspections.
The Party Wall etc. Act does not extend to Northern Ireland. Shared walls are dealt with under your title and the general law, so we recommend agreeing access and the work with your neighbour before it starts.
Questions about side return extension steels in Dungannon
Do you also work near Dungannon?
Yes. We also cover nearby towns including Cookstown, Portadown, Craigavon and Magherafelt.
What happens at the survey visit in Dungannon?
We look at the wall, the floor and ceiling either side and what sits above, measure the opening you want, and note cables, pipes and access for the steel. It usually takes under an hour and there is no charge.
How long does it take to fit side return steels?
Most side return steel frames take two to five working days on site, depending on the number of beams and columns and how easy access is. That covers propping, removing the old side wall, fitting the steels and packing them. Fire protection and finishes follow afterwards.
Why does a side return need columns?
Columns are used where two beams meet or where there is not enough solid wall to carry the end of a beam. The column takes the concentrated load down to a pad foundation in the ground. Sometimes it can be hidden in a wall nib or boxed in neatly.
Can the outrigger wall be removed without affecting the bathroom above?
Yes, when it is properly propped and replaced with steel designed for the load. The floor and wall above are supported throughout, and the bathroom stays usable in most cases. Waste pipes or soil stacks on the wall being removed are rerouted first so nothing is disturbed when it comes down.
How much do side return extension steels cost in Dungannon?
As a guide, budget £3,000–£7,300 including VAT for side return extension steelwork in Dungannon, based on published UK cost guides adjusted for prices in Northern Ireland (-14%). The exact figure depends on the span, what the wall carries, access and the finish, and is fixed in writing once the scope is agreed.