Steel BeamInstallers
Victorian side return extension with grey steel beams and roof rafters

Side return extension steels · Streatham

Side return extension steels in Streatham

Steelwork, approvals and making good for side return extension steels in Streatham and nearby.

  • Free survey visit in Streatham
  • Engineer's calculations arranged
  • Building control handled for you

Free survey in Streatham

Tell us about the side return extension steel job in Streatham.

Please enter your name.
Please enter a UK phone number.
Please enter a valid email.
Please enter a UK postcode.
Please tell us a little about the job.
  • Free survey visit
  • Engineer's calculations arranged
  • Building control handled
  • Fixed written price once scope is agreed
  • England, Wales, mainland Scotland & NI

What side return extension steels involve in Streatham

For homes in Streatham and the CR4, SE21, SE27, SW2 and SW4 districts, we handle side return extension steels from survey to sign-off. The wider London area is covered as well. The beam is sized by a structural engineer and inspected before it is boxed in.

Many Victorian and Edwardian terraces have a narrow back wing, often called an outrigger, with a strip of yard down one side. Infilling that strip turns a galley kitchen into a wide family room, but the outrigger's side wall usually holds up a bathroom or bedroom above, so it has to be replaced with steel.

What to expect

  • Fitting the steel frame for a side return usually takes a few working days on site, depending on how many beams and columns there are. It is scheduled with the builder so the new space can be roofed and weathertight soon after the old wall comes down.
  • Planning rules for side return infills depend on the house and its location, and some need a full planning application rather than relying on permitted development. The steel design forms part of the building regulations approval either way.
  • Where the beam along the old side wall meets a beam across the main house, the junction carries a heavy point load. The engineer usually details a column or a bolted connection there, which needs a solid foundation beneath it.
  • Bathrooms above outriggers are common, and their floors carry baths, tiles and water. The engineer allows for those loads, and any soil pipe or waste running down the side wall is rerouted before the wall comes out.
  • Many outrigger kitchens have a chimney breast on the side wall being removed or on the party wall. Its position affects where beams can bear, and if any part of the breast is taken out, what remains above has to be supported as the engineer specifies.

Four stages, one team

  1. Survey in Streatham

    We visit, look at the wall and what sits above it, measure the opening and note services, access and how the steel can be brought in.

  2. Engineer's design

    A structural engineer sizes the beam, padstones and any posts, and sets out the temporary support needed while the wall is out.

  3. Building control

    We submit a building notice or full plans application to the local council's building control team, so approval is in place before the wall is touched.

  4. Install and sign-off

    Props go in, the opening is formed, the steel is set and packed, building control inspects it, and we make good.

How much should I budget in Streatham?

As a guide, budget £4,500–£10,900 including VAT for side return extension steelwork in Streatham, based on published UK cost guides adjusted for London prices (+28%).

JobTypical guide rangeWhat it usually covers
Side return extension steelwork£4,500–£10,900Beams and posts along the old side wall line, propping and approvals (extension build extra)
Fire protection to a steel beam£190–£770 per beamFire-rated board boxing or an intumescent coating system as specified
Steel column or post£640–£1,920 per columnColumn supplied and fitted with base and cap plates on a pad foundation
Structural calculations for a beam£320–£960Site measure or photos, beam and padstone design and calculations for building control

Figures include our approximate regional adjustment for London prices (+28%) and are rounded. How these figures are worked out.

Building control and neighbours in Streatham

In England, taking out a load-bearing wall or putting in a beam is building work under the Building Regulations 2010. It needs approval from building control, either the local council's building control team or a registered building control approver, through a full plans application or a building notice. Part A covers the structure and Part B covers fire safety, which is why steel in homes is usually fire protected.

Terraced and semi-detached homes often need party wall notices, because cutting into a shared wall to take a beam end is notifiable under the Party Wall etc. Act 1996. Allow at least two months for the notice period unless your neighbour agrees sooner.

Building rules in England

Side return extension steels near Streatham

Local questions answered

What happens at the survey visit in Streatham?

We look at the wall, the floor and ceiling either side and what sits above, measure the opening you want, and note cables, pipes and access for the steel. It usually takes under an hour and there is no charge.

How soon can side return extension steels start in Streatham?

Start dates depend on the engineer's calculations, the building control approval and, where needed, party wall notice periods. We give you a realistic timetable after the survey and keep you updated as each approval comes through.

What steels do I need for a side return extension?

Usually a long beam along the line of the old outrigger side wall, often a second beam opening the back of the main house, and one or more columns where the loads meet. The exact arrangement depends on the house and the layout, and a structural engineer specifies every beam, column and connection.

Can the steel beam be left exposed in a side return?

Yes, and many people like the look of exposed steel under a glazed roof. It usually still needs fire protection, so it is coated with an intumescent paint system to the specified thickness, then finished in your chosen colour. The engineer and building control confirm what protection is required.

Can the outrigger wall be removed without affecting the bathroom above?

Yes, when it is properly propped and replaced with steel designed for the load. The floor and wall above are supported throughout, and the bathroom stays usable in most cases. Waste pipes or soil stacks on the wall being removed are rerouted first so nothing is disturbed when it comes down.

Who approves side return extension steels in Streatham?

Structural work in Streatham needs a building notice or full plans application to the local council's building control team or a registered building control approver. We prepare and submit it with the structural engineer's calculations and arrange the inspections, so the completion paperwork follows the job.

Planning to take a wall out?

Book a free survey visit. You get an itemised written quote covering calculations, building control, steel and making good.