Steel BeamInstallers
Victorian side return extension with grey steel beams and roof rafters

Side return extension steels · Portsmouth

Side return extension steels in Portsmouth

Side return extension steels in Portsmouth, from free survey to completion certificate.

  • Free survey visit in Portsmouth
  • Engineer's calculations arranged
  • Building control handled for you

Free survey in Portsmouth

Tell us about the side return extension steel job in Portsmouth.

Please enter your name.
Please enter a UK phone number.
Please enter a valid email.
Please enter a UK postcode.
Please tell us a little about the job.
  • Free survey visit
  • Engineer's calculations arranged
  • Building control handled
  • Fixed written price once scope is agreed
  • England, Wales, mainland Scotland & NI

What side return extension steels involve in Portsmouth

If you live in Portsmouth, side return extension steels can usually be planned and priced after a single survey visit. We also cover the surrounding towns and villages in Hampshire. We cover PO1, PO2, PO3, PO4 and PO5, and we fix the price in writing once the layout and scope are agreed.

Many Victorian and Edwardian terraces have a narrow back wing, often called an outrigger, with a strip of yard down one side. Infilling that strip turns a galley kitchen into a wide family room, but the outrigger's side wall usually holds up a bathroom or bedroom above, so it has to be replaced with steel.

What to expect

  • Glazed roofs over side returns are usually made to measure and need an edge that stays straight and level. The engineer may set a stiffer limit on how far the steel can deflect so the glazing is not stressed once loaded.
  • Side passages often carry the house drains and rainwater pipes from the outrigger roof. Manholes and pipe runs are located early, and a shared or public sewer under the passage may need the water company's agreement before building over or near it.
  • Many outrigger kitchens have a chimney breast on the side wall being removed or on the party wall. Its position affects where beams can bear, and if any part of the breast is taken out, what remains above has to be supported as the engineer specifies.
  • Some owners leave the long beam on show as a feature under a glazed roof. Exposed steel still needs fire protection where building control requires it, which usually means a specified intumescent paint system applied to the correct thickness.
  • Planning rules for side return infills depend on the house and its location, and some need a full planning application rather than relying on permitted development. The steel design forms part of the building regulations approval either way.

Four stages, one team

  1. Free visit

    A short visit to Portsmouth to see the job, agree what you want and check the bearings, floors and services that affect the design.

  2. Calculations

    The engineer's calculations and a simple drawing are prepared for your opening and shared with you before anything is ordered.

  3. Building control

    We submit a building notice or full plans application to Portsmouth City Council, so approval is in place before the wall is touched.

  4. Steel in, made good

    On site we prop, open up, fit and pack the steel, then fire protect, box in and plaster once the inspection is done.

What do side return extension steels cost in Portsmouth?

As a guide, budget £3,900–£9,500 including VAT for side return extension steelwork in Portsmouth, based on published UK cost guides adjusted for prices in the South East (+12%).

JobTypical guide rangeWhat it usually covers
Side return extension steelwork£3,900–£9,500Beams and posts along the old side wall line, propping and approvals (extension build extra)
Structural calculations for a beam£280–£840Site measure or photos, beam and padstone design and calculations for building control
Party wall surveyor (agreed surveyor, per neighbour)£1,000–£2,250 per neighbourSchedule of condition and award where a neighbour dissents; serving notice alone, where the neighbour consents, costs far less (England and Wales only)
Steel column or post£560–£1,680 per columnColumn supplied and fitted with base and cap plates on a pad foundation

Figures include our approximate regional adjustment for prices in the South East (+12%) and are rounded. How these figures are worked out.

Building rules for Portsmouth

In England, taking out a load-bearing wall or putting in a beam is building work under the Building Regulations 2010. It needs approval from building control, either Portsmouth City Council or a registered building control approver, through a full plans application or a building notice. Part A covers the structure and Part B covers fire safety, which is why steel in homes is usually fire protected.

If the beam bears into a wall you share with a neighbour, the Party Wall etc. Act 1996 applies, and a party structure notice must be served at least two months before that work starts. We arrange this through a party wall surveyor.

Building rules in England

Side return extension steels near Portsmouth

Side return extension steels in Portsmouth: your questions

Can I stay at home while the work is done in Portsmouth?

Usually, yes. The work area is screened and floors are protected. The rooms either side of the opening are out of action for a few days, and there is some noise and dust while the masonry comes out.

Do you also work near Portsmouth?

Yes. We also cover nearby towns including Gosport, Fareham, Havant and Waterlooville.

Can the outrigger wall be removed without affecting the bathroom above?

Yes, when it is properly propped and replaced with steel designed for the load. The floor and wall above are supported throughout, and the bathroom stays usable in most cases. Waste pipes or soil stacks on the wall being removed are rerouted first so nothing is disturbed when it comes down.

Can the steel beam be left exposed in a side return?

Yes, and many people like the look of exposed steel under a glazed roof. It usually still needs fire protection, so it is coated with an intumescent paint system to the specified thickness, then finished in your chosen colour. The engineer and building control confirm what protection is required.

Does a glazed roof affect the steel beam?

Yes. Glazed roofs need the beam they sit on to stay very straight under load, so the engineer may set a stricter deflection limit than for a solid roof. That can mean a deeper or heavier steel section, and the roof supplier's details need sharing early.

How soon can side return extension steels start in Portsmouth?

Start dates depend on the engineer's calculations, the building control approval and, where needed, party wall notice periods. We give you a realistic timetable after the survey and keep you updated as each approval comes through.

Planning to take a wall out?

Book a free survey visit. You get an itemised written quote covering calculations, building control, steel and making good.