Steel BeamInstallers
Two retail units opened into one with a steel beam and columns

Shop & commercial openings · Greenford

Shop & commercial openings in Greenford

Shop & commercial openings for homes in UB1, UB2, UB4, designed by a structural engineer.

  • Itemised written quote
  • Beam sized by a structural engineer
  • Covering Greenford and nearby

Free survey in Greenford

Tell us about the shop & commercial opening job in Greenford.

Please enter your name.
Please enter a UK phone number.
Please enter a valid email.
Please enter a UK postcode.
Please tell us a little about the job.
  • Free survey visit
  • Engineer's calculations arranged
  • Building control handled
  • Fixed written price once scope is agreed
  • England, Wales, mainland Scotland & NI

What shop & commercial openings involve in Greenford

If you live in Greenford, shop & commercial openings can usually be planned and priced after a single survey visit. We also cover the surrounding towns and villages in London. We cover UB1, UB2, UB4, UB5 and UB6, and we fix the price in writing once the layout and scope are agreed.

We carry out structural openings for small commercial premises across the UK, working to an engineer's design and handling building control. Work can be planned around opening hours, including out-of-hours shifts where the landlord and building allow, and coordinated with your shopfitter.

Key points for your project

  • Many shopfronts sit under an old steel or timber beam hidden behind the fascia for decades. It may be corroded, undersized for what is above or bearing on decayed masonry, so it is opened up and checked before keeping it is even considered.
  • Purely internal works may not need planning permission, but a new or altered shopfront changes the look of the building and may need it, particularly in a conservation area. Listed commercial buildings also need listed building consent for structural changes.
  • Plenty of businesses keep trading while the work goes on. Dust screens, hoarding and phased working can keep part of the premises open, and the noisiest cutting can be programmed outside opening hours where the building and neighbours allow.
  • Where there is a flat above the shop, its occupants need to know about the works and their safety has to be protected. Their access, fire escape route and the structure holding up their floor must all be maintained throughout the job.
  • Most commercial leases prohibit structural alterations without the landlord's written consent, often given as a licence for alterations. Securing it before work starts avoids disputes later, and we supply the drawings and calculations the landlord or their surveyor asks to see.

What happens, step by step

  1. Free visit

    A short visit to Greenford to see the job, agree what you want and check the bearings, floors and services that affect the design.

  2. Calculations

    The engineer's calculations and a simple drawing are prepared for your opening and shared with you before anything is ordered.

  3. Building control

    We submit a building notice or full plans application to the local council's building control team, so approval is in place before the wall is touched.

  4. Steel in, made good

    On site we prop, open up, fit and pack the steel, then fire protect, box in and plaster once the inspection is done.

Guide prices for shop & commercial openings in Greenford

As a guide, budget £6,400–£19,200 including VAT for shop or commercial structural opening in Greenford, based on published UK cost guides adjusted for London prices (+28%).

JobTypical guide rangeWhat it usually covers
Shop or commercial structural opening£6,400–£19,200Transfer beam and columns for opening units together or forming a shopfront opening
Steel goalpost frame£2,550–£7,700Two posts and a beam bolted as a frame, pad foundations, base plates and fitting
Steel beam replacement£2,550–£7,050Propping, removing the failed beam, new steel on proper bearings, approval and making good
Fire protection to a steel beam£190–£770 per beamFire-rated board boxing or an intumescent coating system as specified

Figures include our approximate regional adjustment for London prices (+28%) and are rounded. How these figures are worked out.

Building rules for Greenford

For Greenford, building control is provided by the local council's building control team, or by a registered building control approver if preferred. We send them the engineer's calculations with a building notice or full plans application and book the inspections. Work done without approval can cause problems at sale and is far dearer to put right later.

Terraced and semi-detached homes often need party wall notices, because cutting into a shared wall to take a beam end is notifiable under the Party Wall etc. Act 1996. Allow at least two months for the notice period unless your neighbour agrees sooner.

Building rules in England

Shop & commercial openings near Greenford

Questions about shop & commercial openings in Greenford

Can I stay at home while the work is done in Greenford?

Usually, yes. The work area is screened and floors are protected. The rooms either side of the opening are out of action for a few days, and there is some noise and dust while the masonry comes out.

How soon can shop & commercial openings start in Greenford?

Start dates depend on the engineer's calculations, the building control approval and, where needed, party wall notice periods. We give you a realistic timetable after the survey and keep you updated as each approval comes through.

Can I knock two shops into one?

Usually, yes, with the right approvals. The dividing wall is replaced with steel designed by a structural engineer, building control approves the work and the fire strategy is updated for the combined unit. You also need landlord consent if you lease either unit, and party wall notices in England and Wales if the steel bears into a wall shared with another owner.

What kind of steel is used for a wide shop front?

The engineer chooses the section to suit the span and load. Wide frontages often use universal beams, sometimes paired or plated, and a goalpost frame of two columns and a beam where the existing piers cannot take the load. The steel is then fire protected and finished behind the fascia or boxing.

Do I need planning permission for a new shop front?

Often, yes. A new or altered shopfront usually changes how the building looks from the street, which can need planning permission, especially in a conservation area. Purely internal openings generally do not, but listed buildings need listed building consent for structural changes inside or out. It is worth checking with the local planning authority early.

Do I need a party wall agreement for shop & commercial openings in Greenford?

Yes, if the beam bears into a shared wall: the Party Wall etc. Act 1996 applies in England and Wales, and a party structure notice must be served at least two months before that work starts. We arrange it through a party wall surveyor.

Planning to take a wall out?

Book a free survey visit. You get an itemised written quote covering calculations, building control, steel and making good.