Steel BeamInstallers
Two retail units opened into one with a steel beam and columns

Shop & commercial openings · Leigh

Shop & commercial openings in Leigh

Steelwork, approvals and making good for shop & commercial openings in Leigh and nearby.

  • Survey, design and installation in one
  • Covering M29, M46, WN7
  • Inspected before it is covered

Free survey in Leigh

Tell us about the shop & commercial opening job in Leigh.

Please enter your name.
Please enter a UK phone number.
Please enter a valid email.
Please enter a UK postcode.
Please tell us a little about the job.
  • Free survey visit
  • Engineer's calculations arranged
  • Building control handled
  • Fixed written price once scope is agreed
  • England, Wales, mainland Scotland & NI

Shop & commercial openings in Leigh: how it works

Planning shop & commercial openings in Leigh? Our team covers M29, M46 and WN7 and the streets around them. Leigh is around 5.8 miles from Wigan, and we cover both. You get one written quote for the calculations, approvals, propping, steel and making good.

Commercial buildings often have a flat or offices above the shop, a heavy brick front and old steel or timber over the existing shopfront. Opening them up means supporting a lot of load at street level, usually with the public walking past, while keeping disruption to trading as low as possible.

Worth knowing before you start

  • Structural alterations to commercial premises need building regulations approval just as homes do, and in Scotland a building warrant before work starts. In England they usually go through a full plans application, because fire safety is assessed alongside the structure.
  • Purely internal works may not need planning permission, but a new or altered shopfront changes the look of the building and may need it, particularly in a conservation area. Listed commercial buildings also need listed building consent for structural changes.
  • Most commercial leases prohibit structural alterations without the landlord's written consent, often given as a licence for alterations. Securing it before work starts avoids disputes later, and we supply the drawings and calculations the landlord or their surveyor asks to see.
  • The main cost factors are the span and load above, whether columns or a goalpost frame are needed, the temporary works at the street, out-of-hours working, lifting equipment, and the fire protection and finish the opening requires.
  • Plenty of businesses keep trading while the work goes on. Dust screens, hoarding and phased working can keep part of the premises open, and the noisiest cutting can be programmed outside opening hours where the building and neighbours allow.

What happens, step by step

  1. Free visit

    A short visit to Leigh to see the job, agree what you want and check the bearings, floors and services that affect the design.

  2. Calculations

    The engineer's calculations and a simple drawing are prepared for your opening and shared with you before anything is ordered.

  3. Building control

    We submit a building notice or full plans application to Wigan Council, so approval is in place before the wall is touched.

  4. Steel in, made good

    On site we prop, open up, fit and pack the steel, then fire protect, box in and plaster once the inspection is done.

How much should I budget in Leigh?

As a guide, budget £4,800–£14,400 including VAT for shop or commercial structural opening in Leigh, based on published UK cost guides adjusted for prices in the North West (-4%).

JobTypical guide rangeWhat it usually covers
Shop or commercial structural opening£4,800–£14,400Transfer beam and columns for opening units together or forming a shopfront opening
Building control fees£240–£620Building notice or full plans fee and inspections; varies by council or approver
Steel goalpost frame£1,900–£5,750Two posts and a beam bolted as a frame, pad foundations, base plates and fitting
Party wall surveyor (agreed surveyor, per neighbour)£860–£1,920 per neighbourSchedule of condition and award where a neighbour dissents; serving notice alone, where the neighbour consents, costs far less (England and Wales only)

Figures include our approximate regional adjustment for prices in the North West (-4%) and are rounded. How these figures are worked out.

Building rules for Leigh

Structural openings in English homes need building regulations approval before work starts. Wigan Council can deal with it, or you can use a registered building control approver. Either way the steel is inspected before it is covered, and a completion certificate is issued at the end. Keep it safe for when you sell.

Terraced and semi-detached homes often need party wall notices, because cutting into a shared wall to take a beam end is notifiable under the Party Wall etc. Act 1996. Allow at least two months for the notice period unless your neighbour agrees sooner.

Building rules in England

Shop & commercial openings near Leigh

Shop & commercial openings in Leigh: your questions

Do I need a party wall agreement for shop & commercial openings in Leigh?

Yes, if the beam bears into a shared wall: the Party Wall etc. Act 1996 applies in England and Wales, and a party structure notice must be served at least two months before that work starts. We arrange it through a party wall surveyor.

Do you cover Leigh for shop & commercial openings?

Yes. We carry out shop & commercial openings in Leigh and the M29, M46 and WN7 postcode districts. Book a free survey visit and we will check the wall, arrange the engineer's calculations and send an itemised written quote.

Do I need planning permission for a new shop front?

Often, yes. A new or altered shopfront usually changes how the building looks from the street, which can need planning permission, especially in a conservation area. Purely internal openings generally do not, but listed buildings need listed building consent for structural changes inside or out. It is worth checking with the local planning authority early.

Do I need an asbestos survey before work on my shop?

Usually, if the building dates from before 2000. The duty holder for commercial premises should already have an asbestos register, and before walls, ceilings or the shopfront are opened up, a refurbishment survey of the work area is needed wherever that register does not cover it, so any asbestos is dealt with first.

Will I have to close my shop while the work is done?

Not always. Depending on the layout, the work area can be screened off with hoarding so part of the premises keeps trading, and the noisiest stages can be done out of hours. Some jobs, such as replacing the beam across the whole frontage, may need a short closure, which is planned well in advance.

Can I stay at home while the work is done in Leigh?

Usually, yes. The work area is screened and floors are protected. The rooms either side of the opening are out of action for a few days, and there is some noise and dust while the masonry comes out.

Planning to take a wall out?

Book a free survey visit. You get an itemised written quote covering calculations, building control, steel and making good.