Steelwork, approvals and making good for RSJ installation in Shirley and nearby.

  • Free survey visit in Shirley
  • Engineer's calculations arranged
  • Building control handled for you

Free survey in Shirley

Tell us about the RSJ installation job in Shirley.

Please enter your name.
Please enter a UK phone number.
Please enter a valid email.
Please enter a UK postcode.
Please tell us a little about the job.
  • Free survey visit
  • Engineer's calculations arranged
  • Building control handled
  • Fixed written price once scope is agreed
  • England, Wales, mainland Scotland & NI

RSJ installation in Shirley: how it works

Shirley has a mix of housing, and RSJ installation needs a slightly different approach in each. We also work in nearby Solihull, roughly 1.6 miles away. Whatever the age of the property, the steel goes in on proper bearings with temporary support in place throughout.

We supply and fit the steel from start to finish. That includes arranging the calculations, having the beam fabricated with the right end plates, holes and primer, getting it into the property, setting it on its bearings, and packing it so it takes the load. Building control, propping and making good sit in the same itemised quote.

What to expect

  • Floor joists can rest on the bottom flange, hang from timber packers bolted into the web, or be notched to sit over the steel. The engineer specifies the connection, and it affects how flush the finished ceiling can be.
  • Padstones spread the concentrated load from each beam end into the masonry below. They may be concrete, engineering brick or a steel plate, depending on the engineer's design and the strength of the wall beneath.
  • If you already hold calculations from an architect or engineer, we install to those. Where something on site differs from the drawing, such as a weaker wall or a different joist direction, the engineer is asked to confirm before work carries on.
  • Packing is what makes the beam work. Steel shims and dry-pack mortar fill the gap between the top flange and the structure above, so the load transfers onto the steel without the floor or wall settling down onto it.
  • Where a long beam cannot be carried into a property in one piece, the engineer can design a bolted splice so it arrives in two or more lengths. The splice position and bolts are part of the calculations and must be installed exactly as drawn.

Four stages, one team

  1. Free visit

    A short visit to Shirley to see the job, agree what you want and check the bearings, floors and services that affect the design.

  2. Calculations

    The engineer's calculations and a simple drawing are prepared for your opening and shared with you before anything is ordered.

  3. Building control

    We submit a building notice or full plans application to Solihull Council, so approval is in place before the wall is touched.

  4. Steel in, made good

    On site we prop, open up, fit and pack the steel, then fire protect, box in and plaster once the inspection is done.

What does RSJ installation cost in Shirley?

As a guide, budget £800–£2,500 per beam including VAT for rSJ supply and fit (single beam) in Shirley, based on published UK cost guides adjusted for prices in the West Midlands (no adjustment).

JobTypical guide rangeWhat it usually covers
RSJ supply and fit (single beam)£800–£2,500 per beamBeam supplied, delivered, lifted and packed on padstones, with propping (calculations and approval priced separately)
Steel goalpost frame£2,000–£6,000Two posts and a beam bolted as a frame, pad foundations, base plates and fitting
Steel beam replacement£2,000–£5,500Propping, removing the failed beam, new steel on proper bearings, approval and making good
Temporary works and propping£150–£500Props, spreaders, needles and sole plates for a typical opening, installed and struck

Figures include our approximate regional adjustment for prices in the West Midlands (no adjustment) and are rounded. How these figures are worked out.

Approvals in Shirley

For Shirley, building control is provided by Solihull Council, or by a registered building control approver if preferred. We send them the engineer's calculations with a building notice or full plans application and book the inspections. Work done without approval can cause problems at sale and is far dearer to put right later.

If the beam bears into a wall you share with a neighbour, the Party Wall etc. Act 1996 applies, and a party structure notice must be served at least two months before that work starts. We arrange this through a party wall surveyor.

Building rules in England

RSJ installation near Shirley

Local questions answered

Can you work on older or listed homes in Shirley?

Yes. Older homes often have lime mortar, timber lintels or shallow footings, which the engineer allows for. Listed buildings need listed building consent for internal structural changes as well as building regulations approval, and that must be in place first.

How soon can RSJ installation start in Shirley?

Start dates depend on the engineer's calculations, the building control approval and, where needed, party wall notice periods. We give you a realistic timetable after the survey and keep you updated as each approval comes through.

What is included in an RSJ supply and fit price?

Our itemised written quote sets out the calculations, building control, steel and fabrication, delivery, lifting, padstones, propping, labour, fire protection and making good as separate lines. Once the specification and scope are agreed, the price is fixed in writing, so you know the full cost before work starts.

Does an RSJ need to be painted or boxed in?

Usually it needs fire protection, most often by boxing in with fire-rated plasterboard and skimming. If you want the steel on show, an intumescent paint system can be applied to the specified thickness and then top-coated in your chosen colour. The fabrication primer is not fire protection on its own.

Who decides what size RSJ I need?

A structural engineer. The size depends on the span, the loads from floors, walls and roof above, how stiff the beam needs to be and how its ends are supported. We arrange calculations from a qualified engineer, or fit to calculations you already have, rather than guessing a size.

Planning to take a wall out?