
RSJ installation · Deal
RSJ installation in Deal
RSJ installation for homes in CT14, designed by a structural engineer.
- Survey, design and installation in one
- Covering CT14
- Inspected before it is covered
- Free survey visit
- Engineer's calculations arranged
- Building control handled
- Fixed written price once scope is agreed
- England, Wales, mainland Scotland & NI
About our RSJ installation service in Deal
We cover RSJ installation in Deal (CT14) and the streets around it. It sits about 9.9 miles from St Peters, which we also cover. Each job is designed by a structural engineer and approved through local building control before work begins.
People still call almost any steel beam in a house an RSJ, even though the sections fitted today are usually universal beams with parallel flanges. Whatever the name, the job is the same: a length of structural steel, made to an engineer's specification, carrying floors, walls or roof over a space where support used to be.
Key points for your project
- Delivery can make or break an RSJ job. A long beam has to turn through a front door, along a hallway and past the stairs, so routes are measured at the survey and alternatives such as a window opening are planned early.
- An RSJ inside a home commonly needs 30-minute fire resistance where it supports elements of structure. Fire-rated plasterboard boxing is the usual method, with intumescent paint used when the beam is to remain visible.
- The engineer chooses the section type for the job. Universal beams suit most spans, universal columns are stockier and used as posts or where depth is limited, parallel flange channels fit against walls or timbers, and box sections suit slim or exposed members.
- Where a long beam cannot be carried into a property in one piece, the engineer can design a bolted splice so it arrives in two or more lengths. The splice position and bolts are part of the calculations and must be installed exactly as drawn.
- If you already hold calculations from an architect or engineer, we install to those. Where something on site differs from the drawing, such as a weaker wall or a different joist direction, the engineer is asked to confirm before work carries on.
From survey to sign-off in Deal
Free visit
A short visit to Deal to see the job, agree what you want and check the bearings, floors and services that affect the design.
Calculations
The engineer's calculations and a simple drawing are prepared for your opening and shared with you before anything is ordered.
Building control
We submit a building notice or full plans application to the local council's building control team, so approval is in place before the wall is touched.
Steel in, made good
On site we prop, open up, fit and pack the steel, then fire protect, box in and plaster once the inspection is done.
How much should I budget in Deal?
As a guide, budget £900–£2,800 per beam including VAT for rSJ supply and fit (single beam) in Deal, based on published UK cost guides adjusted for prices in the South East (+12%).
| Job | Typical guide range | What it usually covers |
|---|---|---|
| RSJ supply and fit (single beam) | £900–£2,800 per beam | Beam supplied, delivered, lifted and packed on padstones, with propping (calculations and approval priced separately) |
| Steel beam replacement | £2,250–£6,150 | Propping, removing the failed beam, new steel on proper bearings, approval and making good |
| Fire protection to a steel beam | £170–£670 per beam | Fire-rated board boxing or an intumescent coating system as specified |
| Steel goalpost frame | £2,250–£6,700 | Two posts and a beam bolted as a frame, pad foundations, base plates and fitting |
Figures include our approximate regional adjustment for prices in the South East (+12%) and are rounded. How these figures are worked out.
Building control and neighbours in Deal
In England, taking out a load-bearing wall or putting in a beam is building work under the Building Regulations 2010. It needs approval from building control, either the local council's building control team or a registered building control approver, through a full plans application or a building notice. Part A covers the structure and Part B covers fire safety, which is why steel in homes is usually fire protected.
If the beam bears into a wall you share with a neighbour, the Party Wall etc. Act 1996 applies, and a party structure notice must be served at least two months before that work starts. We arrange this through a party wall surveyor.
RSJ installation near Deal
- Dover 7.8 mi
- Ramsgate 7.8 mi
- Broadstairs 9.5 mi
- St Peters 9.9 mi
- Margate 11.0 mi
- Folkestone 14.1 mi
RSJ installation in Deal: your questions
How much does RSJ installation cost in Deal?
As a guide, budget £900–£2,800 per beam including VAT for rSJ supply and fit (single beam) in Deal, based on published UK cost guides adjusted for prices in the South East (+12%). The exact figure depends on the span, what the wall carries, access and the finish, and is fixed in writing once the scope is agreed.
Do you also work near Deal?
Yes. We also cover nearby towns including Dover, Ramsgate, Broadstairs and St Peters.
Can an RSJ be delivered in sections?
Yes, where access is tight. The engineer can design bolted splice joints so a long beam arrives in two or more pieces and is joined in place. The splice has to be part of the calculations from the start, because it changes how the beam carries load at that point.
Can you fit an RSJ to my own engineer's calculations?
Yes. We install to calculations and drawings from your engineer or architect, as long as they cover the beam, bearings and any columns or connections. If site conditions differ from what the design assumed, we check with the engineer before carrying on.
What does RSJ stand for?
RSJ stands for rolled steel joist. It was the name for a hot-rolled I-shaped steel section with tapered flanges, and it is still used loosely for any steel beam in a house. Most steels fitted in homes today are universal beams, which do the same job with parallel flanges.
Can you work on older or listed homes in Deal?
Yes. Older homes often have lime mortar, timber lintels or shallow footings, which the engineer allows for. Listed buildings need listed building consent for internal structural changes as well as building regulations approval, and that must be in place first.