RSJ installation · Fleet
RSJ installation in Fleet
RSJ installation in Fleet, from free survey to completion certificate.
- Price fixed in writing once scope is agreed
- Building control arranged
- Temporary works and making good included
- Free survey visit
- Engineer's calculations arranged
- Building control handled
- Fixed written price once scope is agreed
- England, Wales, mainland Scotland & NI
What RSJ installation involves in Fleet
Fleet has a mix of housing, and RSJ installation needs a slightly different approach in each. We also work in nearby Basingstoke, roughly 11.1 miles away. Whatever the age of the property, the steel goes in on proper bearings with temporary support in place throughout.
People still call almost any steel beam in a house an RSJ, even though the sections fitted today are usually universal beams with parallel flanges. Whatever the name, the job is the same: a length of structural steel, made to an engineer's specification, carrying floors, walls or roof over a space where support used to be.
What to expect
- RSJ originally meant a rolled steel joist with tapered flanges. Most beams supplied for homes today are universal beams with parallel flanges, but the term RSJ has stuck, and builders, engineers and building control all understand what it means.
- If you already hold calculations from an architect or engineer, we install to those. Where something on site differs from the drawing, such as a weaker wall or a different joist direction, the engineer is asked to confirm before work carries on.
- Where a long beam cannot be carried into a property in one piece, the engineer can design a bolted splice so it arrives in two or more lengths. The splice position and bolts are part of the calculations and must be installed exactly as drawn.
- Structural steel comes in recognised grades, and the engineer's drawing states which grade the calculations assume. The steel supplied matches that specification, and the delivery paperwork is kept so building control can see what has been fitted.
- Delivery can make or break an RSJ job. A long beam has to turn through a front door, along a hallway and past the stairs, so routes are measured at the survey and alternatives such as a window opening are planned early.
How the job runs in Fleet
Free visit
A short visit to Fleet to see the job, agree what you want and check the bearings, floors and services that affect the design.
Calculations
The engineer's calculations and a simple drawing are prepared for your opening and shared with you before anything is ordered.
Building control
We submit a building notice or full plans application to the local council's building control team, so approval is in place before the wall is touched.
Steel in, made good
On site we prop, open up, fit and pack the steel, then fire protect, box in and plaster once the inspection is done.
How much should I budget in Fleet?
As a guide, budget £900–£2,800 per beam including VAT for rSJ supply and fit (single beam) in Fleet, based on published UK cost guides adjusted for prices in the South East (+12%).
| Job | Typical guide range | What it usually covers |
|---|---|---|
| RSJ supply and fit (single beam) | £900–£2,800 per beam | Beam supplied, delivered, lifted and packed on padstones, with propping (calculations and approval priced separately) |
| Steel beam replacement | £2,250–£6,150 | Propping, removing the failed beam, new steel on proper bearings, approval and making good |
| Steel goalpost frame | £2,250–£6,700 | Two posts and a beam bolted as a frame, pad foundations, base plates and fitting |
| Temporary works and propping | £170–£560 | Props, spreaders, needles and sole plates for a typical opening, installed and struck |
Figures include our approximate regional adjustment for prices in the South East (+12%) and are rounded. How these figures are worked out.
Building control and neighbours in Fleet
For Fleet, building control is provided by the local council's building control team, or by a registered building control approver if preferred. We send them the engineer's calculations with a building notice or full plans application and book the inspections. Work done without approval can cause problems at sale and is far dearer to put right later.
If the beam bears into a wall you share with a neighbour, the Party Wall etc. Act 1996 applies, and a party structure notice must be served at least two months before that work starts. We arrange this through a party wall surveyor.
RSJ installation in Fleet: your questions
How soon can RSJ installation start in Fleet?
Start dates depend on the engineer's calculations, the building control approval and, where needed, party wall notice periods. We give you a realistic timetable after the survey and keep you updated as each approval comes through.
Do I need a party wall agreement for RSJ installation in Fleet?
Yes, if the beam bears into a shared wall: the Party Wall etc. Act 1996 applies in England and Wales, and a party structure notice must be served at least two months before that work starts. We arrange it through a party wall surveyor.
Can an RSJ be delivered in sections?
Yes, where access is tight. The engineer can design bolted splice joints so a long beam arrives in two or more pieces and is joined in place. The splice has to be part of the calculations from the start, because it changes how the beam carries load at that point.
What is included in an RSJ supply and fit price?
Our itemised written quote sets out the calculations, building control, steel and fabrication, delivery, lifting, padstones, propping, labour, fire protection and making good as separate lines. Once the specification and scope are agreed, the price is fixed in writing, so you know the full cost before work starts.
What does RSJ stand for?
RSJ stands for rolled steel joist. It was the name for a hot-rolled I-shaped steel section with tapered flanges, and it is still used loosely for any steel beam in a house. Most steels fitted in homes today are universal beams, which do the same job with parallel flanges.
Can I stay at home while the work is done in Fleet?
Usually, yes. The work area is screened and floors are protected. The rooms either side of the opening are out of action for a few days, and there is some noise and dust while the masonry comes out.