Steel BeamInstallers
Two installers seen from behind lifting a steel beam onto a padstone

RSJ installation · Oban

RSJ installation in Oban

RSJ installation in Oban, from free survey to completion certificate.

  • Survey, design and installation in one
  • Covering PA34
  • Inspected before it is covered

Free survey in Oban

Tell us about the RSJ installation job in Oban.

Please enter your name.
Please enter a UK phone number.
Please enter a valid email.
Please enter a UK postcode.
Please tell us a little about the job.
  • Free survey visit
  • Engineer's calculations arranged
  • Building control handled
  • Fixed written price once scope is agreed
  • England, Wales, mainland Scotland & NI

What RSJ installation involves in Oban

Oban has a mix of housing, and RSJ installation needs a slightly different approach in each. Our coverage runs across Argyll and Bute, so nearby villages are included too. Whatever the age of the property, the steel goes in on proper bearings with temporary support in place throughout.

People still call almost any steel beam in a house an RSJ, even though the sections fitted today are usually universal beams with parallel flanges. Whatever the name, the job is the same: a length of structural steel, made to an engineer's specification, carrying floors, walls or roof over a space where support used to be.

Key points for your project

  • Sometimes two beams are bolted side by side with spacers, either to carry a thick wall or to fit through a tight space. Bolt spacing and spacer type come from the engineer's design rather than being decided on site.
  • Steel for internal use is normally delivered with a primer coat to protect it during installation. Beams in damp positions, within external walls or exposed outside need a more robust coating or galvanising, as the engineer specifies.
  • Packing is what makes the beam work. Steel shims and dry-pack mortar fill the gap between the top flange and the structure above, so the load transfers onto the steel without the floor or wall settling down onto it.
  • Structural steel comes in recognised grades, and the engineer's drawing states which grade the calculations assume. The steel supplied matches that specification, and the delivery paperwork is kept so building standards can see what has been fitted.
  • Where a long beam cannot be carried into a property in one piece, the engineer can design a bolted splice so it arrives in two or more lengths. The splice position and bolts are part of the calculations and must be installed exactly as drawn.

From survey to sign-off in Oban

  1. Free visit

    A short visit to Oban to see the job, agree what you want and check the bearings, floors and services that affect the design.

  2. Calculations

    The engineer's calculations and a simple drawing are prepared for your opening and shared with you before anything is ordered.

  3. Building warrant

    A building warrant is applied for from Argyll and Bute Council, and work starts only once the warrant has been granted.

  4. Steel in, made good

    On site we prop, open up, fit and pack the steel, then fire protect, box in and plaster once the inspection is done.

How much should I budget in Oban?

As a guide, budget £730–£2,280 per beam including VAT for rSJ supply and fit (single beam) in Oban, based on published UK cost guides adjusted for prices in Scotland (-9%).

JobTypical guide rangeWhat it usually covers
RSJ supply and fit (single beam)£730–£2,280 per beamBeam supplied, delivered, lifted and packed on padstones, with propping (calculations and approval priced separately)
Temporary works and propping£140–£460Props, spreaders, needles and sole plates for a typical opening, installed and struck
Steel beam replacement£1,800–£5,000Propping, removing the failed beam, new steel on proper bearings, approval and making good
Steel goalpost frame£1,800–£5,450Two posts and a beam bolted as a frame, pad foundations, base plates and fitting

Figures include our approximate regional adjustment for prices in Scotland (-9%) and are rounded. How these figures are worked out.

Approvals in Oban

Scottish rules are stricter on timing than in England: the building warrant must be in place before the wall is touched. We prepare the application with the engineer's calculations and submit it to Argyll and Bute Council. The finished work is then certified and a completion certificate submitted for acceptance.

There is no party wall notice system in Scotland. Instead, check your title deeds and, for flats, the tenement management scheme, and talk to neighbours early if the beam bears into a shared wall.

Building rules in Scotland

RSJ installation near Oban

RSJ installation in Oban: your questions

Can I stay at home while the work is done in Oban?

Usually, yes. The work area is screened and floors are protected. The rooms either side of the opening are out of action for a few days, and there is some noise and dust while the masonry comes out.

How soon can RSJ installation start in Oban?

Start dates depend on the engineer's calculations, the building warrant and any agreement needed with neighbours. We give you a realistic timetable after the survey and keep you updated as each approval comes through.

Does an RSJ need to be painted or boxed in?

Usually it needs fire protection, most often by boxing in with fire-rated plasterboard and skimming. If you want the steel on show, an intumescent paint system can be applied to the specified thickness and then top-coated in your chosen colour. The fabrication primer is not fire protection on its own.

Who decides what size RSJ I need?

A structural engineer. The size depends on the span, the loads from floors, walls and roof above, how stiff the beam needs to be and how its ends are supported. We arrange calculations from a qualified engineer, or fit to calculations you already have, rather than guessing a size.

What does RSJ stand for?

RSJ stands for rolled steel joist. It was the name for a hot-rolled I-shaped steel section with tapered flanges, and it is still used loosely for any steel beam in a house. Most steels fitted in homes today are universal beams, which do the same job with parallel flanges.

Do I need a party wall agreement for RSJ installation in Oban?

There is no Party Wall Act in Scotland. Your title deeds and the general law apply instead, and the Tenements (Scotland) Act 2004 for flats, so agree the work with your neighbour in writing before it starts.

Planning to take a wall out?

Book a free survey visit. You get an itemised written quote covering calculations, building control, steel and making good.