Rear extension steels · Frome
Rear extension steels in Frome
Steelwork, approvals and making good for rear extension steels in Frome and nearby.
- Price fixed in writing once scope is agreed
- Building control arranged
- Temporary works and making good included
- Free survey visit
- Engineer's calculations arranged
- Building control handled
- Fixed written price once scope is agreed
- England, Wales, mainland Scotland & NI
Planning rear extension steels in Frome
Our rear extension steels service in Frome covers everything from the first visit to the completion paperwork. Frome is around 10.3 miles from Bath, and we cover both. Postcode districts we cover here include BA11.
Building a rear extension is only half of the open-plan result. The original back wall still holds up the first floor and the rear wall of the bedrooms above, so opening it needs steel. Depending on the width and what is left to bear on, that could be a single beam on padstones, a beam on columns, or a full goalpost frame.
Key points for your project
- Soil stacks, waste pipes, boiler flues and gas meters are often fixed to the back wall. These are moved before the wall opens, and any work on gas pipework must by law be carried out by a Gas Safe registered engineer.
- The original rear wall of most houses is load-bearing because it supports first-floor joists and the bedroom wall above. Even where the joists run parallel to it, the masonry overhead still needs carrying, so steel is almost always part of opening it up.
- Where the extension ceiling and the house ceiling should run through at one level, the steel may need setting higher into the floor zone or tying in with the extension roof structure. That choice changes the steel design, so it is settled before calculations.
- Columns carry concentrated loads, so each normally sits on a pad foundation designed by the engineer. Digging these inside an existing kitchen or through a solid concrete floor takes planning, especially where drains run close to the back wall.
- The building control completion certificate for the extension covers the steelwork to the old rear wall. Keep it with the engineer's calculations and drawings, as a buyer's solicitor will expect to see the structural paperwork for the extension.
Four stages, one team
Look and measure
We check the wall, the span you want and what the wall is carrying, and photograph anything the engineer needs to see.
Design and price
Calculations come back from the engineer and we confirm your fixed written price, line by line.
Building control
We submit a building notice or full plans application to the local council's building control team, so approval is in place before the wall is touched.
Fit, inspect, finish
The work is propped and the steel installed and packed tight. After inspection the opening is boxed, plastered and left clean.
How much should I budget in Frome?
As a guide, budget £2,600–£7,200 including VAT for opening into a rear extension in Frome, based on published UK cost guides adjusted for prices in the South West (+3%).
| Job | Typical guide range | What it usually covers |
|---|---|---|
| Opening into a rear extension | £2,600–£7,200 | Original rear wall removed with a beam or goalpost, approvals and propping, coordinated with the extension build |
| Steel column or post | £520–£1,540 per column | Column supplied and fitted with base and cap plates on a pad foundation |
| Rear wall opening for bi-fold or sliding doors | £2,600–£7,200 | External wall opened up to about 5 m with steel, propping, cavity tray and making good (doors supplied separately) |
| Structural calculations for a beam | £260–£770 | Site measure or photos, beam and padstone design and calculations for building control |
Figures include our approximate regional adjustment for prices in the South West (+3%) and are rounded. How these figures are worked out.
Approvals in Frome
In England, taking out a load-bearing wall or putting in a beam is building work under the Building Regulations 2010. It needs approval from building control, either the local council's building control team or a registered building control approver, through a full plans application or a building notice. Part A covers the structure and Part B covers fire safety, which is why steel in homes is usually fire protected.
Terraced and semi-detached homes often need party wall notices, because cutting into a shared wall to take a beam end is notifiable under the Party Wall etc. Act 1996. Allow at least two months for the notice period unless your neighbour agrees sooner.
Rear extension steels near Frome
- Trowbridge 8.0 mi
- Bath 10.3 mi
- Kingswood 17.5 mi
- Chippenham 18.1 mi
- Mangotsfield 19.6 mi
- Yate 22.0 mi
Local questions answered
Do I need a party wall agreement for rear extension steels in Frome?
Yes, if the beam bears into a shared wall: the Party Wall etc. Act 1996 applies in England and Wales, and a party structure notice must be served at least two months before that work starts. We arrange it through a party wall surveyor.
Do you cover Frome for rear extension steels?
Yes. We carry out rear extension steels in Frome and the BA11 postcode districts. Book a free survey visit and we will check the wall, arrange the engineer's calculations and send an itemised written quote.
What is a goalpost frame in an extension?
A goalpost frame is two steel columns with a beam across the top, bolted together and standing on their own foundations. It is used where the opening is so wide that little masonry is left to bear on, or where the existing corners cannot take the load. The engineer decides whether one is needed.
How wide can a rear extension opening be?
There is no fixed limit, and openings across the full width of a house are common with the right steel. The engineer sizes the beam or frame for the span and the loads above. Wider spans need deeper or heavier steel and possibly columns, which affects headroom and cost.
Do I need a steel beam for my rear extension?
If the original back wall is being opened up into the extension, almost certainly yes. That wall normally carries the first floor and the wall above, so a beam, columns or a goalpost frame takes over the job. A structural engineer confirms exactly what is needed once the opening width and loads are known.
Can you work on older or listed homes in Frome?
Yes. Older homes often have lime mortar, timber lintels or shallow footings, which the engineer allows for. Listed buildings need listed building consent for internal structural changes as well as building regulations approval, and that must be in place first.