
Rear extension steels · Midlothian
Rear extension steels in Midlothian
Survey, engineer's design and installation of rear extension steels anywhere in Midlothian.
- Survey, design and installation in one
- Covering EH18, EH19, EH20, EH22
- Inspected before it is covered
- Free survey visit
- Engineer's calculations arranged
- Building control handled
- Fixed written price once scope is agreed
- England, Wales, mainland Scotland & NI
Planning rear extension steels in Midlothian
Rear extension steels are the beams, columns and frames that let the original back wall of a house be opened up into a new extension. Sized by a structural engineer, they pick up the floor, wall and roof loads that the old wall carried and pass them into bearings or foundations, so the new and old spaces join as one open room.
If you are planning rear extension steels in Midlothian, the order of work matters as much as the steel: survey, calculations, approval, propping, installation, inspection and making good. That includes Bonnyrigg and Penicuik, plus smaller towns and villages nearby. We run that sequence for you as one job with one point of contact.
What to expect
- Two-storey rear extensions add a second level of loads to think about. Steels at first-floor level may carry the existing rear wall of the bedrooms or tie the new roof into the old one, so the engineer looks at both floors together.
- Opening the rear wall is usually the dustiest stage of an extension project. The work face is sheeted off from the rest of the house, and the kitchen is often out of use for a few days while the opening is formed and the steel goes in.
- During the opening, props stand both inside the house and within the extension footprint. Where props bear on a newly laid slab, the propping plan checks that the slab can take those point loads, using spreaders where needed.
- When bi-fold or sliding doors sit directly beneath the new steel, the beam has to stay stiff enough not to bind the door panels. The engineer sets a tighter deflection limit, which can mean a deeper or heavier section than strength alone would need.
- Columns carry concentrated loads, so each normally sits on a pad foundation designed by the engineer. Digging these inside an existing kitchen or through a solid concrete floor takes planning, especially where drains run close to the back wall.
Four stages, one team
Survey in Midlothian
We visit, look at the wall and what sits above it, measure the opening and note services, access and how the steel can be brought in.
Engineer's design
A structural engineer sizes the beam, padstones and any posts, and sets out the temporary support needed while the wall is out.
Building warrant
A building warrant is applied for from Midlothian Council, and work starts only once the warrant has been granted.
Install and sign-off
Props go in, the opening is formed, the steel is set and packed, building standards inspects it, and we make good.
How much should I budget in Midlothian?
As a guide, budget £2,300–£6,350 including VAT for opening into a rear extension in Midlothian, based on published UK cost guides adjusted for prices in Scotland (-9%).
| Job | Typical guide range | What it usually covers |
|---|---|---|
| Opening into a rear extension | £2,300–£6,350 | Original rear wall removed with a beam or goalpost, approvals and propping, coordinated with the extension build |
| Rear wall opening for bi-fold or sliding doors | £2,300–£6,350 | External wall opened up to about 5 m with steel, propping, cavity tray and making good (doors supplied separately) |
| Steel column or post | £460–£1,360 per column | Column supplied and fitted with base and cap plates on a pad foundation |
| Side return extension steelwork | £3,200–£7,750 | Beams and posts along the old side wall line, propping and approvals (extension build extra) |
Figures include our approximate regional adjustment for prices in Scotland (-9%) and are rounded. How these figures are worked out.
Building control and neighbours in Midlothian
Steel beam work in Midlothian needs a building warrant from Midlothian Council. The structural design is part of the application, and the council's building standards team accepts the completion certificate once the work is done as approved.
Scotland has no Party Wall Act. Work affecting a shared wall is governed by your title deeds and the general law, and in flats by the Tenements (Scotland) Act 2004, so it is sensible to agree the work with neighbours in writing before starting.
Questions about rear extension steels in Midlothian
Can I stay at home while the work is done in Midlothian?
Usually, yes. The work area is screened and floors are protected. The rooms either side of the opening are out of action for a few days, and there is some noise and dust while the masonry comes out.
Do I need a party wall agreement for rear extension steels in Midlothian?
There is no Party Wall Act in Scotland. Your title deeds and the general law apply instead, and the Tenements (Scotland) Act 2004 for flats, so agree the work with your neighbour in writing before it starts.
How wide can a rear extension opening be?
There is no fixed limit, and openings across the full width of a house are common with the right steel. The engineer sizes the beam or frame for the span and the loads above. Wider spans need deeper or heavier steel and possibly columns, which affects headroom and cost.
Will my kitchen be out of action while the rear wall is opened?
For a few days, usually. The kitchen often sits against the rear wall, so units, sinks or appliances near the opening may need disconnecting while the wall is propped and removed. The work area is sheeted off and the rest of the house stays in use.
When does the back wall come out during an extension build?
Usually once the extension walls and roof are up and the new space is weathertight. That keeps the house secure and dry while the opening is formed. The steel goes in, building standards inspects it, and the builder then carries the floors and ceilings through.
What is a goalpost frame in an extension?
A goalpost frame is two steel columns with a beam across the top, bolted together and standing on their own foundations. It is used where the opening is so wide that little masonry is left to bear on, or where the existing corners cannot take the load. The engineer decides whether one is needed.
What happens at the survey visit in Midlothian?
We look at the wall, the floor and ceiling either side and what sits above, measure the opening you want, and note cables, pipes and access for the steel. It usually takes under an hour and there is no charge.