Steel BeamInstallers
Rear extension under construction with a steel beam over the opening into the house

Rear extension steels · Larne

Rear extension steels in Larne

Steelwork, approvals and making good for rear extension steels in Larne and nearby.

  • Itemised written quote
  • Beam sized by a structural engineer
  • Covering Larne and nearby

Free survey in Larne

Tell us about the rear extension steel job in Larne.

Please enter your name.
Please enter a UK phone number.
Please enter a valid email.
Please enter a UK postcode.
Please tell us a little about the job.
  • Free survey visit
  • Engineer's calculations arranged
  • Building control handled
  • Fixed written price once scope is agreed
  • England, Wales, mainland Scotland & NI

Planning rear extension steels in Larne

If you live in Larne, rear extension steels can usually be planned and priced after a single survey visit. Our coverage runs across Mid and East Antrim, so nearby villages are included too. We cover BT40, and we fix the price in writing once the layout and scope are agreed.

Building a rear extension is only half of the open-plan result. The original back wall still holds up the first floor and the rear wall of the bedrooms above, so opening it needs steel. Depending on the width and what is left to bear on, that could be a single beam on padstones, a beam on columns, or a full goalpost frame.

What to expect

  • Where the extension ceiling and the house ceiling should run through at one level, the steel may need setting higher into the floor zone or tying in with the extension roof structure. That choice changes the steel design, so it is settled before calculations.
  • Opening the rear wall is usually the dustiest stage of an extension project. The work face is sheeted off from the rest of the house, and the kitchen is often out of use for a few days while the opening is formed and the steel goes in.
  • When bi-fold or sliding doors sit directly beneath the new steel, the beam has to stay stiff enough not to bind the door panels. The engineer sets a tighter deflection limit, which can mean a deeper or heavier section than strength alone would need.
  • The original rear wall of most houses is load-bearing because it supports first-floor joists and the bedroom wall above. Even where the joists run parallel to it, the masonry overhead still needs carrying, so steel is almost always part of opening it up.
  • The opening is usually formed once the extension walls and roof are up, so the house stays secure and dry. Leaving it too late can hold up plastering and floor screeding, so the steel date is agreed with the builder early on.

Four stages, one team

  1. Look and measure

    We check the wall, the span you want and what the wall is carrying, and photograph anything the engineer needs to see.

  2. Design and price

    Calculations come back from the engineer and we confirm your fixed written price, line by line.

  3. Building control

    A full plans application or building notice goes to Mid and East Antrim Borough Council under the Building Regulations (Northern Ireland) 2012 before work begins.

  4. Fit, inspect, finish

    The work is propped and the steel installed and packed tight. After inspection the opening is boxed, plastered and left clean.

How much should I budget in Larne?

As a guide, budget £2,150–£6,000 including VAT for opening into a rear extension in Larne, based on published UK cost guides adjusted for prices in Northern Ireland (-14%).

JobTypical guide rangeWhat it usually covers
Opening into a rear extension£2,150–£6,000Original rear wall removed with a beam or goalpost, approvals and propping, coordinated with the extension build
Rear wall opening for bi-fold or sliding doors£2,150–£6,000External wall opened up to about 5 m with steel, propping, cavity tray and making good (doors supplied separately)
Structural calculations for a beam£220–£640Site measure or photos, beam and padstone design and calculations for building control

Figures include our approximate regional adjustment for prices in Northern Ireland (-14%) and are rounded. How these figures are worked out.

Approvals in Larne

Building control in Larne is run by Mid and East Antrim Borough Council. Beams and new openings are controlled work under the Northern Ireland regulations, so we apply before anything is removed and the steel is inspected before it is covered.

The Party Wall etc. Act does not extend to Northern Ireland. Shared walls are dealt with under your title and the general law, so we recommend agreeing access and the work with your neighbour before it starts.

Building rules in Northern Ireland

Rear extension steels near Larne

Rear extension steels in Larne: your questions

Do I need a party wall agreement for rear extension steels in Larne?

There is no Party Wall Act in Northern Ireland. Your title deeds and the general law apply instead, so agree the work with your neighbour in writing before it starts.

How soon can rear extension steels start in Larne?

Start dates depend on the engineer's calculations, the building control approval and any agreement needed with neighbours. We give you a realistic timetable after the survey and keep you updated as each approval comes through.

Will my kitchen be out of action while the rear wall is opened?

For a few days, usually. The kitchen often sits against the rear wall, so units, sinks or appliances near the opening may need disconnecting while the wall is propped and removed. The work area is sheeted off and the rest of the house stays in use.

Do I need a steel beam for my rear extension?

If the original back wall is being opened up into the extension, almost certainly yes. That wall normally carries the first floor and the wall above, so a beam, columns or a goalpost frame takes over the job. A structural engineer confirms exactly what is needed once the opening width and loads are known.

Can I use my own builder for the extension and you for the steels?

Yes. We can supply and fit the steel package while another builder handles the extension shell and finishes. Dates are agreed with them so the rear wall is opened at the right stage, and the engineer's details are shared so levels, padstones and foundations line up.

Do you cover Larne for rear extension steels?

Yes. We carry out rear extension steels in Larne and the BT40 postcode districts. Book a free survey visit and we will check the wall, arrange the engineer's calculations and send an itemised written quote.

Planning to take a wall out?

Book a free survey visit. You get an itemised written quote covering calculations, building control, steel and making good.