Steel BeamInstallers
Rear extension under construction with a steel beam over the opening into the house

Rear extension steels · Antrim

Rear extension steels in Antrim

Steelwork, approvals and making good for rear extension steels in Antrim and nearby.

  • Price fixed in writing once scope is agreed
  • Building control arranged
  • Temporary works and making good included

Free survey in Antrim

Tell us about the rear extension steel job in Antrim.

Please enter your name.
Please enter a UK phone number.
Please enter a valid email.
Please enter a UK postcode.
Please tell us a little about the job.
  • Free survey visit
  • Engineer's calculations arranged
  • Building control handled
  • Fixed written price once scope is agreed
  • England, Wales, mainland Scotland & NI

Planning rear extension steels in Antrim

We cover rear extension steels in Antrim (BT41) and the streets around it. The wider Antrim and Newtownabbey area is covered as well. Each job is designed by a structural engineer and approved through Antrim and Newtownabbey Borough Council before work begins.

We work alongside your builder or as the steel package within the wider build. We arrange the engineer's design, coordinate building control, prop and open the rear wall at the right stage of the programme, and fit and pack the steels so the extension can be finished around them.

Worth knowing before you start

  • In older houses the rear wall may be solid brick in lime mortar, with timber lintels and shallow footings beneath. The engineer may ask for trial holes to see what the wall stands on before deciding where the steel will bear.
  • The original rear wall of most houses is load-bearing because it supports first-floor joists and the bedroom wall above. Even where the joists run parallel to it, the masonry overhead still needs carrying, so steel is almost always part of opening it up.
  • A single beam works where solid masonry is left at both ends of the opening. Where the opening runs nearly the full width or the corners are weak, the engineer may use columns or a goalpost frame, which is two posts and a beam bolted together.
  • The building control completion certificate for the extension covers the steelwork to the old rear wall. Keep it with the engineer's calculations and drawings, as a buyer's solicitor will expect to see the structural paperwork for the extension.
  • During the opening, props stand both inside the house and within the extension footprint. Where props bear on a newly laid slab, the propping plan checks that the slab can take those point loads, using spreaders where needed.

From survey to sign-off in Antrim

  1. Free visit

    A short visit to Antrim to see the job, agree what you want and check the bearings, floors and services that affect the design.

  2. Calculations

    The engineer's calculations and a simple drawing are prepared for your opening and shared with you before anything is ordered.

  3. Building control

    A full plans application or building notice goes to Antrim and Newtownabbey Borough Council under the Building Regulations (Northern Ireland) 2012 before work begins.

  4. Steel in, made good

    On site we prop, open up, fit and pack the steel, then fire protect, box in and plaster once the inspection is done.

Guide prices for rear extension steels in Antrim

As a guide, budget £2,150–£6,000 including VAT for opening into a rear extension in Antrim, based on published UK cost guides adjusted for prices in Northern Ireland (-14%).

JobTypical guide rangeWhat it usually covers
Opening into a rear extension£2,150–£6,000Original rear wall removed with a beam or goalpost, approvals and propping, coordinated with the extension build
Side return extension steelwork£3,000–£7,300Beams and posts along the old side wall line, propping and approvals (extension build extra)
Structural calculations for a beam£220–£640Site measure or photos, beam and padstone design and calculations for building control
Steel column or post£430–£1,290 per columnColumn supplied and fitted with base and cap plates on a pad foundation

Figures include our approximate regional adjustment for prices in Northern Ireland (-14%) and are rounded. How these figures are worked out.

Approvals in Antrim

Removing a load-bearing wall in Northern Ireland needs building control approval from the council. Antrim and Newtownabbey Borough Council covers Antrim. The engineer's calculations support the application, and a completion certificate is issued after the final inspection.

The Party Wall etc. Act does not extend to Northern Ireland. Shared walls are dealt with under your title and the general law, so we recommend agreeing access and the work with your neighbour before it starts.

Building rules in Northern Ireland

Rear extension steels near Antrim

Rear extension steels in Antrim: your questions

Can I stay at home while the work is done in Antrim?

Usually, yes. The work area is screened and floors are protected. The rooms either side of the opening are out of action for a few days, and there is some noise and dust while the masonry comes out.

Who approves rear extension steels in Antrim?

Structural work in Antrim needs a full plans application or building notice to Antrim and Newtownabbey Borough Council. We prepare and submit it with the structural engineer's calculations and arrange the inspections, so the completion paperwork follows the job.

Will my kitchen be out of action while the rear wall is opened?

For a few days, usually. The kitchen often sits against the rear wall, so units, sinks or appliances near the opening may need disconnecting while the wall is propped and removed. The work area is sheeted off and the rest of the house stays in use.

Can I have a flat ceiling between the house and the extension?

Often, yes, but it depends on the floor depth above and the loads involved. The steel can sometimes be set up into the floor zone so the ceiling runs through level, which usually means more work to the joists. This needs deciding before the engineer designs the steel.

How wide can a rear extension opening be?

There is no fixed limit, and openings across the full width of a house are common with the right steel. The engineer sizes the beam or frame for the span and the loads above. Wider spans need deeper or heavier steel and possibly columns, which affects headroom and cost.

Do you cover Antrim for rear extension steels?

Yes. We carry out rear extension steels in Antrim and the BT41 postcode districts. Book a free survey visit and we will check the wall, arrange the engineer's calculations and send an itemised written quote.

Planning to take a wall out?

Book a free survey visit. You get an itemised written quote covering calculations, building control, steel and making good.