
Rear extension steels · Hanworth
Rear extension steels in Hanworth
Rear extension steels in Hanworth, from free survey to completion certificate.
- Price fixed in writing once scope is agreed
- Building control arranged
- Temporary works and making good included
- Free survey visit
- Engineer's calculations arranged
- Building control handled
- Fixed written price once scope is agreed
- England, Wales, mainland Scotland & NI
Rear extension steels in Hanworth: how it works
Need rear extension steels in Hanworth? We also cover the surrounding towns and villages in London. We survey the property, arrange the engineer's design, deal with local building control, fit the steel and make good, all under one quote for TW1, TW2, TW3, TW4 and TW11 addresses.
We work alongside your builder or as the steel package within the wider build. We arrange the engineer's design, coordinate building control, prop and open the rear wall at the right stage of the programme, and fit and pack the steels so the extension can be finished around them.
What to expect
- The opening is usually formed once the extension walls and roof are up, so the house stays secure and dry. Leaving it too late can hold up plastering and floor screeding, so the steel date is agreed with the builder early on.
- In older houses the rear wall may be solid brick in lime mortar, with timber lintels and shallow footings beneath. The engineer may ask for trial holes to see what the wall stands on before deciding where the steel will bear.
- Columns carry concentrated loads, so each normally sits on a pad foundation designed by the engineer. Digging these inside an existing kitchen or through a solid concrete floor takes planning, especially where drains run close to the back wall.
- Where the extension ceiling and the house ceiling should run through at one level, the steel may need setting higher into the floor zone or tying in with the extension roof structure. That choice changes the steel design, so it is settled before calculations.
- In terraced and semi-detached houses one end of the beam often bears into the party wall. In England and Wales that is notifiable under the Party Wall etc. Act 1996, and the extension's own foundations near the boundary may need notices as well.
How the job runs in Hanworth
Survey in Hanworth
We visit, look at the wall and what sits above it, measure the opening and note services, access and how the steel can be brought in.
Engineer's design
A structural engineer sizes the beam, padstones and any posts, and sets out the temporary support needed while the wall is out.
Building control
We submit a building notice or full plans application to the local council's building control team, so approval is in place before the wall is touched.
Install and sign-off
Props go in, the opening is formed, the steel is set and packed, building control inspects it, and we make good.
How much should I budget in Hanworth?
As a guide, budget £3,200–£8,950 including VAT for opening into a rear extension in Hanworth, based on published UK cost guides adjusted for London prices (+28%).
| Job | Typical guide range | What it usually covers |
|---|---|---|
| Opening into a rear extension | £3,200–£8,950 | Original rear wall removed with a beam or goalpost, approvals and propping, coordinated with the extension build |
| Structural calculations for a beam | £320–£960 | Site measure or photos, beam and padstone design and calculations for building control |
| Rear wall opening for bi-fold or sliding doors | £3,200–£8,950 | External wall opened up to about 5 m with steel, propping, cavity tray and making good (doors supplied separately) |
| Steel column or post | £640–£1,920 per column | Column supplied and fitted with base and cap plates on a pad foundation |
Figures include our approximate regional adjustment for London prices (+28%) and are rounded. How these figures are worked out.
Approvals in Hanworth
Structural openings in English homes need building regulations approval before work starts. The local council's building control team can deal with it, or you can use a registered building control approver. Either way the steel is inspected before it is covered, and a completion certificate is issued at the end. Keep it safe for when you sell.
Terraced and semi-detached homes often need party wall notices, because cutting into a shared wall to take a beam end is notifiable under the Party Wall etc. Act 1996. Allow at least two months for the notice period unless your neighbour agrees sooner.
Questions about rear extension steels in Hanworth
Who approves rear extension steels in Hanworth?
Structural work in Hanworth needs a building notice or full plans application to the local council's building control team or a registered building control approver. We prepare and submit it with the structural engineer's calculations and arrange the inspections, so the completion paperwork follows the job.
What happens at the survey visit in Hanworth?
We look at the wall, the floor and ceiling either side and what sits above, measure the opening you want, and note cables, pipes and access for the steel. It usually takes under an hour and there is no charge.
Do I need a party wall agreement for extension steels?
In England and Wales, if a beam bears into a wall shared with a neighbour, or the extension foundations are dug close to theirs, notice under the Party Wall etc. Act 1996 is usually required. We can arrange the notices through a party wall surveyor. There is no equivalent legislation in Scotland or Northern Ireland.
Who designs the steels for a rear extension?
A structural engineer. Your architect's drawings show the layout, but the engineer calculates the beams, columns, connections and foundations. We arrange those calculations, or work from an engineer's design you already have, and make sure the details suit the builder's programme.
What is a goalpost frame in an extension?
A goalpost frame is two steel columns with a beam across the top, bolted together and standing on their own foundations. It is used where the opening is so wide that little masonry is left to bear on, or where the existing corners cannot take the load. The engineer decides whether one is needed.