Rear extension steels · Sevenoaks
Rear extension steels in Sevenoaks
Rear extension steels in Sevenoaks, from free survey to completion certificate.
- Free survey visit in Sevenoaks
- Engineer's calculations arranged
- Building control handled for you
- Free survey visit
- Engineer's calculations arranged
- Building control handled
- Fixed written price once scope is agreed
- England, Wales, mainland Scotland & NI
About our rear extension steels service in Sevenoaks
We carry out rear extension steels in Sevenoaks, covering the TN13 and TN14 postcode districts. It sits about 14.2 miles from Maidstone, which we also cover. The job starts with a free survey visit so the engineer's calculations are based on your actual walls, floors and loads.
We work alongside your builder or as the steel package within the wider build. We arrange the engineer's design, coordinate building control, prop and open the rear wall at the right stage of the programme, and fit and pack the steels so the extension can be finished around them.
Key points for your project
- Soil stacks, waste pipes, boiler flues and gas meters are often fixed to the back wall. These are moved before the wall opens, and any work on gas pipework must by law be carried out by a Gas Safe registered engineer.
- Columns carry concentrated loads, so each normally sits on a pad foundation designed by the engineer. Digging these inside an existing kitchen or through a solid concrete floor takes planning, especially where drains run close to the back wall.
- The opening is usually formed once the extension walls and roof are up, so the house stays secure and dry. Leaving it too late can hold up plastering and floor screeding, so the steel date is agreed with the builder early on.
- In terraced and semi-detached houses one end of the beam often bears into the party wall. In England and Wales that is notifiable under the Party Wall etc. Act 1996, and the extension's own foundations near the boundary may need notices as well.
- In older houses the rear wall may be solid brick in lime mortar, with timber lintels and shallow footings beneath. The engineer may ask for trial holes to see what the wall stands on before deciding where the steel will bear.
Four stages, one team
Look and measure
We check the wall, the span you want and what the wall is carrying, and photograph anything the engineer needs to see.
Design and price
Calculations come back from the engineer and we confirm your fixed written price, line by line.
Building control
We submit a building notice or full plans application to the local council's building control team, so approval is in place before the wall is touched.
Fit, inspect, finish
The work is propped and the steel installed and packed tight. After inspection the opening is boxed, plastered and left clean.
Guide prices for rear extension steels in Sevenoaks
As a guide, budget £2,800–£7,850 including VAT for opening into a rear extension in Sevenoaks, based on published UK cost guides adjusted for prices in the South East (+12%).
| Job | Typical guide range | What it usually covers |
|---|---|---|
| Opening into a rear extension | £2,800–£7,850 | Original rear wall removed with a beam or goalpost, approvals and propping, coordinated with the extension build |
| Rear wall opening for bi-fold or sliding doors | £2,800–£7,850 | External wall opened up to about 5 m with steel, propping, cavity tray and making good (doors supplied separately) |
| Side return extension steelwork | £3,900–£9,500 | Beams and posts along the old side wall line, propping and approvals (extension build extra) |
| Party wall surveyor (agreed surveyor, per neighbour) | £1,000–£2,250 per neighbour | Schedule of condition and award where a neighbour dissents; serving notice alone, where the neighbour consents, costs far less (England and Wales only) |
Figures include our approximate regional adjustment for prices in the South East (+12%) and are rounded. How these figures are worked out.
Building rules for Sevenoaks
In England, taking out a load-bearing wall or putting in a beam is building work under the Building Regulations 2010. It needs approval from building control, either the local council's building control team or a registered building control approver, through a full plans application or a building notice. Part A covers the structure and Part B covers fire safety, which is why steel in homes is usually fire protected.
If the beam bears into a wall you share with a neighbour, the Party Wall etc. Act 1996 applies, and a party structure notice must be served at least two months before that work starts. We arrange this through a party wall surveyor.
Local questions answered
Do you also work near Sevenoaks?
Yes. We also cover nearby towns including Tonbridge, Swanley, Tunbridge Wells and Caterham.
What happens at the survey visit in Sevenoaks?
We look at the wall, the floor and ceiling either side and what sits above, measure the opening you want, and note cables, pipes and access for the steel. It usually takes under an hour and there is no charge.
Who designs the steels for a rear extension?
A structural engineer. Your architect's drawings show the layout, but the engineer calculates the beams, columns, connections and foundations. We arrange those calculations, or work from an engineer's design you already have, and make sure the details suit the builder's programme.
Do I need a party wall agreement for extension steels?
In England and Wales, if a beam bears into a wall shared with a neighbour, or the extension foundations are dug close to theirs, notice under the Party Wall etc. Act 1996 is usually required. We can arrange the notices through a party wall surveyor. There is no equivalent legislation in Scotland or Northern Ireland.
Will my kitchen be out of action while the rear wall is opened?
For a few days, usually. The kitchen often sits against the rear wall, so units, sinks or appliances near the opening may need disconnecting while the wall is propped and removed. The work area is sheeted off and the rest of the house stays in use.
Can I stay at home while the work is done in Sevenoaks?
Usually, yes. The work area is screened and floors are protected. The rooms either side of the opening are out of action for a few days, and there is some noise and dust while the masonry comes out.