Rear extension steels · Folkestone
Rear extension steels in Folkestone
Steelwork, approvals and making good for rear extension steels in Folkestone and nearby.
- Survey, design and installation in one
- Covering CT18, CT19, CT20
- Inspected before it is covered
- Free survey visit
- Engineer's calculations arranged
- Building control handled
- Fixed written price once scope is agreed
- England, Wales, mainland Scotland & NI
What rear extension steels involve in Folkestone
We carry out rear extension steels in Folkestone, covering the CT18, CT19 and CT20 postcode districts. We also cover the surrounding towns and villages in Kent. The job starts with a free survey visit so the engineer's calculations are based on your actual walls, floors and loads.
Building a rear extension is only half of the open-plan result. The original back wall still holds up the first floor and the rear wall of the bedrooms above, so opening it needs steel. Depending on the width and what is left to bear on, that could be a single beam on padstones, a beam on columns, or a full goalpost frame.
Things to plan for
- Where the extension ceiling and the house ceiling should run through at one level, the steel may need setting higher into the floor zone or tying in with the extension roof structure. That choice changes the steel design, so it is settled before calculations.
- In older houses the rear wall may be solid brick in lime mortar, with timber lintels and shallow footings beneath. The engineer may ask for trial holes to see what the wall stands on before deciding where the steel will bear.
- Two-storey rear extensions add a second level of loads to think about. Steels at first-floor level may carry the existing rear wall of the bedrooms or tie the new roof into the old one, so the engineer looks at both floors together.
- When bi-fold or sliding doors sit directly beneath the new steel, the beam has to stay stiff enough not to bind the door panels. The engineer sets a tighter deflection limit, which can mean a deeper or heavier section than strength alone would need.
- In terraced and semi-detached houses one end of the beam often bears into the party wall. In England and Wales that is notifiable under the Party Wall etc. Act 1996, and the extension's own foundations near the boundary may need notices as well.
How the job runs in Folkestone
Free visit
A short visit to Folkestone to see the job, agree what you want and check the bearings, floors and services that affect the design.
Calculations
The engineer's calculations and a simple drawing are prepared for your opening and shared with you before anything is ordered.
Building control
We submit a building notice or full plans application to the local council's building control team, so approval is in place before the wall is touched.
Steel in, made good
On site we prop, open up, fit and pack the steel, then fire protect, box in and plaster once the inspection is done.
Guide prices for rear extension steels in Folkestone
As a guide, budget £2,800–£7,850 including VAT for opening into a rear extension in Folkestone, based on published UK cost guides adjusted for prices in the South East (+12%).
| Job | Typical guide range | What it usually covers |
|---|---|---|
| Opening into a rear extension | £2,800–£7,850 | Original rear wall removed with a beam or goalpost, approvals and propping, coordinated with the extension build |
| Steel column or post | £560–£1,680 per column | Column supplied and fitted with base and cap plates on a pad foundation |
| Steel goalpost frame | £2,250–£6,700 | Two posts and a beam bolted as a frame, pad foundations, base plates and fitting |
| Structural calculations for a beam | £280–£840 | Site measure or photos, beam and padstone design and calculations for building control |
Figures include our approximate regional adjustment for prices in the South East (+12%) and are rounded. How these figures are worked out.
Building control and neighbours in Folkestone
In England, taking out a load-bearing wall or putting in a beam is building work under the Building Regulations 2010. It needs approval from building control, either the local council's building control team or a registered building control approver, through a full plans application or a building notice. Part A covers the structure and Part B covers fire safety, which is why steel in homes is usually fire protected.
Terraced and semi-detached homes often need party wall notices, because cutting into a shared wall to take a beam end is notifiable under the Party Wall etc. Act 1996. Allow at least two months for the notice period unless your neighbour agrees sooner.
Local questions answered
Do you also work near Folkestone?
Yes. We also cover nearby towns including Dover, Ashford, Deal and Canterbury.
Can you work on older or listed homes in Folkestone?
Yes. Older homes often have lime mortar, timber lintels or shallow footings, which the engineer allows for. Listed buildings need listed building consent for internal structural changes as well as building regulations approval, and that must be in place first.
Do I need a steel beam for my rear extension?
If the original back wall is being opened up into the extension, almost certainly yes. That wall normally carries the first floor and the wall above, so a beam, columns or a goalpost frame takes over the job. A structural engineer confirms exactly what is needed once the opening width and loads are known.
Will my kitchen be out of action while the rear wall is opened?
For a few days, usually. The kitchen often sits against the rear wall, so units, sinks or appliances near the opening may need disconnecting while the wall is propped and removed. The work area is sheeted off and the rest of the house stays in use.
Who designs the steels for a rear extension?
A structural engineer. Your architect's drawings show the layout, but the engineer calculates the beams, columns, connections and foundations. We arrange those calculations, or work from an engineer's design you already have, and make sure the details suit the builder's programme.
Can I stay at home while the work is done in Folkestone?
Usually, yes. The work area is screened and floors are protected. The rooms either side of the opening are out of action for a few days, and there is some noise and dust while the masonry comes out.