
Rear extension steels · Inverness
Rear extension steels in Inverness
Steelwork, approvals and making good for rear extension steels in Inverness and nearby.
- Price fixed in writing once scope is agreed
- Building warrant arranged
- Temporary works and making good included
- Free survey visit
- Engineer's calculations arranged
- Building control handled
- Fixed written price once scope is agreed
- England, Wales, mainland Scotland & NI
What rear extension steels involve in Inverness
Planning rear extension steels in Inverness? Our team covers IV1, IV2 and IV3 and the streets around them. Our coverage runs across the Highlands, so nearby villages are included too. You get one written quote for the calculations, approvals, propping, steel and making good.
Building a rear extension is only half of the open-plan result. The original back wall still holds up the first floor and the rear wall of the bedrooms above, so opening it needs steel. Depending on the width and what is left to bear on, that could be a single beam on padstones, a beam on columns, or a full goalpost frame.
Things to plan for
- During the opening, props stand both inside the house and within the extension footprint. Where props bear on a newly laid slab, the propping plan checks that the slab can take those point loads, using spreaders where needed.
- The building standards completion certificate for the extension covers the steelwork to the old rear wall. Keep it with the engineer's calculations and drawings, as a buyer's solicitor will expect to see the structural paperwork for the extension.
- The original rear wall of most houses is load-bearing because it supports first-floor joists and the bedroom wall above. Even where the joists run parallel to it, the masonry overhead still needs carrying, so steel is almost always part of opening it up.
- The opening is usually formed once the extension walls and roof are up, so the house stays secure and dry. Leaving it too late can hold up plastering and floor screeding, so the steel date is agreed with the builder early on.
- In older houses the rear wall may be solid brick in lime mortar, with timber lintels and shallow footings beneath. The engineer may ask for trial holes to see what the wall stands on before deciding where the steel will bear.
From survey to sign-off in Inverness
Free visit
A short visit to Inverness to see the job, agree what you want and check the bearings, floors and services that affect the design.
Calculations
The engineer's calculations and a simple drawing are prepared for your opening and shared with you before anything is ordered.
Building warrant
A building warrant is applied for from The Highland Council, and work starts only once the warrant has been granted.
Steel in, made good
On site we prop, open up, fit and pack the steel, then fire protect, box in and plaster once the inspection is done.
Guide prices for rear extension steels in Inverness
As a guide, budget £2,300–£6,350 including VAT for opening into a rear extension in Inverness, based on published UK cost guides adjusted for prices in Scotland (-9%).
| Job | Typical guide range | What it usually covers |
|---|---|---|
| Opening into a rear extension | £2,300–£6,350 | Original rear wall removed with a beam or goalpost, approvals and propping, coordinated with the extension build |
| Steel column or post | £460–£1,360 per column | Column supplied and fitted with base and cap plates on a pad foundation |
| Steel goalpost frame | £1,800–£5,450 | Two posts and a beam bolted as a frame, pad foundations, base plates and fitting |
Figures include our approximate regional adjustment for prices in Scotland (-9%) and are rounded. How these figures are worked out.
Approvals in Inverness
Scottish rules are stricter on timing than in England: the building warrant must be in place before the wall is touched. We prepare the application with the engineer's calculations and submit it to The Highland Council. The finished work is then certified and a completion certificate submitted for acceptance.
Scotland has no Party Wall Act. Work affecting a shared wall is governed by your title deeds and the general law, and in flats by the Tenements (Scotland) Act 2004, so it is sensible to agree the work with neighbours in writing before starting.
Rear extension steels in Inverness: your questions
Can I stay at home while the work is done in Inverness?
Usually, yes. The work area is screened and floors are protected. The rooms either side of the opening are out of action for a few days, and there is some noise and dust while the masonry comes out.
Can you work on older or listed homes in Inverness?
Yes. Older homes often have lime mortar, timber lintels or shallow footings, which the engineer allows for. Listed buildings need listed building consent for internal structural changes as well as building regulations approval, and that must be in place first.
Is the steel included in the extension's building regulations?
Yes. The steelwork is part of the extension, so the engineer's calculations go to building standards with the extension application and the steel is inspected before it is covered. The completion certificate issued for the extension then covers the structural work to the rear wall.
Can I use my own builder for the extension and you for the steels?
Yes. We can supply and fit the steel package while another builder handles the extension shell and finishes. Dates are agreed with them so the rear wall is opened at the right stage, and the engineer's details are shared so levels, padstones and foundations line up.
Can I have a flat ceiling between the house and the extension?
Often, yes, but it depends on the floor depth above and the loads involved. The steel can sometimes be set up into the floor zone so the ceiling runs through level, which usually means more work to the joists. This needs deciding before the engineer designs the steel.
Do you also work near Inverness?
Yes. We also cover nearby towns including Dingwall, Alness, Nairn and Aviemore.