Steel BeamInstallers
Rear extension under construction with a steel beam over the opening into the house

Rear extension steels · Basingstoke

Rear extension steels in Basingstoke

Steelwork, approvals and making good for rear extension steels in Basingstoke and nearby.

  • Price fixed in writing once scope is agreed
  • Building control arranged
  • Temporary works and making good included

Free survey in Basingstoke

Tell us about the rear extension steel job in Basingstoke.

Please enter your name.
Please enter a UK phone number.
Please enter a valid email.
Please enter a UK postcode.
Please tell us a little about the job.
  • Free survey visit
  • Engineer's calculations arranged
  • Building control handled
  • Fixed written price once scope is agreed
  • England, Wales, mainland Scotland & NI

What rear extension steels involve in Basingstoke

For homes in Basingstoke and the RG21, RG22, RG23 and RG24 districts, we handle rear extension steels from survey to sign-off. Basingstoke is around 14.3 miles from Reading, and we cover both. The beam is sized by a structural engineer and inspected before it is boxed in.

Building a rear extension is only half of the open-plan result. The original back wall still holds up the first floor and the rear wall of the bedrooms above, so opening it needs steel. Depending on the width and what is left to bear on, that could be a single beam on padstones, a beam on columns, or a full goalpost frame.

What to expect

  • Two-storey rear extensions add a second level of loads to think about. Steels at first-floor level may carry the existing rear wall of the bedrooms or tie the new roof into the old one, so the engineer looks at both floors together.
  • Soil stacks, waste pipes, boiler flues and gas meters are often fixed to the back wall. These are moved before the wall opens, and any work on gas pipework must by law be carried out by a Gas Safe registered engineer.
  • A single beam works where solid masonry is left at both ends of the opening. Where the opening runs nearly the full width or the corners are weak, the engineer may use columns or a goalpost frame, which is two posts and a beam bolted together.
  • During the opening, props stand both inside the house and within the extension footprint. Where props bear on a newly laid slab, the propping plan checks that the slab can take those point loads, using spreaders where needed.
  • In terraced and semi-detached houses one end of the beam often bears into the party wall. In England and Wales that is notifiable under the Party Wall etc. Act 1996, and the extension's own foundations near the boundary may need notices as well.

How the job runs in Basingstoke

  1. Free visit

    A short visit to Basingstoke to see the job, agree what you want and check the bearings, floors and services that affect the design.

  2. Calculations

    The engineer's calculations and a simple drawing are prepared for your opening and shared with you before anything is ordered.

  3. Building control

    We submit a building notice or full plans application to the local council's building control team, so approval is in place before the wall is touched.

  4. Steel in, made good

    On site we prop, open up, fit and pack the steel, then fire protect, box in and plaster once the inspection is done.

What do rear extension steels cost in Basingstoke?

As a guide, budget £2,800–£7,850 including VAT for opening into a rear extension in Basingstoke, based on published UK cost guides adjusted for prices in the South East (+12%).

JobTypical guide rangeWhat it usually covers
Opening into a rear extension£2,800–£7,850Original rear wall removed with a beam or goalpost, approvals and propping, coordinated with the extension build
Party wall surveyor (agreed surveyor, per neighbour)£1,000–£2,250 per neighbourSchedule of condition and award where a neighbour dissents; serving notice alone, where the neighbour consents, costs far less (England and Wales only)
Side return extension steelwork£3,900–£9,500Beams and posts along the old side wall line, propping and approvals (extension build extra)
Structural calculations for a beam£280–£840Site measure or photos, beam and padstone design and calculations for building control

Figures include our approximate regional adjustment for prices in the South East (+12%) and are rounded. How these figures are worked out.

Building rules for Basingstoke

In England, taking out a load-bearing wall or putting in a beam is building work under the Building Regulations 2010. It needs approval from building control, either the local council's building control team or a registered building control approver, through a full plans application or a building notice. Part A covers the structure and Part B covers fire safety, which is why steel in homes is usually fire protected.

Terraced and semi-detached homes often need party wall notices, because cutting into a shared wall to take a beam end is notifiable under the Party Wall etc. Act 1996. Allow at least two months for the notice period unless your neighbour agrees sooner.

Building rules in England

Rear extension steels near Basingstoke

Questions about rear extension steels in Basingstoke

How soon can rear extension steels start in Basingstoke?

Start dates depend on the engineer's calculations, the building control approval and, where needed, party wall notice periods. We give you a realistic timetable after the survey and keep you updated as each approval comes through.

Who approves rear extension steels in Basingstoke?

Structural work in Basingstoke needs a building notice or full plans application to the local council's building control team or a registered building control approver. We prepare and submit it with the structural engineer's calculations and arrange the inspections, so the completion paperwork follows the job.

When does the back wall come out during an extension build?

Usually once the extension walls and roof are up and the new space is weathertight. That keeps the house secure and dry while the opening is formed. The steel goes in, building control inspects it, and the builder then carries the floors and ceilings through.

Do I need a steel beam for my rear extension?

If the original back wall is being opened up into the extension, almost certainly yes. That wall normally carries the first floor and the wall above, so a beam, columns or a goalpost frame takes over the job. A structural engineer confirms exactly what is needed once the opening width and loads are known.

Will my kitchen be out of action while the rear wall is opened?

For a few days, usually. The kitchen often sits against the rear wall, so units, sinks or appliances near the opening may need disconnecting while the wall is propped and removed. The work area is sheeted off and the rest of the house stays in use.

Do I need a party wall agreement for rear extension steels in Basingstoke?

Yes, if the beam bears into a shared wall: the Party Wall etc. Act 1996 applies in England and Wales, and a party structure notice must be served at least two months before that work starts. We arrange it through a party wall surveyor.

Planning to take a wall out?

Book a free survey visit. You get an itemised written quote covering calculations, building control, steel and making good.