
Rear extension steels · Eccles
Rear extension steels in Eccles
Rear extension steels for homes in M5, M6, M27, designed by a structural engineer.
- Price fixed in writing once scope is agreed
- Building control arranged
- Temporary works and making good included
- Free survey visit
- Engineer's calculations arranged
- Building control handled
- Fixed written price once scope is agreed
- England, Wales, mainland Scotland & NI
About our rear extension steels service in Eccles
Our rear extension steels service in Eccles covers everything from the first visit to the completion paperwork. It sits about 1.8 miles from Salford, which we also cover. Postcode districts we cover here include M5, M6, M27 and M30.
We work alongside your builder or as the steel package within the wider build. We arrange the engineer's design, coordinate building control, prop and open the rear wall at the right stage of the programme, and fit and pack the steels so the extension can be finished around them.
Worth knowing before you start
- Opening the rear wall is usually the dustiest stage of an extension project. The work face is sheeted off from the rest of the house, and the kitchen is often out of use for a few days while the opening is formed and the steel goes in.
- In terraced and semi-detached houses one end of the beam often bears into the party wall. In England and Wales that is notifiable under the Party Wall etc. Act 1996, and the extension's own foundations near the boundary may need notices as well.
- Columns carry concentrated loads, so each normally sits on a pad foundation designed by the engineer. Digging these inside an existing kitchen or through a solid concrete floor takes planning, especially where drains run close to the back wall.
- Where the extension ceiling and the house ceiling should run through at one level, the steel may need setting higher into the floor zone or tying in with the extension roof structure. That choice changes the steel design, so it is settled before calculations.
- Two-storey rear extensions add a second level of loads to think about. Steels at first-floor level may carry the existing rear wall of the bedrooms or tie the new roof into the old one, so the engineer looks at both floors together.
How the job runs in Eccles
Look and measure
We check the wall, the span you want and what the wall is carrying, and photograph anything the engineer needs to see.
Design and price
Calculations come back from the engineer and we confirm your fixed written price, line by line.
Building control
We submit a building notice or full plans application to Salford City Council, so approval is in place before the wall is touched.
Fit, inspect, finish
The work is propped and the steel installed and packed tight. After inspection the opening is boxed, plastered and left clean.
How much should I budget in Eccles?
As a guide, budget £2,400–£6,700 including VAT for opening into a rear extension in Eccles, based on published UK cost guides adjusted for prices in the North West (-4%).
| Job | Typical guide range | What it usually covers |
|---|---|---|
| Opening into a rear extension | £2,400–£6,700 | Original rear wall removed with a beam or goalpost, approvals and propping, coordinated with the extension build |
| Party wall surveyor (agreed surveyor, per neighbour) | £860–£1,920 per neighbour | Schedule of condition and award where a neighbour dissents; serving notice alone, where the neighbour consents, costs far less (England and Wales only) |
| Steel goalpost frame | £1,900–£5,750 | Two posts and a beam bolted as a frame, pad foundations, base plates and fitting |
| Steel column or post | £480–£1,440 per column | Column supplied and fitted with base and cap plates on a pad foundation |
Figures include our approximate regional adjustment for prices in the North West (-4%) and are rounded. How these figures are worked out.
Building control and neighbours in Eccles
Structural openings in English homes need building regulations approval before work starts. Salford City Council can deal with it, or you can use a registered building control approver. Either way the steel is inspected before it is covered, and a completion certificate is issued at the end. Keep it safe for when you sell.
Terraced and semi-detached homes often need party wall notices, because cutting into a shared wall to take a beam end is notifiable under the Party Wall etc. Act 1996. Allow at least two months for the notice period unless your neighbour agrees sooner.
Local questions answered
Do you also work near Eccles?
Yes. We also cover nearby towns including Swinton, Salford, Stretford and Urmston.
Can you work on older or listed homes in Eccles?
Yes. Older homes often have lime mortar, timber lintels or shallow footings, which the engineer allows for. Listed buildings need listed building consent for internal structural changes as well as building regulations approval, and that must be in place first.
Can I use my own builder for the extension and you for the steels?
Yes. We can supply and fit the steel package while another builder handles the extension shell and finishes. Dates are agreed with them so the rear wall is opened at the right stage, and the engineer's details are shared so levels, padstones and foundations line up.
Is the steel included in the extension's building regulations?
Yes. The steelwork is part of the extension, so the engineer's calculations go to building control with the extension application and the steel is inspected before it is covered. The completion certificate issued for the extension then covers the structural work to the rear wall.
Do I need a steel beam for my rear extension?
If the original back wall is being opened up into the extension, almost certainly yes. That wall normally carries the first floor and the wall above, so a beam, columns or a goalpost frame takes over the job. A structural engineer confirms exactly what is needed once the opening width and loads are known.
Do I need a party wall agreement for rear extension steels in Eccles?
Yes, if the beam bears into a shared wall: the Party Wall etc. Act 1996 applies in England and Wales, and a party structure notice must be served at least two months before that work starts. We arrange it through a party wall surveyor.