Rear extension under construction with a steel beam over the opening into the house

Rear extension steels · East Dunbartonshire

Rear extension steels in East Dunbartonshire

Survey, engineer's design and installation of rear extension steels anywhere in East Dunbartonshire.

  • Survey, design and installation in one
  • Covering G61, G62, G64, G66
  • Inspected before it is covered

Free survey in East Dunbartonshire

Tell us about your rear extension steels project in East Dunbartonshire.

Please enter your name.
Please enter a UK phone number.
Please enter a valid email.
Please enter a UK postcode.
Please tell us a little about the job.
  • Free survey visit
  • Engineer's calculations arranged
  • Building control handled
  • Fixed written price once scope is agreed
  • England, Wales, mainland Scotland & NI

Rear extension steels in East Dunbartonshire: how it works

Rear extension steels are the beams, columns and frames that let the original back wall of a house be opened up into a new extension. Sized by a structural engineer, they pick up the floor, wall and roof loads that the old wall carried and pass them into bearings or foundations, so the new and old spaces join as one open room.

Homes across East Dunbartonshire range from Victorian terraces to post-war semis and newer estates, and rear extension steels look different in each. Towns we cover include Bishopbriggs, Bearsden and Kirkintilloch, among other places in the area. We plan the steel, the temporary support and the approvals around the building, then fix the price in writing once the scope is agreed.

Key points for your project

  • When bi-fold or sliding doors sit directly beneath the new steel, the beam has to stay stiff enough not to bind the door panels. The engineer sets a tighter deflection limit, which can mean a deeper or heavier section than strength alone would need.
  • In older houses the rear wall may be solid brick in lime mortar, with timber lintels and shallow footings beneath. The engineer may ask for trial holes to see what the wall stands on before deciding where the steel will bear.
  • During the opening, props stand both inside the house and within the extension footprint. Where props bear on a newly laid slab, the propping plan checks that the slab can take those point loads, using spreaders where needed.
  • The building standards completion certificate for the extension covers the steelwork to the old rear wall. Keep it with the engineer's calculations and drawings, as a buyer's solicitor will expect to see the structural paperwork for the extension.
  • Soil stacks, waste pipes, boiler flues and gas meters are often fixed to the back wall. These are moved before the wall opens, and any work on gas pipework must by law be carried out by a Gas Safe registered engineer.

From survey to sign-off in East Dunbartonshire

  1. Survey in East Dunbartonshire

    We visit, look at the wall and what sits above it, measure the opening and note services, access and how the steel can be brought in.

  2. Engineer's design

    A structural engineer sizes the beam, padstones and any posts, and sets out the temporary support needed while the wall is out.

  3. Building warrant

    A building warrant is applied for from East Dunbartonshire Council, and work starts only once the warrant has been granted.

  4. Install and sign-off

    Props go in, the opening is formed, the steel is set and packed, building standards inspects it, and we make good.

How much should I budget in East Dunbartonshire?

As a guide, budget £2,300–£6,350 including VAT for opening into a rear extension in East Dunbartonshire, based on published UK cost guides adjusted for prices in Scotland (-9%).

JobTypical guide rangeWhat it usually covers
Opening into a rear extension£2,300–£6,350Original rear wall removed with a beam or goalpost, approvals and propping, coordinated with the extension build
Rear wall opening for bi-fold or sliding doors£2,300–£6,350External wall opened up to about 5 m with steel, propping, cavity tray and making good (doors supplied separately)
Side return extension steelwork£3,200–£7,750Beams and posts along the old side wall line, propping and approvals (extension build extra)
Steel column or post£460–£1,360 per columnColumn supplied and fitted with base and cap plates on a pad foundation

Figures include our approximate regional adjustment for prices in Scotland (-9%) and are rounded. How these figures are worked out.

Building control and neighbours in East Dunbartonshire

Scottish rules are stricter on timing than in England: the building warrant must be in place before the wall is touched. We prepare the application with the engineer's calculations and submit it to East Dunbartonshire Council. The finished work is then certified and a completion certificate submitted for acceptance.

Scotland has no Party Wall Act. Work affecting a shared wall is governed by your title deeds and the general law, and in flats by the Tenements (Scotland) Act 2004, so it is sensible to agree the work with neighbours in writing before starting.

Building rules in Scotland

Rear extension steels by town

Local questions answered

What happens at the survey visit in East Dunbartonshire?

We look at the wall, the floor and ceiling either side and what sits above, measure the opening you want, and note cables, pipes and access for the steel. It usually takes under an hour and there is no charge.

Do I need a party wall agreement for rear extension steels in East Dunbartonshire?

There is no Party Wall Act in Scotland. Your title deeds and the general law apply instead, and the Tenements (Scotland) Act 2004 for flats, so agree the work with your neighbour in writing before it starts.

How wide can a rear extension opening be?

There is no fixed limit, and openings across the full width of a house are common with the right steel. The engineer sizes the beam or frame for the span and the loads above. Wider spans need deeper or heavier steel and possibly columns, which affects headroom and cost.

Is the steel included in the extension's building regulations?

Yes. The steelwork is part of the extension, so the engineer's calculations go to building standards with the extension application and the steel is inspected before it is covered. The completion certificate issued for the extension then covers the structural work to the rear wall.

Who designs the steels for a rear extension?

A structural engineer. Your architect's drawings show the layout, but the engineer calculates the beams, columns, connections and foundations. We arrange those calculations, or work from an engineer's design you already have, and make sure the details suit the builder's programme.

Can I use my own builder for the extension and you for the steels?

Yes. We can supply and fit the steel package while another builder handles the extension shell and finishes. Dates are agreed with them so the rear wall is opened at the right stage, and the engineer's details are shared so levels, padstones and foundations line up.

Planning to take a wall out?

Book a free survey visit. You get an itemised written quote covering calculations, building control, steel and making good.