  • Survey, design and installation in one
  • Covering TS15, TS16, TS17
  • Inspected before it is covered

Free survey in Thornaby-on-Tees

Tell us about the rear extension steel job in Thornaby-on-Tees.

Please enter your name.
Please enter a UK phone number.
Please enter a valid email.
Please enter a UK postcode.
Please tell us a little about the job.
  • Free survey visit
  • Engineer's calculations arranged
  • Building control handled
  • Fixed written price once scope is agreed
  • England, Wales, mainland Scotland & NI

About our rear extension steels service in Thornaby-on-Tees

Thornaby-on-Tees has a mix of housing, and rear extension steels need a slightly different approach in each. We also work in nearby Middlesbrough, roughly 4.0 miles away. Whatever the age of the property, the steel goes in on proper bearings with temporary support in place throughout.

We work alongside your builder or as the steel package within the wider build. We arrange the engineer's design, coordinate building control, prop and open the rear wall at the right stage of the programme, and fit and pack the steels so the extension can be finished around them.

Worth knowing before you start

  • A single beam works where solid masonry is left at both ends of the opening. Where the opening runs nearly the full width or the corners are weak, the engineer may use columns or a goalpost frame, which is two posts and a beam bolted together.
  • Where the extension ceiling and the house ceiling should run through at one level, the steel may need setting higher into the floor zone or tying in with the extension roof structure. That choice changes the steel design, so it is settled before calculations.
  • The steelwork forms part of the extension's building regulations approval, and the engineer's calculations go in with it. Planning for the extension itself is separate; many rear extensions to houses in England fall within permitted development, subject to size limits and conditions.
  • In older houses the rear wall may be solid brick in lime mortar, with timber lintels and shallow footings beneath. The engineer may ask for trial holes to see what the wall stands on before deciding where the steel will bear.
  • The original rear wall of most houses is load-bearing because it supports first-floor joists and the bedroom wall above. Even where the joists run parallel to it, the masonry overhead still needs carrying, so steel is almost always part of opening it up.

Four stages, one team

  1. Look and measure

    We check the wall, the span you want and what the wall is carrying, and photograph anything the engineer needs to see.

  2. Design and price

    Calculations come back from the engineer and we confirm your fixed written price, line by line.

  3. Building control

    We submit a building notice or full plans application to Stockton-on-Tees Borough Council, so approval is in place before the wall is touched.

  4. Fit, inspect, finish

    The work is propped and the steel installed and packed tight. After inspection the opening is boxed, plastered and left clean.

Guide prices for rear extension steels in Thornaby-on-Tees

As a guide, budget £2,300–£6,500 including VAT for opening into a rear extension in Thornaby-on-Tees, based on published UK cost guides adjusted for prices in the North East (-7%).

JobTypical guide rangeWhat it usually covers
Opening into a rear extension£2,300–£6,500Original rear wall removed with a beam or goalpost, approvals and propping, coordinated with the extension build
Structural calculations for a beam£230–£700Site measure or photos, beam and padstone design and calculations for building control
Rear wall opening for bi-fold or sliding doors£2,300–£6,500External wall opened up to about 5 m with steel, propping, cavity tray and making good (doors supplied separately)
Steel goalpost frame£1,850–£5,600Two posts and a beam bolted as a frame, pad foundations, base plates and fitting

Figures include our approximate regional adjustment for prices in the North East (-7%) and are rounded. How these figures are worked out.

Building control and neighbours in Thornaby-on-Tees

For Thornaby-on-Tees, building control is provided by Stockton-on-Tees Borough Council, or by a registered building control approver if preferred. We send them the engineer's calculations with a building notice or full plans application and book the inspections. Work done without approval can cause problems at sale and is far dearer to put right later.

Terraced and semi-detached homes often need party wall notices, because cutting into a shared wall to take a beam end is notifiable under the Party Wall etc. Act 1996. Allow at least two months for the notice period unless your neighbour agrees sooner.

Building rules in England

Rear extension steels near Thornaby-on-Tees

Rear extension steels in Thornaby-on-Tees: your questions

How soon can rear extension steels start in Thornaby-on-Tees?

Start dates depend on the engineer's calculations, the building control approval and, where needed, party wall notice periods. We give you a realistic timetable after the survey and keep you updated as each approval comes through.

Do you cover Thornaby-on-Tees for rear extension steels?

Yes. We carry out rear extension steels in Thornaby-on-Tees and the TS15, TS16, TS17 and TS18 postcode districts. Book a free survey visit and we will check the wall, arrange the engineer's calculations and send an itemised written quote.

Is the steel included in the extension's building regulations?

Yes. The steelwork is part of the extension, so the engineer's calculations go to building control with the extension application and the steel is inspected before it is covered. The completion certificate issued for the extension then covers the structural work to the rear wall.

Can I have a flat ceiling between the house and the extension?

Often, yes, but it depends on the floor depth above and the loads involved. The steel can sometimes be set up into the floor zone so the ceiling runs through level, which usually means more work to the joists. This needs deciding before the engineer designs the steel.

Who designs the steels for a rear extension?

A structural engineer. Your architect's drawings show the layout, but the engineer calculates the beams, columns, connections and foundations. We arrange those calculations, or work from an engineer's design you already have, and make sure the details suit the builder's programme.

Planning to take a wall out?

Book a free survey visit. You get an itemised written quote covering calculations, building control, steel and making good.