Steel BeamInstallers
Rear extension under construction with a steel beam over the opening into the house

Rear extension steels · Coleraine

Rear extension steels in Coleraine

Rear extension steels in Coleraine, from free survey to completion certificate.

  • Itemised written quote
  • Beam sized by a structural engineer
  • Covering Coleraine and nearby

Free survey in Coleraine

Tell us about the rear extension steel job in Coleraine.

Please enter your name.
Please enter a UK phone number.
Please enter a valid email.
Please enter a UK postcode.
Please tell us a little about the job.
  • Free survey visit
  • Engineer's calculations arranged
  • Building control handled
  • Fixed written price once scope is agreed
  • England, Wales, mainland Scotland & NI

Planning rear extension steels in Coleraine

Planning rear extension steels in Coleraine? Our team covers BT52 and the streets around them. Our coverage runs across Causeway Coast and Glens, so nearby villages are included too. You get one written quote for the calculations, approvals, propping, steel and making good.

Building a rear extension is only half of the open-plan result. The original back wall still holds up the first floor and the rear wall of the bedrooms above, so opening it needs steel. Depending on the width and what is left to bear on, that could be a single beam on padstones, a beam on columns, or a full goalpost frame.

Key points for your project

  • Columns carry concentrated loads, so each normally sits on a pad foundation designed by the engineer. Digging these inside an existing kitchen or through a solid concrete floor takes planning, especially where drains run close to the back wall.
  • When bi-fold or sliding doors sit directly beneath the new steel, the beam has to stay stiff enough not to bind the door panels. The engineer sets a tighter deflection limit, which can mean a deeper or heavier section than strength alone would need.
  • In older houses the rear wall may be solid brick in lime mortar, with timber lintels and shallow footings beneath. The engineer may ask for trial holes to see what the wall stands on before deciding where the steel will bear.
  • Opening the rear wall is usually the dustiest stage of an extension project. The work face is sheeted off from the rest of the house, and the kitchen is often out of use for a few days while the opening is formed and the steel goes in.
  • During the opening, props stand both inside the house and within the extension footprint. Where props bear on a newly laid slab, the propping plan checks that the slab can take those point loads, using spreaders where needed.

Four stages, one team

  1. Survey in Coleraine

    We visit, look at the wall and what sits above it, measure the opening and note services, access and how the steel can be brought in.

  2. Engineer's design

    A structural engineer sizes the beam, padstones and any posts, and sets out the temporary support needed while the wall is out.

  3. Building control

    A full plans application or building notice goes to Causeway Coast and Glens Borough Council under the Building Regulations (Northern Ireland) 2012 before work begins.

  4. Install and sign-off

    Props go in, the opening is formed, the steel is set and packed, building control inspects it, and we make good.

What do rear extension steels cost in Coleraine?

As a guide, budget £2,150–£6,000 including VAT for opening into a rear extension in Coleraine, based on published UK cost guides adjusted for prices in Northern Ireland (-14%).

JobTypical guide rangeWhat it usually covers
Opening into a rear extension£2,150–£6,000Original rear wall removed with a beam or goalpost, approvals and propping, coordinated with the extension build
Steel column or post£430–£1,290 per columnColumn supplied and fitted with base and cap plates on a pad foundation
Steel goalpost frame£1,700–£5,150Two posts and a beam bolted as a frame, pad foundations, base plates and fitting

Figures include our approximate regional adjustment for prices in Northern Ireland (-14%) and are rounded. How these figures are worked out.

Building control and neighbours in Coleraine

In Northern Ireland, structural work comes under the Building Regulations (Northern Ireland) 2012 and is approved by the local council's building control. For Coleraine that is Causeway Coast and Glens Borough Council. We submit a full plans application or building notice before work starts and book the inspections.

The Party Wall etc. Act does not extend to Northern Ireland. Shared walls are dealt with under your title and the general law, so we recommend agreeing access and the work with your neighbour before it starts.

Building rules in Northern Ireland

Rear extension steels near Coleraine

Rear extension steels in Coleraine: your questions

How soon can rear extension steels start in Coleraine?

Start dates depend on the engineer's calculations, the building control approval and any agreement needed with neighbours. We give you a realistic timetable after the survey and keep you updated as each approval comes through.

Do I need a party wall agreement for rear extension steels in Coleraine?

There is no Party Wall Act in Northern Ireland. Your title deeds and the general law apply instead, so agree the work with your neighbour in writing before it starts.

Is the steel included in the extension's building regulations?

Yes. The steelwork is part of the extension, so the engineer's calculations go to building control with the extension application and the steel is inspected before it is covered. The completion certificate issued for the extension then covers the structural work to the rear wall.

Can I have a flat ceiling between the house and the extension?

Often, yes, but it depends on the floor depth above and the loads involved. The steel can sometimes be set up into the floor zone so the ceiling runs through level, which usually means more work to the joists. This needs deciding before the engineer designs the steel.

Who designs the steels for a rear extension?

A structural engineer. Your architect's drawings show the layout, but the engineer calculates the beams, columns, connections and foundations. We arrange those calculations, or work from an engineer's design you already have, and make sure the details suit the builder's programme.

How much do rear extension steels cost in Coleraine?

As a guide, budget £2,150–£6,000 including VAT for opening into a rear extension in Coleraine, based on published UK cost guides adjusted for prices in Northern Ireland (-14%). The exact figure depends on the span, what the wall carries, access and the finish, and is fixed in writing once the scope is agreed.

Planning to take a wall out?

Book a free survey visit. You get an itemised written quote covering calculations, building control, steel and making good.