Steel BeamInstallers
Rear extension under construction with a steel beam over the opening into the house

Rear extension steels · Argyll and Bute

Rear extension steels in Argyll and Bute

Calculations, approvals, propping, steel and making good for rear extension steels across Argyll and Bute.

  • Survey, design and installation in one
  • Covering G84, PA20, PA21, PA22
  • Inspected before it is covered

Free survey in Argyll and Bute

Tell us about your rear extension steels project in Argyll and Bute.

Please enter your name.
Please enter a UK phone number.
Please enter a valid email.
Please enter a UK postcode.
Please tell us a little about the job.
  • Free survey visit
  • Engineer's calculations arranged
  • Building control handled
  • Fixed written price once scope is agreed
  • England, Wales, mainland Scotland & NI

About our rear extension steels service in Argyll and Bute

Rear extension steels are the beams, columns and frames that let the original back wall of a house be opened up into a new extension. Sized by a structural engineer, they pick up the floor, wall and roof loads that the old wall carried and pass them into bearings or foundations, so the new and old spaces join as one open room.

If you are planning rear extension steels in Argyll and Bute, the order of work matters as much as the steel: survey, calculations, approval, propping, installation, inspection and making good. That includes Lochgilphead, Campbeltown and Helensburgh, plus smaller towns and villages nearby. We run that sequence for you as one job with one point of contact.

Things to plan for

  • Opening the rear wall is usually the dustiest stage of an extension project. The work face is sheeted off from the rest of the house, and the kitchen is often out of use for a few days while the opening is formed and the steel goes in.
  • The opening is usually formed once the extension walls and roof are up, so the house stays secure and dry. Leaving it too late can hold up plastering and floor screeding, so the steel date is agreed with the builder early on.
  • Where the extension ceiling and the house ceiling should run through at one level, the steel may need setting higher into the floor zone or tying in with the extension roof structure. That choice changes the steel design, so it is settled before calculations.
  • Soil stacks, waste pipes, boiler flues and gas meters are often fixed to the back wall. These are moved before the wall opens, and any work on gas pipework must by law be carried out by a Gas Safe registered engineer.
  • During the opening, props stand both inside the house and within the extension footprint. Where props bear on a newly laid slab, the propping plan checks that the slab can take those point loads, using spreaders where needed.

What happens, step by step

  1. Look and measure

    We check the wall, the span you want and what the wall is carrying, and photograph anything the engineer needs to see.

  2. Design and price

    Calculations come back from the engineer and we confirm your fixed written price, line by line.

  3. Building warrant

    A building warrant is applied for from Argyll and Bute Council, and work starts only once the warrant has been granted.

  4. Fit, inspect, finish

    The work is propped and the steel installed and packed tight. After inspection the opening is boxed, plastered and left clean.

What do rear extension steels cost in Argyll and Bute?

As a guide, budget £2,300–£6,350 including VAT for opening into a rear extension in Argyll and Bute, based on published UK cost guides adjusted for prices in Scotland (-9%).

JobTypical guide rangeWhat it usually covers
Opening into a rear extension£2,300–£6,350Original rear wall removed with a beam or goalpost, approvals and propping, coordinated with the extension build
Steel goalpost frame£1,800–£5,450Two posts and a beam bolted as a frame, pad foundations, base plates and fitting
Steel column or post£460–£1,360 per columnColumn supplied and fitted with base and cap plates on a pad foundation
Rear wall opening for bi-fold or sliding doors£2,300–£6,350External wall opened up to about 5 m with steel, propping, cavity tray and making good (doors supplied separately)

Figures include our approximate regional adjustment for prices in Scotland (-9%) and are rounded. How these figures are worked out.

Approvals in Argyll and Bute

In Scotland, structural alterations need a building warrant under the Building (Scotland) Act 2003, and work must not start until the warrant is granted. For Argyll and Bute, warrants are handled by Argyll and Bute Council's building standards service. When the work is finished, a completion certificate is submitted and has to be accepted by the council.

There is no party wall notice system in Scotland. Instead, check your title deeds and, for flats, the tenement management scheme, and talk to neighbours early if the beam bears into a shared wall.

Building rules in Scotland

Rear extension steels by town

Questions about rear extension steels in Argyll and Bute

Can you work on older or listed homes in Argyll and Bute?

Yes. Older homes often have lime mortar, timber lintels or shallow footings, which the engineer allows for. Listed buildings need listed building consent for internal structural changes as well as building regulations approval, and that must be in place first.

How soon can rear extension steels start in Argyll and Bute?

Start dates depend on the engineer's calculations, the building warrant and any agreement needed with neighbours. We give you a realistic timetable after the survey and keep you updated as each approval comes through.

Who designs the steels for a rear extension?

A structural engineer. Your architect's drawings show the layout, but the engineer calculates the beams, columns, connections and foundations. We arrange those calculations, or work from an engineer's design you already have, and make sure the details suit the builder's programme.

Is the steel included in the extension's building regulations?

Yes. The steelwork is part of the extension, so the engineer's calculations go to building standards with the extension application and the steel is inspected before it is covered. The completion certificate issued for the extension then covers the structural work to the rear wall.

When does the back wall come out during an extension build?

Usually once the extension walls and roof are up and the new space is weathertight. That keeps the house secure and dry while the opening is formed. The steel goes in, building standards inspects it, and the builder then carries the floors and ceilings through.

What is a goalpost frame in an extension?

A goalpost frame is two steel columns with a beam across the top, bolted together and standing on their own foundations. It is used where the opening is so wide that little masonry is left to bear on, or where the existing corners cannot take the load. The engineer decides whether one is needed.

Do you cover Argyll and Bute for rear extension steels?

Yes. We carry out rear extension steels in Argyll and Bute. Book a free survey visit and we will check the wall, arrange the engineer's calculations and send an itemised written quote.

Planning to take a wall out?

Book a free survey visit. You get an itemised written quote covering calculations, building control, steel and making good.