Steel BeamInstallers
Rear extension under construction with a steel beam over the opening into the house

Rear extension steels · Bangor

Rear extension steels in Bangor, Ards and North Down

Rear extension steels in Bangor, Ards and North Down, from free survey to completion certificate.

  • Survey, design and installation in one
  • Covering LL57
  • Inspected before it is covered

Free survey in Bangor

Tell us about the rear extension steel job in Bangor, Ards and North Down.

Please enter your name.
Please enter a UK phone number.
Please enter a valid email.
Please enter a UK postcode.
Please tell us a little about the job.
  • Free survey visit
  • Engineer's calculations arranged
  • Building control handled
  • Fixed written price once scope is agreed
  • England, Wales, mainland Scotland & NI

Planning rear extension steels in Bangor, Ards and North Down

Our rear extension steels service in Bangor, Ards and North Down covers everything from the first visit to the completion paperwork. We also cover the surrounding towns and villages in Ards and North Down. Postcode districts we cover here include LL57.

We work alongside your builder or as the steel package within the wider build. We arrange the engineer's design, coordinate building control, prop and open the rear wall at the right stage of the programme, and fit and pack the steels so the extension can be finished around them.

Things to plan for

  • During the opening, props stand both inside the house and within the extension footprint. Where props bear on a newly laid slab, the propping plan checks that the slab can take those point loads, using spreaders where needed.
  • Where the extension ceiling and the house ceiling should run through at one level, the steel may need setting higher into the floor zone or tying in with the extension roof structure. That choice changes the steel design, so it is settled before calculations.
  • In older houses the rear wall may be solid brick in lime mortar, with timber lintels and shallow footings beneath. The engineer may ask for trial holes to see what the wall stands on before deciding where the steel will bear.
  • Columns carry concentrated loads, so each normally sits on a pad foundation designed by the engineer. Digging these inside an existing kitchen or through a solid concrete floor takes planning, especially where drains run close to the back wall.
  • The opening is usually formed once the extension walls and roof are up, so the house stays secure and dry. Leaving it too late can hold up plastering and floor screeding, so the steel date is agreed with the builder early on.

Four stages, one team

  1. Look and measure

    We check the wall, the span you want and what the wall is carrying, and photograph anything the engineer needs to see.

  2. Design and price

    Calculations come back from the engineer and we confirm your fixed written price, line by line.

  3. Building control

    A full plans application or building notice goes to Ards and North Down Borough Council under the Building Regulations (Northern Ireland) 2012 before work begins.

  4. Fit, inspect, finish

    The work is propped and the steel installed and packed tight. After inspection the opening is boxed, plastered and left clean.

Guide prices for rear extension steels in Bangor, Ards and North Down

As a guide, budget £2,150–£6,000 including VAT for opening into a rear extension in Bangor, Ards and North Down, based on published UK cost guides adjusted for prices in Northern Ireland (-14%).

JobTypical guide rangeWhat it usually covers
Opening into a rear extension£2,150–£6,000Original rear wall removed with a beam or goalpost, approvals and propping, coordinated with the extension build
Rear wall opening for bi-fold or sliding doors£2,150–£6,000External wall opened up to about 5 m with steel, propping, cavity tray and making good (doors supplied separately)
Steel column or post£430–£1,290 per columnColumn supplied and fitted with base and cap plates on a pad foundation

Figures include our approximate regional adjustment for prices in Northern Ireland (-14%) and are rounded. How these figures are worked out.

Building control and neighbours in Bangor, Ards and North Down

Removing a load-bearing wall in Northern Ireland needs building control approval from the council. Ards and North Down Borough Council covers Bangor, Ards and North Down. The engineer's calculations support the application, and a completion certificate is issued after the final inspection.

The Party Wall etc. Act does not extend to Northern Ireland. Shared walls are dealt with under your title and the general law, so we recommend agreeing access and the work with your neighbour before it starts.

Building rules in Northern Ireland

Rear extension steels near Bangor

Rear extension steels in Bangor, Ards and North Down: your questions

Can you work on older or listed homes in Bangor, Ards and North Down?

Yes. Older homes often have lime mortar, timber lintels or shallow footings, which the engineer allows for. Listed buildings need listed building consent for internal structural changes as well as building regulations approval, and that must be in place first.

Do you also work near Bangor, Ards and North Down?

Yes. We also cover nearby towns including Newtownards, Castlereagh and Lisburn.

When does the back wall come out during an extension build?

Usually once the extension walls and roof are up and the new space is weathertight. That keeps the house secure and dry while the opening is formed. The steel goes in, building control inspects it, and the builder then carries the floors and ceilings through.

Who designs the steels for a rear extension?

A structural engineer. Your architect's drawings show the layout, but the engineer calculates the beams, columns, connections and foundations. We arrange those calculations, or work from an engineer's design you already have, and make sure the details suit the builder's programme.

Will my kitchen be out of action while the rear wall is opened?

For a few days, usually. The kitchen often sits against the rear wall, so units, sinks or appliances near the opening may need disconnecting while the wall is propped and removed. The work area is sheeted off and the rest of the house stays in use.

Do I need a party wall agreement for rear extension steels in Bangor, Ards and North Down?

There is no Party Wall Act in Northern Ireland. Your title deeds and the general law apply instead, so agree the work with your neighbour in writing before it starts.

Planning to take a wall out?