Steel BeamInstallers
Rear extension under construction with a steel beam over the opening into the house

Rear extension steels · Angus

Rear extension steels in Angus

Calculations, approvals, propping, steel and making good for rear extension steels across Angus.

  • Price fixed in writing once scope is agreed
  • Building warrant arranged
  • Temporary works and making good included

Free survey in Angus

Tell us about your rear extension steels project in Angus.

Please enter your name.
Please enter a UK phone number.
Please enter a valid email.
Please enter a UK postcode.
Please tell us a little about the job.
  • Free survey visit
  • Engineer's calculations arranged
  • Building control handled
  • Fixed written price once scope is agreed
  • England, Wales, mainland Scotland & NI

What rear extension steels involve in Angus

Rear extension steels are the beams, columns and frames that let the original back wall of a house be opened up into a new extension. Sized by a structural engineer, they pick up the floor, wall and roof loads that the old wall carried and pass them into bearings or foundations, so the new and old spaces join as one open room.

Looking for rear extension steels in Angus? That includes Montrose, Carnoustie and Arbroath, plus smaller towns and villages nearby. Our teams handle the calculations, the building warrant, the propping and the steel itself, and leave the opening ready for plastering and decoration.

Worth knowing before you start

  • When bi-fold or sliding doors sit directly beneath the new steel, the beam has to stay stiff enough not to bind the door panels. The engineer sets a tighter deflection limit, which can mean a deeper or heavier section than strength alone would need.
  • A single beam works where solid masonry is left at both ends of the opening. Where the opening runs nearly the full width or the corners are weak, the engineer may use columns or a goalpost frame, which is two posts and a beam bolted together.
  • During the opening, props stand both inside the house and within the extension footprint. Where props bear on a newly laid slab, the propping plan checks that the slab can take those point loads, using spreaders where needed.
  • Two-storey rear extensions add a second level of loads to think about. Steels at first-floor level may carry the existing rear wall of the bedrooms or tie the new roof into the old one, so the engineer looks at both floors together.
  • The original rear wall of most houses is load-bearing because it supports first-floor joists and the bedroom wall above. Even where the joists run parallel to it, the masonry overhead still needs carrying, so steel is almost always part of opening it up.

How the job runs in Angus

  1. Survey in Angus

    We visit, look at the wall and what sits above it, measure the opening and note services, access and how the steel can be brought in.

  2. Engineer's design

    A structural engineer sizes the beam, padstones and any posts, and sets out the temporary support needed while the wall is out.

  3. Building warrant

    A building warrant is applied for from Angus Council, and work starts only once the warrant has been granted.

  4. Install and sign-off

    Props go in, the opening is formed, the steel is set and packed, building standards inspects it, and we make good.

Guide prices for rear extension steels in Angus

As a guide, budget £2,300–£6,350 including VAT for opening into a rear extension in Angus, based on published UK cost guides adjusted for prices in Scotland (-9%).

JobTypical guide rangeWhat it usually covers
Opening into a rear extension£2,300–£6,350Original rear wall removed with a beam or goalpost, approvals and propping, coordinated with the extension build
Rear wall opening for bi-fold or sliding doors£2,300–£6,350External wall opened up to about 5 m with steel, propping, cavity tray and making good (doors supplied separately)
Steel column or post£460–£1,360 per columnColumn supplied and fitted with base and cap plates on a pad foundation
Structural calculations for a beam£230–£680Site measure or photos, beam and padstone design and calculations for building standards

Figures include our approximate regional adjustment for prices in Scotland (-9%) and are rounded. How these figures are worked out.

Approvals in Angus

In Scotland, structural alterations need a building warrant under the Building (Scotland) Act 2003, and work must not start until the warrant is granted. For Angus, warrants are handled by Angus Council's building standards service. When the work is finished, a completion certificate is submitted and has to be accepted by the council.

Scotland has no Party Wall Act. Work affecting a shared wall is governed by your title deeds and the general law, and in flats by the Tenements (Scotland) Act 2004, so it is sensible to agree the work with neighbours in writing before starting.

Building rules in Scotland

Rear extension steels by town

Local questions answered

Can you work on older or listed homes in Angus?

Yes. Older homes often have lime mortar, timber lintels or shallow footings, which the engineer allows for. Listed buildings need listed building consent for internal structural changes as well as building regulations approval, and that must be in place first.

Do I need a party wall agreement for rear extension steels in Angus?

There is no Party Wall Act in Scotland. Your title deeds and the general law apply instead, and the Tenements (Scotland) Act 2004 for flats, so agree the work with your neighbour in writing before it starts.

How wide can a rear extension opening be?

There is no fixed limit, and openings across the full width of a house are common with the right steel. The engineer sizes the beam or frame for the span and the loads above. Wider spans need deeper or heavier steel and possibly columns, which affects headroom and cost.

Is the steel included in the extension's building regulations?

Yes. The steelwork is part of the extension, so the engineer's calculations go to building standards with the extension application and the steel is inspected before it is covered. The completion certificate issued for the extension then covers the structural work to the rear wall.

What is a goalpost frame in an extension?

A goalpost frame is two steel columns with a beam across the top, bolted together and standing on their own foundations. It is used where the opening is so wide that little masonry is left to bear on, or where the existing corners cannot take the load. The engineer decides whether one is needed.

When does the back wall come out during an extension build?

Usually once the extension walls and roof are up and the new space is weathertight. That keeps the house secure and dry while the opening is formed. The steel goes in, building standards inspects it, and the builder then carries the floors and ceilings through.

Planning to take a wall out?

Book a free survey visit. You get an itemised written quote covering calculations, building control, steel and making good.