Steel BeamInstallers
Plasterer seen from behind skimming a newly boxed beam

Plastering & making good · Wimbledon

Plastering & making good in Wimbledon

Plastering & making good for homes in CR4, KT3, SM4, designed by a structural engineer.

  • Itemised written quote
  • Beam sized by a structural engineer
  • Covering Wimbledon and nearby

Free survey in Wimbledon

Tell us about the plastering & making good job in Wimbledon.

Please enter your name.
Please enter a UK phone number.
Please enter a valid email.
Please enter a UK postcode.
Please tell us a little about the job.
  • Free survey visit
  • Engineer's calculations arranged
  • Building control handled
  • Fixed written price once scope is agreed
  • England, Wales, mainland Scotland & NI

Plastering & making good in Wimbledon: how it works

We cover plastering & making good in Wimbledon (CR4, KT3, SM4) and the streets around it. Our coverage runs across London, so nearby villages are included too. Each job is designed by a structural engineer and approved through local building control before work begins.

Structural work leaves a trail behind it: a steel beam to hide, ragged wall ends, a strip of missing floor, cracked ceiling where props stood and holes where needles passed through. However good the steel, this is the part you look at every day, so it deserves the same care as the structure.

Worth knowing before you start

  • Fire-rated plasterboard is used for boxing steel that needs fire protection, while standard or moisture-resistant board suits ordinary ceiling and wall repairs. Using the right board in each place avoids rework when building control inspects.
  • Metal angle beads on every outside corner of the boxing give crisp, straight lines and protect the edges from knocks. They are set true to the ceiling and walls, so a slightly out-of-level beam does not show once skimmed.
  • Hairline cracks sometimes appear along board joints or where new plaster meets old, as the building settles onto the steel and the plaster dries out. They are normal in the first months and are usually filled at the next redecoration.
  • New plaster is very absorbent, so the first coat of emulsion is normally thinned with water as a mist coat to seal it. Skipping this step is a frequent reason paint flakes off fresh plaster within weeks of decorating.
  • When a wall is removed, a strip of floor goes with it. On suspended timber floors the gap is joisted and boarded, and on solid floors it is filled and screeded. Either way, the infill must sit level so new flooring does not show a ridge.

Four stages, one team

  1. Free visit

    A short visit to Wimbledon to see the job, agree what you want and check the bearings, floors and services that affect the design.

  2. Calculations

    The engineer's calculations and a simple drawing are prepared for your opening and shared with you before anything is ordered.

  3. Building control

    We submit a building notice or full plans application to the local council's building control team, so approval is in place before the wall is touched.

  4. Steel in, made good

    On site we prop, open up, fit and pack the steel, then fire protect, box in and plaster once the inspection is done.

Guide prices for plastering & making good in Wimbledon

As a guide, budget £380–£1,540 including VAT for plastering and making good in Wimbledon, based on published UK cost guides adjusted for London prices (+28%).

JobTypical guide rangeWhat it usually covers
Plastering and making good£380–£1,540Boxing the beam, bead and skim, reveals, floor infill where the wall stood and tidy-up
Chimney breast removal (ground floor)£1,900–£3,850Ground-floor breast removed, steel to support the breast above, building control and making good
Load-bearing wall removal with steel beam£2,550–£6,400Typical internal wall up to about 4 m: calculations, building control, propping, steel, padstones, fitting, fire protection and making good
Fire protection to a steel beam£190–£770 per beamFire-rated board boxing or an intumescent coating system as specified

Figures include our approximate regional adjustment for London prices (+28%) and are rounded. How these figures are worked out.

Building control and neighbours in Wimbledon

In England, taking out a load-bearing wall or putting in a beam is building work under the Building Regulations 2010. It needs approval from building control, either the local council's building control team or a registered building control approver, through a full plans application or a building notice. Part A covers the structure and Part B covers fire safety, which is why steel in homes is usually fire protected.

If the beam bears into a wall you share with a neighbour, the Party Wall etc. Act 1996 applies, and a party structure notice must be served at least two months before that work starts. We arrange this through a party wall surveyor.

Building rules in England

Plastering & making good near Wimbledon

Questions about plastering & making good in Wimbledon

Who approves plastering & making good in Wimbledon?

Structural work in Wimbledon needs a building notice or full plans application to the local council's building control team or a registered building control approver. We prepare and submit it with the structural engineer's calculations and arrange the inspections, so the completion paperwork follows the job.

Do you cover Wimbledon for plastering & making good?

Yes. We carry out plastering & making good in Wimbledon and the CR4, KT3, SM4, SW15 and SW17 postcode districts. Book a free survey visit and we will check the wall, arrange the engineer's calculations and send an itemised written quote.

Can you repair a lath and plaster ceiling?

Yes. Small areas can be patched with lath and lime-based plaster, or with board cut in and skimmed to match. Where large areas have sagged or pulled away from the laths, overboarding or replacing the ceiling is often the sounder repair. We assess the condition at the survey and price the right approach.

How long after a knock-through can I decorate?

Once the new plaster has dried right through, which for a thin skim in a warm, ventilated room is often a few days to a week. Deeper repairs and backing coats take longer. Plaster turns from dark to an even pale colour when it is dry, and painting before then risks poor adhesion.

What happens to the floor where the wall was removed?

The gap left by the wall is filled to match the floor on either side. Suspended timber floors get new joists and boards, solid floors are filled and screeded, and the infill is levelled so carpet, laminate or tiles can run straight across the room without a visible ridge.

Planning to take a wall out?

Book a free survey visit. You get an itemised written quote covering calculations, building control, steel and making good.