Steel BeamInstallers
Plasterer seen from behind skimming a newly boxed beam

Plastering & making good · Welling

Plastering & making good in Welling

Plastering & making good for homes in DA5, DA6, DA7, designed by a structural engineer.

  • Price fixed in writing once scope is agreed
  • Building control arranged
  • Temporary works and making good included

Free survey in Welling

Tell us about the plastering & making good job in Welling.

Please enter your name.
Please enter a UK phone number.
Please enter a valid email.
Please enter a UK postcode.
Please tell us a little about the job.
  • Free survey visit
  • Engineer's calculations arranged
  • Building control handled
  • Fixed written price once scope is agreed
  • England, Wales, mainland Scotland & NI

Plastering & making good in Welling: how it works

We carry out plastering & making good in Welling, covering the DA5, DA6, DA7, DA15 and DA16 postcode districts. Our coverage runs across London, so nearby villages are included too. The job starts with a free survey visit so the engineer's calculations are based on your actual walls, floors and loads.

Structural work leaves a trail behind it: a steel beam to hide, ragged wall ends, a strip of missing floor, cracked ceiling where props stood and holes where needles passed through. However good the steel, this is the part you look at every day, so it deserves the same care as the structure.

Worth knowing before you start

  • Fire-rated plasterboard is used for boxing steel that needs fire protection, while standard or moisture-resistant board suits ordinary ceiling and wall repairs. Using the right board in each place avoids rework when building control inspects.
  • Metal angle beads on every outside corner of the boxing give crisp, straight lines and protect the edges from knocks. They are set true to the ceiling and walls, so a slightly out-of-level beam does not show once skimmed.
  • Textured ceiling coatings applied before 2000 can contain asbestos. Before a textured ceiling is cut, scraped or sanded, a sample is tested or an asbestos survey of the area is arranged, and the finish is only disturbed once the result is known.
  • Making good is the last chance to route cables neatly before surfaces close up. Sockets, switches and lights moved for the new layout are first-fixed before boarding, and pipes crossing the old wall line can run within the floor infill.
  • Victorian and Edwardian ceilings are often lath and lime plaster, which can sag or come away when nearby work shakes it. Small areas can be patched to match, while larger damaged areas are usually overboarded or replaced for a sound result.

Four stages, one team

  1. Free visit

    A short visit to Welling to see the job, agree what you want and check the bearings, floors and services that affect the design.

  2. Calculations

    The engineer's calculations and a simple drawing are prepared for your opening and shared with you before anything is ordered.

  3. Building control

    We submit a building notice or full plans application to the local council's building control team, so approval is in place before the wall is touched.

  4. Steel in, made good

    On site we prop, open up, fit and pack the steel, then fire protect, box in and plaster once the inspection is done.

How much should I budget in Welling?

As a guide, budget £380–£1,540 including VAT for plastering and making good in Welling, based on published UK cost guides adjusted for London prices (+28%).

JobTypical guide rangeWhat it usually covers
Plastering and making good£380–£1,540Boxing the beam, bead and skim, reveals, floor infill where the wall stood and tidy-up
Fire protection to a steel beam£190–£770 per beamFire-rated board boxing or an intumescent coating system as specified
Load-bearing wall removal with steel beam£2,550–£6,400Typical internal wall up to about 4 m: calculations, building control, propping, steel, padstones, fitting, fire protection and making good
Through-lounge knock-through£3,200–£7,050Wall between front and back reception rooms, steel beam, approvals, plastering and floor infill

Figures include our approximate regional adjustment for London prices (+28%) and are rounded. How these figures are worked out.

Approvals in Welling

In England, taking out a load-bearing wall or putting in a beam is building work under the Building Regulations 2010. It needs approval from building control, either the local council's building control team or a registered building control approver, through a full plans application or a building notice. Part A covers the structure and Part B covers fire safety, which is why steel in homes is usually fire protected.

Terraced and semi-detached homes often need party wall notices, because cutting into a shared wall to take a beam end is notifiable under the Party Wall etc. Act 1996. Allow at least two months for the notice period unless your neighbour agrees sooner.

Building rules in England

Plastering & making good near Welling

Plastering & making good in Welling: your questions

Do I need a party wall agreement for plastering & making good in Welling?

Yes, if the beam bears into a shared wall: the Party Wall etc. Act 1996 applies in England and Wales, and a party structure notice must be served at least two months before that work starts. We arrange it through a party wall surveyor.

Do you cover Welling for plastering & making good?

Yes. We carry out plastering & making good in Welling and the DA5, DA6, DA7, DA15 and DA16 postcode districts. Book a free survey visit and we will check the wall, arrange the engineer's calculations and send an itemised written quote.

Can you repair a lath and plaster ceiling?

Yes. Small areas can be patched with lath and lime-based plaster, or with board cut in and skimmed to match. Where large areas have sagged or pulled away from the laths, overboarding or replacing the ceiling is often the sounder repair. We assess the condition at the survey and price the right approach.

Is plastering included when a load-bearing wall is removed?

Yes, on our structural jobs making good is priced as part of the work and itemised on the written quote, so you can see exactly what is included. If another firm is doing the steelwork, check their quote closely, as some stop at the beam and leave plastering, floor infill and skirting for you to arrange.

Do I need building control approval for plastering?

Not for plastering on its own. However, where it covers new structural steel, building control usually needs to inspect the beam and its fire protection before it is boxed in and skimmed. That is why, on structural jobs, the making good is timed around the building control visit.

Planning to take a wall out?

Book a free survey visit. You get an itemised written quote covering calculations, building control, steel and making good.