Steel BeamInstallers
Plasterer seen from behind skimming a newly boxed beam

Plastering & making good · Croydon

Plastering & making good in Croydon

Plastering & making good in Croydon, from free survey to completion certificate.

  • Itemised written quote
  • Beam sized by a structural engineer
  • Covering Croydon and nearby

Free survey in Croydon

Tell us about the plastering & making good job in Croydon.

Please enter your name.
Please enter a UK phone number.
Please enter a valid email.
Please enter a UK postcode.
Please tell us a little about the job.
  • Free survey visit
  • Engineer's calculations arranged
  • Building control handled
  • Fixed written price once scope is agreed
  • England, Wales, mainland Scotland & NI

About our plastering & making good service in Croydon

Our plastering & making good service in Croydon covers everything from the first visit to the completion paperwork. We also cover the surrounding towns and villages in London. Postcode districts we cover here include CR0, CR2, CR7, CR9 and SE19.

We make good as the final stage of our structural jobs, and can quote it separately where another firm has fitted the steel. It covers boxing and fire boarding, plastering and skimming, floor infills and skirting, leaving smooth, dry surfaces for your decorator.

Worth knowing before you start

  • When a wall is removed, a strip of floor goes with it. On suspended timber floors the gap is joisted and boarded, and on solid floors it is filled and screeded. Either way, the infill must sit level so new flooring does not show a ridge.
  • Hairline cracks sometimes appear along board joints or where new plaster meets old, as the building settles onto the steel and the plaster dries out. They are normal in the first months and are usually filled at the next redecoration.
  • Fresh plaster has to dry before it is painted. A thin skim over board in a warm, ventilated room often dries within a few days to a week, while backing coats and deeper repairs take longer. Painting too soon can cause peeling and patchy colour.
  • Victorian and Edwardian ceilings are often lath and lime plaster, which can sag or come away when nearby work shakes it. Small areas can be patched to match, while larger damaged areas are usually overboarded or replaced for a sound result.
  • Fire-rated plasterboard is used for boxing steel that needs fire protection, while standard or moisture-resistant board suits ordinary ceiling and wall repairs. Using the right board in each place avoids rework when building control inspects.

What happens, step by step

  1. Survey in Croydon

    We visit, look at the wall and what sits above it, measure the opening and note services, access and how the steel can be brought in.

  2. Engineer's design

    A structural engineer sizes the beam, padstones and any posts, and sets out the temporary support needed while the wall is out.

  3. Building control

    We submit a building notice or full plans application to the local council's building control team, so approval is in place before the wall is touched.

  4. Install and sign-off

    Props go in, the opening is formed, the steel is set and packed, building control inspects it, and we make good.

What does plastering & making good cost in Croydon?

As a guide, budget £380–£1,540 including VAT for plastering and making good in Croydon, based on published UK cost guides adjusted for London prices (+28%).

JobTypical guide rangeWhat it usually covers
Plastering and making good£380–£1,540Boxing the beam, bead and skim, reveals, floor infill where the wall stood and tidy-up
Kitchen-diner knock-through£3,200–£7,700Internal structural wall between kitchen and dining room, steel beam, approvals and making good (kitchen fitting extra)
Chimney breast removal (ground floor)£1,900–£3,850Ground-floor breast removed, steel to support the breast above, building control and making good
Fire protection to a steel beam£190–£770 per beamFire-rated board boxing or an intumescent coating system as specified

Figures include our approximate regional adjustment for London prices (+28%) and are rounded. How these figures are worked out.

Approvals in Croydon

Structural openings in English homes need building regulations approval before work starts. The local council's building control team can deal with it, or you can use a registered building control approver. Either way the steel is inspected before it is covered, and a completion certificate is issued at the end. Keep it safe for when you sell.

If the beam bears into a wall you share with a neighbour, the Party Wall etc. Act 1996 applies, and a party structure notice must be served at least two months before that work starts. We arrange this through a party wall surveyor.

Building rules in England

Plastering & making good near Croydon

Local questions answered

Can you work on older or listed homes in Croydon?

Yes. Older homes often have lime mortar, timber lintels or shallow footings, which the engineer allows for. Listed buildings need listed building consent for internal structural changes as well as building regulations approval, and that must be in place first.

Can I stay at home while the work is done in Croydon?

Usually, yes. The work area is screened and floors are protected. The rooms either side of the opening are out of action for a few days, and there is some noise and dust while the masonry comes out.

Do you decorate after making good?

Not usually. Making good leaves surfaces skimmed, dry and ready for paint, with trims refitted, and decoration is normally left to you or your decorator so you can choose colours and finishes yourself. Whoever paints should start with a thinned mist coat on the new plaster before the main coats.

Will cracks appear after plastering?

Small hairline cracks can appear in the first months as the plaster dries and the building settles onto the new steel. They are cosmetic and normal, and are usually filled when you next repaint. Wide or growing cracks are different and should be reported, as they can point to movement that needs checking.

How long after a knock-through can I decorate?

Once the new plaster has dried right through, which for a thin skim in a warm, ventilated room is often a few days to a week. Deeper repairs and backing coats take longer. Plaster turns from dark to an even pale colour when it is dry, and painting before then risks poor adhesion.

Planning to take a wall out?

Book a free survey visit. You get an itemised written quote covering calculations, building control, steel and making good.