Steel BeamInstallers
Steel beam half boxed in pink fire-rated plasterboard

Fire protection for steel beams · Northamptonshire

Fire protection for steel beams in Northamptonshire

Fire protection for steel beams across Northamptonshire, designed by a structural engineer and signed off by building control.

  • Price fixed in writing once scope is agreed
  • Building control arranged
  • Temporary works and making good included

Free survey in Northamptonshire

Tell us about your fire protection for steel beams project in Northamptonshire.

Please enter your name.
Please enter a UK phone number.
Please enter a valid email.
Please enter a UK postcode.
Please tell us a little about the job.
  • Free survey visit
  • Engineer's calculations arranged
  • Building control handled
  • Fixed written price once scope is agreed
  • England, Wales, mainland Scotland & NI

What fire protection for steel beams involves in Northamptonshire

Fire protection for steel beams is the layer of fire-rated board or intumescent coating applied to structural steel so it keeps its strength long enough in a fire for people to get out. Steel softens as it heats, so building regulations set a period of fire resistance for beams and columns, and the protection is chosen and applied to meet that period.

From the first survey visit to the completion certificate, we take care of fire protection for steel beams across Northamptonshire. We can survey in places such as Wellingborough, Daventry and Kettering and the villages around them. The engineer sizes the steel, we deal with building control, and our team fits and packs the beam before making good.

Key points for your project

  • Boxing a single beam usually takes around a day, plus skimming and drying. Intumescent coatings need each coat to dry before the next goes on, so they can take several days depending on the thickness required and the room temperature.
  • Building control treats fire protection as part of the structural approval, not an optional extra. If unprotected steel is found at inspection, the completion certificate is normally held back until the protection is in place and has been checked.
  • Fire-rated plasterboard is denser than standard board and contains additives that slow the passage of heat. It usually has a pink or red face, and the number of layers and fixing pattern come from the system specification rather than being decided on site.
  • Intumescent paint looks like an ordinary coating but swells into a thick insulating char when heated. How well it performs depends on the dry film thickness, which varies with the steel section and fire period, so it is applied to a written specification.
  • Exposed steel is popular in open-plan kitchens and loft spaces. An intumescent system can take a decorative top coat in most colours, although up close the finish has a slightly textured look compared with steel painted in a factory.

Four stages, one team

  1. Survey in Northamptonshire

    We visit, look at the wall and what sits above it, measure the opening and note services, access and how the steel can be brought in.

  2. Engineer's design

    A structural engineer sizes the beam, padstones and any posts, and sets out the temporary support needed while the wall is out.

  3. Building control

    We submit a building notice or full plans application to the local council's building control team, so approval is in place before the wall is touched.

  4. Install and sign-off

    Props go in, the opening is formed, the steel is set and packed, building control inspects it, and we make good.

What does fire protection for steel beams cost in Northamptonshire?

As a guide, budget £150–£590 per beam including VAT for fire protection to a steel beam in Northamptonshire, based on published UK cost guides adjusted for prices in the East Midlands (-2%).

JobTypical guide rangeWhat it usually covers
Fire protection to a steel beam£150–£590 per beamFire-rated board boxing or an intumescent coating system as specified
Structural calculations for a beam£240–£740Site measure or photos, beam and padstone design and calculations for building control
Steel beam replacement£1,950–£5,400Propping, removing the failed beam, new steel on proper bearings, approval and making good
RSJ supply and fit (single beam)£780–£2,450 per beamBeam supplied, delivered, lifted and packed on padstones, with propping (calculations and approval priced separately)

Figures include our approximate regional adjustment for prices in the East Midlands (-2%) and are rounded. How these figures are worked out.

Building control and neighbours in Northamptonshire

For Northamptonshire, building control is provided by the local council's building control team, or by a registered building control approver if preferred. We send them the engineer's calculations with a building notice or full plans application and book the inspections. Work done without approval can cause problems at sale and is far dearer to put right later.

If the beam bears into a wall you share with a neighbour, the Party Wall etc. Act 1996 applies, and a party structure notice must be served at least two months before that work starts. We arrange this through a party wall surveyor.

Building rules in England

Fire protection for steel beams by town

Fire protection for steel beams in Northamptonshire: your questions

Can I stay at home while the work is done in Northamptonshire?

Usually, yes. The work area is screened and floors are protected. The rooms either side of the opening are out of action for a few days, and there is some noise and dust while the masonry comes out.

Who approves fire protection for steel beams in Northamptonshire?

Structural work in Northamptonshire needs a building notice or full plans application to the local council's building control team or a registered building control approver. We prepare and submit it with the structural engineer's calculations and arrange the inspections, so the completion paperwork follows the job.

Can I put downlights in a boxed-in steel beam?

Only with planning. Cutting holes in fire boarding can weaken its protection, so any lights in or near the boxing need to be designed in, using fire-rated fittings or suitable fire-stopping where the board is pierced. It is far easier to sort this out before the boxing goes up than to adapt it afterwards.

Does a steel column need fire protection as well as the beam?

Usually, if the column is part of the load path. A column carrying a beam is just as important in a fire, so it normally needs the same fire resistance. Columns are often boxed with board or coated with intumescent paint, and the engineer's design and building control confirm what applies to yours.

How thick does intumescent paint need to be on a steel beam?

There is no single figure. The thickness depends on the steel section, how many sides are exposed and the fire period required, and the coating manufacturer's data sets the dry film thickness for each case. The applied thickness is measured with a gauge once the coats have dried and recorded for building control.

How long does intumescent paint take to apply?

Several days in most cases. Each coat has to dry before the next is applied, and the number of coats depends on the thickness needed. Cold or damp rooms slow drying, so the space is kept warm and ventilated, and the top coat goes on once the full build has been measured.

Which towns in Northamptonshire do you cover?

We cover towns including Northampton, Corby, Kettering and Wellingborough, plus the villages and smaller towns around them.

Planning to take a wall out?

Book a free survey visit. You get an itemised written quote covering calculations, building control, steel and making good.