
Fire protection for steel beams · Leicestershire
Fire protection for steel beams in Leicestershire
Calculations, approvals, propping, steel and making good for fire protection for steel beams across Leicestershire.
- Survey, design and installation in one
- Covering CV13, DE74, LE1, LE10
- Inspected before it is covered
- Free survey visit
- Engineer's calculations arranged
- Building control handled
- Fixed written price once scope is agreed
- England, Wales, mainland Scotland & NI
Fire protection for steel beams in Leicestershire: how it works
Fire protection for steel beams is the layer of fire-rated board or intumescent coating applied to structural steel so it keeps its strength long enough in a fire for people to get out. Steel softens as it heats, so building regulations set a period of fire resistance for beams and columns, and the protection is chosen and applied to meet that period.
Fire protection for steel beams is one of the most common structural jobs in homes across Leicestershire. Towns we cover include Wigston Magna, Loughborough and Melton Mowbray, among other places in the area. Every job starts with a survey visit, then calculations from a structural engineer, so the steel suits the house in front of us rather than a rule of thumb.
Worth knowing before you start
- Boxing a single beam usually takes around a day, plus skimming and drying. Intumescent coatings need each coat to dry before the next goes on, so they can take several days depending on the thickness required and the room temperature.
- Fire-rated plasterboard is denser than standard board and contains additives that slow the passage of heat. It usually has a pink or red face, and the number of layers and fixing pattern come from the system specification rather than being decided on site.
- Boxing is generally the lower-cost route for steel that will be hidden. Intumescent coatings cost more because of the product and the number of coats, and the price rises with the fire period and the size of the section.
- Exposed steel is popular in open-plan kitchens and loft spaces. An intumescent system can take a decorative top coat in most colours, although up close the finish has a slightly textured look compared with steel painted in a factory.
- Keep a record of what was fitted: the board type and number of layers, or the coating product, thickness readings and number of coats. Building control may ask for it, and it helps answer queries when the house is sold.
From survey to sign-off in Leicestershire
Survey in Leicestershire
We visit, look at the wall and what sits above it, measure the opening and note services, access and how the steel can be brought in.
Engineer's design
A structural engineer sizes the beam, padstones and any posts, and sets out the temporary support needed while the wall is out.
Building control
We submit a building notice or full plans application to the local council's building control team, so approval is in place before the wall is touched.
Install and sign-off
Props go in, the opening is formed, the steel is set and packed, building control inspects it, and we make good.
How much should I budget in Leicestershire?
As a guide, budget £150–£590 per beam including VAT for fire protection to a steel beam in Leicestershire, based on published UK cost guides adjusted for prices in the East Midlands (-2%).
| Job | Typical guide range | What it usually covers |
|---|---|---|
| Fire protection to a steel beam | £150–£590 per beam | Fire-rated board boxing or an intumescent coating system as specified |
| Building control fees | £240–£640 | Building notice or full plans fee and inspections; varies by council or approver |
| Steel beam replacement | £1,950–£5,400 | Propping, removing the failed beam, new steel on proper bearings, approval and making good |
| RSJ supply and fit (single beam) | £780–£2,450 per beam | Beam supplied, delivered, lifted and packed on padstones, with propping (calculations and approval priced separately) |
Figures include our approximate regional adjustment for prices in the East Midlands (-2%) and are rounded. How these figures are worked out.
Building control and neighbours in Leicestershire
For Leicestershire, building control is provided by the local council's building control team, or by a registered building control approver if preferred. We send them the engineer's calculations with a building notice or full plans application and book the inspections. Work done without approval can cause problems at sale and is far dearer to put right later.
If the beam bears into a wall you share with a neighbour, the Party Wall etc. Act 1996 applies, and a party structure notice must be served at least two months before that work starts. We arrange this through a party wall surveyor.
Fire protection for steel beams by town
Fire protection for steel beams in Leicestershire: your questions
Which towns in Leicestershire do you cover?
We cover towns including Leicester, Loughborough, Hinckley and Coalville, plus the villages and smaller towns around them.
What happens at the survey visit in Leicestershire?
We look at the wall, the floor and ceiling either side and what sits above, measure the opening you want, and note cables, pipes and access for the steel. It usually takes under an hour and there is no charge.
Does a steel column need fire protection as well as the beam?
Usually, if the column is part of the load path. A column carrying a beam is just as important in a fire, so it normally needs the same fire resistance. Columns are often boxed with board or coated with intumescent paint, and the engineer's design and building control confirm what applies to yours.
How thick does intumescent paint need to be on a steel beam?
There is no single figure. The thickness depends on the steel section, how many sides are exposed and the fire period required, and the coating manufacturer's data sets the dry film thickness for each case. The applied thickness is measured with a gauge once the coats have dried and recorded for building control.
My steel beam was fitted years ago without fire protection. What should I do?
Have it looked at and protected to current requirements. Unprotected steel can raise questions when you sell, and if the original work was never approved, a regularisation application to building control may be needed in England and Wales. We can survey the steel and price both the protection and the paperwork route.
Is boxing in a steel beam cheaper than intumescent paint?
Usually, yes. Boxing with fire-rated plasterboard tends to cost less for steel that will be hidden. Intumescent coatings generally cost more because of the product and the number of coats needed, but they let the beam stay visible. Where either method would work, both can be priced on the itemised quote so you can compare.
How soon can fire protection for steel beams start in Leicestershire?
Start dates depend on the engineer's calculations, the building control approval and, where needed, party wall notice periods. We give you a realistic timetable after the survey and keep you updated as each approval comes through.