Steel BeamInstallers
Steel beam half boxed in pink fire-rated plasterboard

Fire protection for steel beams · Salford

Fire protection for steel beams in Salford

Steelwork, approvals and making good for fire protection for steel beams in Salford and nearby.

  • Survey, design and installation in one
  • Covering M3, M5, M6
  • Inspected before it is covered

Free survey in Salford

Tell us about the fire protection for steel beams job in Salford.

Please enter your name.
Please enter a UK phone number.
Please enter a valid email.
Please enter a UK postcode.
Please tell us a little about the job.
  • Free survey visit
  • Engineer's calculations arranged
  • Building control handled
  • Fixed written price once scope is agreed
  • England, Wales, mainland Scotland & NI

Planning fire protection for steel beams in Salford

Fire protection for steel beams in Salford is planned around the house, not a standard kit. It sits about 2.2 miles from Manchester, which we also cover. We visit, measure and check what the wall carries, then arrange calculations and building control approval before any steel is ordered.

A bare steel beam is strong at room temperature but loses much of its load-carrying capacity once it gets hot enough in a fire. If that beam holds up a floor or the walls above, it matters to everyone in the building. Fire protection slows the rate at which the steel heats up, buying time for people to get out safely.

Things to plan for

  • A common fault is applying intumescent paint over the wrong primer, or over one of unknown type. The products must be compatible, so where steel was primed long ago the primer is identified or the surface is cleaned back before coating.
  • Boarding is fairly clean work, but coatings need a clean, dry and well-ventilated room at a suitable temperature. Dust from other trades can spoil the surface, so painting is normally scheduled once the messy work in that room is finished.
  • Keep a record of what was fitted: the board type and number of layers, or the coating product, thickness readings and number of coats. Building control may ask for it, and it helps answer queries when the house is sold.
  • Boxing a single beam usually takes around a day, plus skimming and drying. Intumescent coatings need each coat to dry before the next goes on, so they can take several days depending on the thickness required and the room temperature.
  • Fire boarding should not be cut into casually later on. Downlights, cables and pipes pushed through the boxing can weaken it, so services are planned before boarding, and any openings are sealed with suitable fire-stopping materials.

How the job runs in Salford

  1. Look and measure

    We check the wall, the span you want and what the wall is carrying, and photograph anything the engineer needs to see.

  2. Design and price

    Calculations come back from the engineer and we confirm your fixed written price, line by line.

  3. Building control

    We submit a building notice or full plans application to Salford City Council, so approval is in place before the wall is touched.

  4. Fit, inspect, finish

    The work is propped and the steel installed and packed tight. After inspection the opening is boxed, plastered and left clean.

Guide prices for fire protection for steel beams in Salford

As a guide, budget £140–£580 per beam including VAT for fire protection to a steel beam in Salford, based on published UK cost guides adjusted for prices in the North West (-4%).

JobTypical guide rangeWhat it usually covers
Fire protection to a steel beam£140–£580 per beamFire-rated board boxing or an intumescent coating system as specified
Structural calculations for a beam£240–£720Site measure or photos, beam and padstone design and calculations for building control
Plastering and making good£290–£1,150Boxing the beam, bead and skim, reveals, floor infill where the wall stood and tidy-up
RSJ supply and fit (single beam)£770–£2,400 per beamBeam supplied, delivered, lifted and packed on padstones, with propping (calculations and approval priced separately)

Figures include our approximate regional adjustment for prices in the North West (-4%) and are rounded. How these figures are worked out.

Building rules for Salford

In England, taking out a load-bearing wall or putting in a beam is building work under the Building Regulations 2010. It needs approval from building control, either Salford City Council or a registered building control approver, through a full plans application or a building notice. Part A covers the structure and Part B covers fire safety, which is why steel in homes is usually fire protected.

Terraced and semi-detached homes often need party wall notices, because cutting into a shared wall to take a beam end is notifiable under the Party Wall etc. Act 1996. Allow at least two months for the notice period unless your neighbour agrees sooner.

Building rules in England

Fire protection for steel beams near Salford

Local questions answered

Do I need a party wall agreement for fire protection for steel beams in Salford?

Yes, if the beam bears into a shared wall: the Party Wall etc. Act 1996 applies in England and Wales, and a party structure notice must be served at least two months before that work starts. We arrange it through a party wall surveyor.

Can you work on older or listed homes in Salford?

Yes. Older homes often have lime mortar, timber lintels or shallow footings, which the engineer allows for. Listed buildings need listed building consent for internal structural changes as well as building regulations approval, and that must be in place first.

Can I put downlights in a boxed-in steel beam?

Only with planning. Cutting holes in fire boarding can weaken its protection, so any lights in or near the boxing need to be designed in, using fire-rated fittings or suitable fire-stopping where the board is pierced. It is far easier to sort this out before the boxing goes up than to adapt it afterwards.

How long does intumescent paint take to apply?

Several days in most cases. Each coat has to dry before the next is applied, and the number of coats depends on the thickness needed. Cold or damp rooms slow drying, so the space is kept warm and ventilated, and the top coat goes on once the full build has been measured.

Is boxing in a steel beam cheaper than intumescent paint?

Usually, yes. Boxing with fire-rated plasterboard tends to cost less for steel that will be hidden. Intumescent coatings generally cost more because of the product and the number of coats needed, but they let the beam stay visible. Where either method would work, both can be priced on the itemised quote so you can compare.

Can I stay at home while the work is done in Salford?

Usually, yes. The work area is screened and floors are protected. The rooms either side of the opening are out of action for a few days, and there is some noise and dust while the masonry comes out.

Planning to take a wall out?

Book a free survey visit. You get an itemised written quote covering calculations, building control, steel and making good.