Steel BeamInstallers
Ground-floor chimney breast removed with a short steel beam carrying the breast above

Chimney breast removal · Shirley

Chimney breast removal in Shirley

Chimney breast removal in Shirley, from free survey to completion certificate.

  • Price fixed in writing once scope is agreed
  • Building control arranged
  • Temporary works and making good included

Free survey in Shirley

Tell us about the chimney breast removal job in Shirley.

Please enter your name.
Please enter a UK phone number.
Please enter a valid email.
Please enter a UK postcode.
Please tell us a little about the job.
  • Free survey visit
  • Engineer's calculations arranged
  • Building control handled
  • Fixed written price once scope is agreed
  • England, Wales, mainland Scotland & NI

About our chimney breast removal service in Shirley

We carry out chimney breast removal in Shirley, covering the B90, B91 and B92 postcode districts. We also work in nearby Solihull, roughly 1.6 miles away. The job starts with a free survey visit so the engineer's calculations are based on your actual walls, floors and loads.

Chimney breasts take up a surprising amount of room, especially in the kitchens and bedrooms of older terraces and semis. Removing one is common, but it is structural work: the breast usually continues upstairs and up through the roof, and in terraces the stack is often shared with the house next door.

Key points for your project

  • Older fireplaces sometimes contain asbestos in flue linings, fire surrounds, hearth boards or heat-resistant panels. In buildings from before 2000, suspect materials are identified with a survey before removal so they can be handled correctly.
  • Removing only the ground-floor breast leaves the upper breast and stack in place, so they must be supported. Taking the breast out on every floor and removing the stack above the roof avoids that load entirely, but involves roofing work and more disruption.
  • In terraces and semis the chimney stack usually serves both houses, with flues from each side rising together. You can generally only alter your own side, and the work must not weaken your neighbour's breast or flues, which is why party wall procedures often apply.
  • Once the breast is gone, the wall behind it is often rough, sooty or uneven. It is cleaned back, dubbed out where needed and plastered flat, and the floor where the hearth sat is filled level to meet the surrounding boards or screed.
  • In England and Wales, cutting away a chimney breast attached to a party wall is notifiable work under the Party Wall etc. Act 1996. Notice must be served on the neighbour before work begins, and their response decides whether party wall surveyors need to be appointed.

Four stages, one team

  1. Survey in Shirley

    We visit, look at the wall and what sits above it, measure the opening and note services, access and how the steel can be brought in.

  2. Engineer's design

    A structural engineer sizes the beam, padstones and any posts, and sets out the temporary support needed while the wall is out.

  3. Building control

    We submit a building notice or full plans application to Solihull Council, so approval is in place before the wall is touched.

  4. Install and sign-off

    Props go in, the opening is formed, the steel is set and packed, building control inspects it, and we make good.

What does chimney breast removal cost in Shirley?

As a guide, budget £1,500–£3,000 including VAT for chimney breast removal (ground floor) in Shirley, based on published UK cost guides adjusted for prices in the West Midlands (no adjustment).

JobTypical guide rangeWhat it usually covers
Chimney breast removal (ground floor)£1,500–£3,000Ground-floor breast removed, steel to support the breast above, building control and making good
Plastering and making good£300–£1,200Boxing the beam, bead and skim, reveals, floor infill where the wall stood and tidy-up
Loft conversion steels£2,500–£6,000Supply and fit of floor and ridge steels on padstones, including lifting into the roof space
Load-bearing wall removal with steel beam£2,000–£5,000Typical internal wall up to about 4 m: calculations, building control, propping, steel, padstones, fitting, fire protection and making good

Figures include our approximate regional adjustment for prices in the West Midlands (no adjustment) and are rounded. How these figures are worked out.

Building control and neighbours in Shirley

In England, taking out a load-bearing wall or putting in a beam is building work under the Building Regulations 2010. It needs approval from building control, either Solihull Council or a registered building control approver, through a full plans application or a building notice. Part A covers the structure and Part B covers fire safety, which is why steel in homes is usually fire protected.

If the beam bears into a wall you share with a neighbour, the Party Wall etc. Act 1996 applies, and a party structure notice must be served at least two months before that work starts. We arrange this through a party wall surveyor.

Building rules in England

Chimney breast removal near Shirley

Questions about chimney breast removal in Shirley

Do you cover Shirley for chimney breast removal?

Yes. We carry out chimney breast removal in Shirley and the B90, B91 and B92 postcode districts. Book a free survey visit and we will check the wall, arrange the engineer's calculations and send an itemised written quote.

What happens at the survey visit in Shirley?

We look at the wall, the floor and ceiling either side and what sits above, measure the opening you want, and note cables, pipes and access for the steel. It usually takes under an hour and there is no charge.

What is included in a chimney breast removal quote?

The itemised written quote covers the survey, engineer's calculations, building control, any party wall notices, temporary support, the steel or other support specified, removal and waste, venting or capping, and plastering and floor making good. Scaffolding and roof work appear as separate lines where the stack is involved, and the price is fixed in writing once the scope is agreed.

Can I remove a chimney breast downstairs and keep the fireplace upstairs?

Usually, as long as the upstairs breast and its flue stay intact and are carried on a support the engineer designs for that load. Building control must approve the arrangement. If the upstairs fireplace has a gas fire, any work on it or its supply must be carried out by a Gas Safe registered engineer.

Do I need building regulations to remove a chimney breast?

Yes. Removing all or part of a chimney breast is structural work. In England it needs building regulations approval through a full plans application or building notice, and in Wales an application under the Welsh regulations; in Scotland a building warrant is needed before starting; in Northern Ireland an application goes to council building control. We prepare and submit this with the engineer's calculations.

Planning to take a wall out?

Book a free survey visit. You get an itemised written quote covering calculations, building control, steel and making good.