Steel BeamInstallers
Ground-floor chimney breast removed with a short steel beam carrying the breast above

Chimney breast removal · New Malden

Chimney breast removal in New Malden

Chimney breast removal in New Malden, from free survey to completion certificate.

  • Itemised written quote
  • Beam sized by a structural engineer
  • Covering New Malden and nearby

Free survey in New Malden

Tell us about the chimney breast removal job in New Malden.

Please enter your name.
Please enter a UK phone number.
Please enter a valid email.
Please enter a UK postcode.
Please tell us a little about the job.
  • Free survey visit
  • Engineer's calculations arranged
  • Building control handled
  • Fixed written price once scope is agreed
  • England, Wales, mainland Scotland & NI

Planning chimney breast removal in New Malden

New Malden has a mix of housing, and chimney breast removal needs a slightly different approach in each. We also cover the surrounding towns and villages in London. Whatever the age of the property, the steel goes in on proper bearings with temporary support in place throughout.

We cover the survey visit, structural calculations from a qualified engineer, building control, party wall notices through a party wall surveyor where needed, temporary support, removal, the steelwork and making good. Whether you are taking out the ground-floor breast only or the full height, the itemised written quote shows each stage.

What to expect

  • Removing a ground-floor breast with steel support typically takes two to four working days. Full-height removal including the stack and roof repair takes longer and depends on scaffolding, roofing access and the weather.
  • Removing only the ground-floor breast leaves the upper breast and stack in place, so they must be supported. Taking the breast out on every floor and removing the stack above the roof avoids that load entirely, but involves roofing work and more disruption.
  • Gallows brackets are steel angle brackets fixed into the wall to hold a breast above. They are often not accepted where the remaining masonry is heavy or sits against the neighbour's breast, so the engineer and building control decide which support method is suitable.
  • Chimney brickwork is heavy and dirty. Even a single breast produces a lot of rubble and soot, so a skip or waste collection is planned in advance, and floors, stairs and furniture along the route out are protected.
  • The price depends on how many floors the breast spans, whether the stack is kept or removed, the support method the engineer specifies, roof and scaffold work, and how much rubble needs taking away. Each is listed separately in the quote.

Four stages, one team

  1. Free visit

    A short visit to New Malden to see the job, agree what you want and check the bearings, floors and services that affect the design.

  2. Calculations

    The engineer's calculations and a simple drawing are prepared for your opening and shared with you before anything is ordered.

  3. Building control

    We submit a building notice or full plans application to the local council's building control team, so approval is in place before the wall is touched.

  4. Steel in, made good

    On site we prop, open up, fit and pack the steel, then fire protect, box in and plaster once the inspection is done.

Guide prices for chimney breast removal in New Malden

As a guide, budget £1,900–£3,850 including VAT for chimney breast removal (ground floor) in New Malden, based on published UK cost guides adjusted for London prices (+28%).

JobTypical guide rangeWhat it usually covers
Chimney breast removal (ground floor)£1,900–£3,850Ground-floor breast removed, steel to support the breast above, building control and making good
Load-bearing wall removal with steel beam£2,550–£6,400Typical internal wall up to about 4 m: calculations, building control, propping, steel, padstones, fitting, fire protection and making good
Plastering and making good£380–£1,540Boxing the beam, bead and skim, reveals, floor infill where the wall stood and tidy-up
Structural calculations for a beam£320–£960Site measure or photos, beam and padstone design and calculations for building control

Figures include our approximate regional adjustment for London prices (+28%) and are rounded. How these figures are worked out.

Approvals in New Malden

In England, taking out a load-bearing wall or putting in a beam is building work under the Building Regulations 2010. It needs approval from building control, either the local council's building control team or a registered building control approver, through a full plans application or a building notice. Part A covers the structure and Part B covers fire safety, which is why steel in homes is usually fire protected.

If the beam bears into a wall you share with a neighbour, the Party Wall etc. Act 1996 applies, and a party structure notice must be served at least two months before that work starts. We arrange this through a party wall surveyor.

Building rules in England

Chimney breast removal near New Malden

Chimney breast removal in New Malden: your questions

Do I need a party wall agreement for chimney breast removal in New Malden?

Yes, if the beam bears into a shared wall: the Party Wall etc. Act 1996 applies in England and Wales, and a party structure notice must be served at least two months before that work starts. We arrange it through a party wall surveyor.

Do you cover New Malden for chimney breast removal?

Yes. We carry out chimney breast removal in New Malden and the KT1, KT2, KT3, KT4 and KT5 postcode districts. Book a free survey visit and we will check the wall, arrange the engineer's calculations and send an itemised written quote.

What if my chimney breast was removed without support?

Get it checked by a structural engineer as soon as possible. If the upper breast or stack has no adequate support, it may need propping straight away. A support can usually be fitted retrospectively, and in England and Wales a regularisation application to the local authority can be used to get the unauthorised work approved.

Can I remove a chimney breast on the ground floor only?

Yes, but whatever stays above must be properly supported. The structural engineer designs that support, usually a steel beam bearing onto walls that can take the load, and building control must approve it before work starts. Leaving an upper breast or stack without adequate support is dangerous and is a problem surveyors look for.

Can I remove a chimney breast downstairs and keep the fireplace upstairs?

Usually, as long as the upstairs breast and its flue stay intact and are carried on a support the engineer designs for that load. Building control must approve the arrangement. If the upstairs fireplace has a gas fire, any work on it or its supply must be carried out by a Gas Safe registered engineer.

Do you also work near New Malden?

Yes. We also cover nearby towns including Surbiton, Morden, Wimbledon and Ewell.

Planning to take a wall out?

Book a free survey visit. You get an itemised written quote covering calculations, building control, steel and making good.