Steel BeamInstallers
Ground-floor chimney breast removed with a short steel beam carrying the breast above

Chimney breast removal · Andover

Chimney breast removal in Andover

Chimney breast removal for homes in SP10, SP11, designed by a structural engineer.

  • Survey, design and installation in one
  • Covering SP10, SP11
  • Inspected before it is covered

Free survey in Andover

Tell us about the chimney breast removal job in Andover.

Please enter your name.
Please enter a UK phone number.
Please enter a valid email.
Please enter a UK postcode.
Please tell us a little about the job.
  • Free survey visit
  • Engineer's calculations arranged
  • Building control handled
  • Fixed written price once scope is agreed
  • England, Wales, mainland Scotland & NI

What chimney breast removal involves in Andover

If you live in Andover, chimney breast removal can usually be planned and priced after a single survey visit. Our coverage runs across Hampshire, so nearby villages are included too. We cover SP10 and SP11, and we fix the price in writing once the layout and scope are agreed.

We cover the survey visit, structural calculations from a qualified engineer, building control, party wall notices through a party wall surveyor where needed, temporary support, removal, the steelwork and making good. Whether you are taking out the ground-floor breast only or the full height, the itemised written quote shows each stage.

Worth knowing before you start

  • Removing only the ground-floor breast leaves the upper breast and stack in place, so they must be supported. Taking the breast out on every floor and removing the stack above the roof avoids that load entirely, but involves roofing work and more disruption.
  • If you remove the breast in a ground-floor room but want to keep a fireplace or the breast in the bedroom above, the steel underneath must be designed for that load. Its ends need solid bearings, which may mean pockets cut into the party wall.
  • A flue still serving a gas fire, boiler or wood burner cannot be removed until that appliance is disconnected and an alternative arranged. Work on any gas appliance or pipe must, by law, be done by a Gas Safe registered engineer.
  • A chimney breast removed without proper support or approval is a frequent issue raised in surveys when a house is sold. Keeping the calculations, completion certificate and any party wall documents shows a buyer that what remains was properly supported.
  • Removing a ground-floor breast with steel support typically takes two to four working days. Full-height removal including the stack and roof repair takes longer and depends on scaffolding, roofing access and the weather.

Four stages, one team

  1. Free visit

    A short visit to Andover to see the job, agree what you want and check the bearings, floors and services that affect the design.

  2. Calculations

    The engineer's calculations and a simple drawing are prepared for your opening and shared with you before anything is ordered.

  3. Building control

    We submit a building notice or full plans application to the local council's building control team, so approval is in place before the wall is touched.

  4. Steel in, made good

    On site we prop, open up, fit and pack the steel, then fire protect, box in and plaster once the inspection is done.

How much should I budget in Andover?

As a guide, budget £1,700–£3,350 including VAT for chimney breast removal (ground floor) in Andover, based on published UK cost guides adjusted for prices in the South East (+12%).

JobTypical guide rangeWhat it usually covers
Chimney breast removal (ground floor)£1,700–£3,350Ground-floor breast removed, steel to support the breast above, building control and making good
Load-bearing wall removal with steel beam£2,250–£5,600Typical internal wall up to about 4 m: calculations, building control, propping, steel, padstones, fitting, fire protection and making good
Structural calculations for a beam£280–£840Site measure or photos, beam and padstone design and calculations for building control
Through-lounge knock-through£2,800–£6,150Wall between front and back reception rooms, steel beam, approvals, plastering and floor infill

Figures include our approximate regional adjustment for prices in the South East (+12%) and are rounded. How these figures are worked out.

Building control and neighbours in Andover

For Andover, building control is provided by the local council's building control team, or by a registered building control approver if preferred. We send them the engineer's calculations with a building notice or full plans application and book the inspections. Work done without approval can cause problems at sale and is far dearer to put right later.

If the beam bears into a wall you share with a neighbour, the Party Wall etc. Act 1996 applies, and a party structure notice must be served at least two months before that work starts. We arrange this through a party wall surveyor.

Building rules in England

Chimney breast removal near Andover

Chimney breast removal in Andover: your questions

Do you also work near Andover?

Yes. We also cover nearby towns including Winchester, Newbury, Salisbury and Thatcham.

What happens at the survey visit in Andover?

We look at the wall, the floor and ceiling either side and what sits above, measure the opening you want, and note cables, pipes and access for the steel. It usually takes under an hour and there is no charge.

Are gallows brackets allowed for chimney breast support?

Sometimes, but not always. Gallows brackets are used for lighter loads in certain situations, yet many building control bodies will not accept them where the remaining breast is heavy, sits on a party wall or carries the neighbour's flues. The structural engineer proposes a method and building control decides whether it is acceptable.

What is included in a chimney breast removal quote?

The itemised written quote covers the survey, engineer's calculations, building control, any party wall notices, temporary support, the steel or other support specified, removal and waste, venting or capping, and plastering and floor making good. Scaffolding and roof work appear as separate lines where the stack is involved, and the price is fixed in writing once the scope is agreed.

Do I need building regulations to remove a chimney breast?

Yes. Removing all or part of a chimney breast is structural work. In England it needs building regulations approval through a full plans application or building notice, and in Wales an application under the Welsh regulations; in Scotland a building warrant is needed before starting; in Northern Ireland an application goes to council building control. We prepare and submit this with the engineer's calculations.

Do you cover Andover for chimney breast removal?

Yes. We carry out chimney breast removal in Andover and the SP10 and SP11 postcode districts. Book a free survey visit and we will check the wall, arrange the engineer's calculations and send an itemised written quote.

Planning to take a wall out?

Book a free survey visit. You get an itemised written quote covering calculations, building control, steel and making good.