Steel BeamInstallers
Ground-floor chimney breast removed with a short steel beam carrying the breast above

Chimney breast removal · Brighton

Chimney breast removal in Brighton

Steelwork, approvals and making good for chimney breast removal in Brighton and nearby.

  • Survey, design and installation in one
  • Covering BN1, BN2, BN3
  • Inspected before it is covered

Free survey in Brighton

Tell us about the chimney breast removal job in Brighton.

Please enter your name.
Please enter a UK phone number.
Please enter a valid email.
Please enter a UK postcode.
Please tell us a little about the job.
  • Free survey visit
  • Engineer's calculations arranged
  • Building control handled
  • Fixed written price once scope is agreed
  • England, Wales, mainland Scotland & NI

About our chimney breast removal service in Brighton

Need chimney breast removal in Brighton? The wider East Sussex area is covered as well. We survey the property, arrange the engineer's design, deal with Brighton & Hove City Council, fit the steel and make good, all under one quote for BN1, BN2 and BN3 addresses.

Chimney breasts take up a surprising amount of room, especially in the kitchens and bedrooms of older terraces and semis. Removing one is common, but it is structural work: the breast usually continues upstairs and up through the roof, and in terraces the stack is often shared with the house next door.

What to expect

  • In England and Wales, cutting away a chimney breast attached to a party wall is notifiable work under the Party Wall etc. Act 1996. Notice must be served on the neighbour before work begins, and their response decides whether party wall surveyors need to be appointed.
  • In terraces and semis the chimney stack usually serves both houses, with flues from each side rising together. You can generally only alter your own side, and the work must not weaken your neighbour's breast or flues, which is why party wall procedures often apply.
  • Removing only the ground-floor breast leaves the upper breast and stack in place, so they must be supported. Taking the breast out on every floor and removing the stack above the roof avoids that load entirely, but involves roofing work and more disruption.
  • Removing a ground-floor breast with steel support typically takes two to four working days. Full-height removal including the stack and roof repair takes longer and depends on scaffolding, roofing access and the weather.
  • A chimney breast removed without proper support or approval is a frequent issue raised in surveys when a house is sold. Keeping the calculations, completion certificate and any party wall documents shows a buyer that what remains was properly supported.

Four stages, one team

  1. Survey in Brighton

    We visit, look at the wall and what sits above it, measure the opening and note services, access and how the steel can be brought in.

  2. Engineer's design

    A structural engineer sizes the beam, padstones and any posts, and sets out the temporary support needed while the wall is out.

  3. Building control

    We submit a building notice or full plans application to Brighton & Hove City Council, so approval is in place before the wall is touched.

  4. Install and sign-off

    Props go in, the opening is formed, the steel is set and packed, building control inspects it, and we make good.

Guide prices for chimney breast removal in Brighton

As a guide, budget £1,700–£3,350 including VAT for chimney breast removal (ground floor) in Brighton, based on published UK cost guides adjusted for prices in the South East (+12%).

JobTypical guide rangeWhat it usually covers
Chimney breast removal (ground floor)£1,700–£3,350Ground-floor breast removed, steel to support the breast above, building control and making good
Through-lounge knock-through£2,800–£6,150Wall between front and back reception rooms, steel beam, approvals, plastering and floor infill
Plastering and making good£340–£1,340Boxing the beam, bead and skim, reveals, floor infill where the wall stood and tidy-up
Structural calculations for a beam£280–£840Site measure or photos, beam and padstone design and calculations for building control

Figures include our approximate regional adjustment for prices in the South East (+12%) and are rounded. How these figures are worked out.

Approvals in Brighton

In England, taking out a load-bearing wall or putting in a beam is building work under the Building Regulations 2010. It needs approval from building control, either Brighton & Hove City Council or a registered building control approver, through a full plans application or a building notice. Part A covers the structure and Part B covers fire safety, which is why steel in homes is usually fire protected.

If the beam bears into a wall you share with a neighbour, the Party Wall etc. Act 1996 applies, and a party structure notice must be served at least two months before that work starts. We arrange this through a party wall surveyor.

Building rules in England

Chimney breast removal near Brighton

Chimney breast removal in Brighton: your questions

Do you cover Brighton for chimney breast removal?

Yes. We carry out chimney breast removal in Brighton and the BN1, BN2 and BN3 postcode districts. Book a free survey visit and we will check the wall, arrange the engineer's calculations and send an itemised written quote.

Do I need a party wall agreement for chimney breast removal in Brighton?

Yes, if the beam bears into a shared wall: the Party Wall etc. Act 1996 applies in England and Wales, and a party structure notice must be served at least two months before that work starts. We arrange it through a party wall surveyor.

What if my chimney breast was removed without support?

Get it checked by a structural engineer as soon as possible. If the upper breast or stack has no adequate support, it may need propping straight away. A support can usually be fitted retrospectively, and in England and Wales a regularisation application to the local authority can be used to get the unauthorised work approved.

Do I need building regulations to remove a chimney breast?

Yes. Removing all or part of a chimney breast is structural work. In England it needs building regulations approval through a full plans application or building notice, and in Wales an application under the Welsh regulations; in Scotland a building warrant is needed before starting; in Northern Ireland an application goes to council building control. We prepare and submit this with the engineer's calculations.

Will removing a chimney breast cause damp?

It can if the remaining flue is sealed with no airflow, because moisture and condensation get trapped inside. Fitting a vent in the remaining breast or wall and a ventilated cap on the chimney pot keeps air moving. If the stack is removed and the roof made good, the risk from the flue goes away.

Planning to take a wall out?

Book a free survey visit. You get an itemised written quote covering calculations, building control, steel and making good.