Steel BeamInstallers
Ground-floor chimney breast removed with a short steel beam carrying the breast above

Chimney breast removal · Ards and North Down

Chimney breast removal in Ards and North Down

Chimney breast removal across Ards and North Down, designed by a structural engineer and signed off by building control.

  • Survey, design and installation in one
  • Covering BT18, BT19, BT20, BT21
  • Inspected before it is covered

Free survey in Ards and North Down

Tell us about your chimney breast removal project in Ards and North Down.

Please enter your name.
Please enter a UK phone number.
Please enter a valid email.
Please enter a UK postcode.
Please tell us a little about the job.
  • Free survey visit
  • Engineer's calculations arranged
  • Building control handled
  • Fixed written price once scope is agreed
  • England, Wales, mainland Scotland & NI

What chimney breast removal involves in Ards and North Down

Chimney breast removal is taking out the projecting brickwork that houses the flues from fireplaces, usually to gain floor space or straighten a wall. If any of the breast or stack above stays in place, it must be carried on steel or another support the engineer designs and building control accepts, so it is never left unsupported.

From the first survey visit to the completion certificate, we take care of chimney breast removal across Ards and North Down. We can survey in places such as Bangor and Newtownards and the villages around them. The engineer sizes the steel, we deal with Ards and North Down Borough Council, and our team fits and packs the beam before making good.

Things to plan for

  • Some owners remove breasts in the loft to make space for a conversion while keeping the stack on the roof. That leaves the stack carried at loft level on steel or another support, which the engineer must design and building control must approve before work starts.
  • Removing a ground-floor breast with steel support typically takes two to four working days. Full-height removal including the stack and roof repair takes longer and depends on scaffolding, roofing access and the weather.
  • Gallows brackets are steel angle brackets fixed into the wall to hold a breast above. They are often not accepted where the remaining masonry is heavy or sits against the neighbour's breast, so the engineer and building control decide which support method is suitable.
  • Once the breast is gone, the wall behind it is often rough, sooty or uneven. It is cleaned back, dubbed out where needed and plastered flat, and the floor where the hearth sat is filled level to meet the surrounding boards or screed.
  • Older fireplaces sometimes contain asbestos in flue linings, fire surrounds, hearth boards or heat-resistant panels. In buildings from before 2000, suspect materials are identified with a survey before removal so they can be handled correctly.

Four stages, one team

  1. Survey in Ards and North Down

    We visit, look at the wall and what sits above it, measure the opening and note services, access and how the steel can be brought in.

  2. Engineer's design

    A structural engineer sizes the beam, padstones and any posts, and sets out the temporary support needed while the wall is out.

  3. Building control

    A full plans application or building notice goes to Ards and North Down Borough Council under the Building Regulations (Northern Ireland) 2012 before work begins.

  4. Install and sign-off

    Props go in, the opening is formed, the steel is set and packed, building control inspects it, and we make good.

What does chimney breast removal cost in Ards and North Down?

As a guide, budget £1,300–£2,600 including VAT for chimney breast removal (ground floor) in Ards and North Down, based on published UK cost guides adjusted for prices in Northern Ireland (-14%).

JobTypical guide rangeWhat it usually covers
Chimney breast removal (ground floor)£1,300–£2,600Ground-floor breast removed, steel to support the breast above, building control and making good
Loft conversion steels£2,150–£5,150Supply and fit of floor and ridge steels on padstones, including lifting into the roof space
Plastering and making good£260–£1,030Boxing the beam, bead and skim, reveals, floor infill where the wall stood and tidy-up
Through-lounge knock-through£2,150–£4,750Wall between front and back reception rooms, steel beam, approvals, plastering and floor infill

Figures include our approximate regional adjustment for prices in Northern Ireland (-14%) and are rounded. How these figures are worked out.

Approvals in Ards and North Down

In Northern Ireland, structural work comes under the Building Regulations (Northern Ireland) 2012 and is approved by the local council's building control. For Ards and North Down that is Ards and North Down Borough Council. We submit a full plans application or building notice before work starts and book the inspections.

Northern Ireland has no Party Wall Act, so there is no statutory notice to serve. Where the steel bears into a shared wall, the title deeds and the general law apply, and agreeing the work with your neighbour in writing first is good practice.

Building rules in Northern Ireland

Chimney breast removal by town

Chimney breast removal in Ards and North Down: your questions

Do I need a party wall agreement for chimney breast removal in Ards and North Down?

There is no Party Wall Act in Northern Ireland. Your title deeds and the general law apply instead, so agree the work with your neighbour in writing before it starts.

Which towns in Ards and North Down do you cover?

We cover towns including Bangor and Newtownards, plus the villages and smaller towns around them.

Should I remove the chimney stack as well?

It often makes sense if the breast is coming out on every floor, because then nothing is left to support. It needs scaffolding and roof repairs, and in terraces the stack is often shared, so your side may not be removable without affecting your neighbour's. The engineer and building control confirm what is possible.

Can I remove a chimney breast downstairs and keep the fireplace upstairs?

Usually, as long as the upstairs breast and its flue stay intact and are carried on a support the engineer designs for that load. Building control must approve the arrangement. If the upstairs fireplace has a gas fire, any work on it or its supply must be carried out by a Gas Safe registered engineer.

How long does chimney breast removal take?

A ground-floor breast with a steel beam supporting the masonry above usually takes two to four working days, including propping, fitting the steel, removing the brickwork and basic making good. Full removal from ground floor to roof takes longer because of scaffolding, roofing work and weather, and plaster needs time to dry afterwards.

Can I remove a chimney breast on the ground floor only?

Yes, but whatever stays above must be properly supported. The structural engineer designs that support, usually a steel beam bearing onto walls that can take the load, and building control must approve it before work starts. Leaving an upper breast or stack without adequate support is dangerous and is a problem surveyors look for.

Who approves chimney breast removal in Ards and North Down?

Structural work in Ards and North Down needs a full plans application or building notice to Ards and North Down Borough Council. We prepare and submit it with the structural engineer's calculations and arrange the inspections, so the completion paperwork follows the job.

Planning to take a wall out?

Book a free survey visit. You get an itemised written quote covering calculations, building control, steel and making good.