Steel BeamInstallers
Rear wall opened for wide doors with a galvanised steel beam and props, garden beyond

Bi-fold & sliding door openings · Richmond

Bi-fold & sliding door openings in Richmond

Bi-fold & sliding door openings for homes in SW14, TW1, TW2, designed by a structural engineer.

  • Price fixed in writing once scope is agreed
  • Building control arranged
  • Temporary works and making good included

Free survey in Richmond

Tell us about the bi-fold & sliding door opening job in Richmond.

Please enter your name.
Please enter a UK phone number.
Please enter a valid email.
Please enter a UK postcode.
Please tell us a little about the job.
  • Free survey visit
  • Engineer's calculations arranged
  • Building control handled
  • Fixed written price once scope is agreed
  • England, Wales, mainland Scotland & NI

Bi-fold & sliding door openings in Richmond: how it works

We cover bi-fold & sliding door openings in Richmond (SW14, TW1, TW2) and the streets around it. The wider London area is covered as well. Each job is designed by a structural engineer and approved through local building control before work begins.

We coordinate the structure with your door supplier's sizes, so the finished opening matches the frame. The survey visit, structural calculations from a qualified engineer, building control, propping, steel, cavity trays, weather protection while the wall is open and making good are all covered in one itemised written quote.

Key points for your project

  • Level or flush thresholds are popular with bi-fold doors, but the floor inside and the patio outside need planning together. Drainage at the threshold and a proper damp-proof detail stop water running in when the outside is close to floor level.
  • The structural work for a typical bi-fold opening usually takes three to five working days. Doors are often made to order, so the steel goes in once opening sizes are confirmed and the doors are fitted soon after.
  • The house is open to the weather between taking out the wall and fitting the doors. Temporary sheeting or a boarded frame keeps rain out and the house secure, so the gap between the structural work and door fitting should be kept short.
  • External walls can have gas meters, boiler flues, soil pipes, outside taps or cables near the new opening. These are found at survey and moved by the right trade, with any gas pipework done by a Gas Safe registered engineer as the law requires.
  • New brickwork at the reveals and above the opening should match the existing in colour, size and bond. Sound bricks from the wall being removed are often cleaned and reused, and the mortar colour is matched as closely as possible.

What happens, step by step

  1. Look and measure

    We check the wall, the span you want and what the wall is carrying, and photograph anything the engineer needs to see.

  2. Design and price

    Calculations come back from the engineer and we confirm your fixed written price, line by line.

  3. Building control

    We submit a building notice or full plans application to the local council's building control team, so approval is in place before the wall is touched.

  4. Fit, inspect, finish

    The work is propped and the steel installed and packed tight. After inspection the opening is boxed, plastered and left clean.

What do bi-fold & sliding door openings cost in Richmond?

As a guide, budget £3,200–£8,950 including VAT for rear wall opening for bi-fold or sliding doors in Richmond, based on published UK cost guides adjusted for London prices (+28%).

JobTypical guide rangeWhat it usually covers
Rear wall opening for bi-fold or sliding doors£3,200–£8,950External wall opened up to about 5 m with steel, propping, cavity tray and making good (doors supplied separately)
Widening an internal doorway£1,300–£3,200Opening widened with a new lintel or short beam, approval where structural, and making good
Lintel replacement£510–£1,540 per lintelPropping, removing the old lintel, new lintel set on beds and brickwork made good
Opening into a rear extension£3,200–£8,950Original rear wall removed with a beam or goalpost, approvals and propping, coordinated with the extension build

Figures include our approximate regional adjustment for London prices (+28%) and are rounded. How these figures are worked out.

Building control and neighbours in Richmond

For Richmond, building control is provided by the local council's building control team, or by a registered building control approver if preferred. We send them the engineer's calculations with a building notice or full plans application and book the inspections. Work done without approval can cause problems at sale and is far dearer to put right later.

If the beam bears into a wall you share with a neighbour, the Party Wall etc. Act 1996 applies, and a party structure notice must be served at least two months before that work starts. We arrange this through a party wall surveyor.

Building rules in England

Bi-fold & sliding door openings near Richmond

Local questions answered

How soon can bi-fold & sliding door openings start in Richmond?

Start dates depend on the engineer's calculations, the building control approval and, where needed, party wall notice periods. We give you a realistic timetable after the survey and keep you updated as each approval comes through.

Do you also work near Richmond?

Yes. We also cover nearby towns including Isleworth, Hounslow, Barnes and Chiswick.

Should I order my doors before the opening is made?

It helps to choose them first. The supplier's structural opening size and threshold detail feed into the steel design, so the opening is formed to suit the doors exactly. Many people order once the engineer has confirmed the opening, then time the structural work so the gap is weathered for as short a time as possible.

What does a bi-fold opening quote include?

Our itemised written quote covers the survey, calculations, building control, propping, removing the wall, steel and padstones, outer leaf support, cavity trays and closers, temporary weather protection and making good. Doors, threshold drainage and patio work are shown separately unless agreed. The price is fixed in writing once the opening size and specification are agreed.

Do I need planning permission for bi-fold doors?

Usually not for a rear opening in a house, as this generally falls within permitted development. Planning or another consent may be needed for front elevations, flats, listed buildings, conservation areas with extra controls, or homes where permitted development rights have been removed. We flag this at survey so you can check before work is booked.

Planning to take a wall out?

Book a free survey visit. You get an itemised written quote covering calculations, building control, steel and making good.