
Bi-fold & sliding door openings · London
Bi-fold & sliding door openings in London
Bi-fold & sliding door openings across London, designed by a structural engineer and signed off by building control.
- Survey, design and installation in one
- Covering BR1, BR2, BR3, BR4
- Inspected before it is covered
- Free survey visit
- Engineer's calculations arranged
- Building control handled
- Fixed written price once scope is agreed
- England, Wales, mainland Scotland & NI
Bi-fold & sliding door openings in London: how it works
Bi-fold and sliding door openings are wide gaps formed in an external wall, usually at the back of the house, to take a run of folding or sliding glazed doors. A steel beam carries the wall, floor and roof loads above, and it is designed stiff enough that its movement does not press on the glass or stop the doors running.
From the first survey visit to the completion certificate, we take care of bi-fold & sliding door openings across London. We work in Tottenham, Islington and Westminster and the surrounding villages. The engineer sizes the steel, we deal with building control, and our team fits and packs the beam before making good.
Key points for your project
- The house is open to the weather between taking out the wall and fitting the doors. Temporary sheeting or a boarded frame keeps rain out and the house secure, so the gap between the structural work and door fitting should be kept short.
- New brickwork at the reveals and above the opening should match the existing in colour, size and bond. Sound bricks from the wall being removed are often cleaned and reused, and the mortar colour is matched as closely as possible.
- External walls can have gas meters, boiler flues, soil pipes, outside taps or cables near the new opening. These are found at survey and moved by the right trade, with any gas pipework done by a Gas Safe registered engineer as the law requires.
- Width, what sits above, whether columns or a goalpost are needed, outer leaf support, threshold works and how much brickwork needs matching all affect the price. The doors themselves are normally supplied separately unless agreed otherwise.
- In cavity walls a cavity tray above the new head directs any water in the cavity out through weep vents. Without it, damp can show inside above the doors, so the tray is lapped and sealed correctly as the brickwork is rebuilt.
From survey to sign-off in London
Free visit
A short visit to London to see the job, agree what you want and check the bearings, floors and services that affect the design.
Calculations
The engineer's calculations and a simple drawing are prepared for your opening and shared with you before anything is ordered.
Building control
We submit a building notice or full plans application to the local council's building control team, so approval is in place before the wall is touched.
Steel in, made good
On site we prop, open up, fit and pack the steel, then fire protect, box in and plaster once the inspection is done.
How much should I budget in London?
As a guide, budget £3,200–£8,950 including VAT for rear wall opening for bi-fold or sliding doors in London, based on published UK cost guides adjusted for London prices (+28%).
| Job | Typical guide range | What it usually covers |
|---|---|---|
| Rear wall opening for bi-fold or sliding doors | £3,200–£8,950 | External wall opened up to about 5 m with steel, propping, cavity tray and making good (doors supplied separately) |
| Steel goalpost frame | £2,550–£7,700 | Two posts and a beam bolted as a frame, pad foundations, base plates and fitting |
| Lintel replacement | £510–£1,540 per lintel | Propping, removing the old lintel, new lintel set on beds and brickwork made good |
| Widening an internal doorway | £1,300–£3,200 | Opening widened with a new lintel or short beam, approval where structural, and making good |
Figures include our approximate regional adjustment for London prices (+28%) and are rounded. How these figures are worked out.
Building control and neighbours in London
Structural openings in English homes need building regulations approval before work starts. The local council's building control team can deal with it, or you can use a registered building control approver. Either way the steel is inspected before it is covered, and a completion certificate is issued at the end. Keep it safe for when you sell.
If the beam bears into a wall you share with a neighbour, the Party Wall etc. Act 1996 applies, and a party structure notice must be served at least two months before that work starts. We arrange this through a party wall surveyor.
Bi-fold & sliding door openings by town
- Brent
- Islington
- Westminster
- Bexley
- Barking
- Archway
- Sutton
- Croydon
- Ilford
- Enfield Town
- Harrow
- Tottenham
- Walthamstow
- Dagenham
- Becontree
- Romford
- Hayes
- Wembley
- Fulham
- Edmonton
- Southall
- Putney
- Battersea
- Purley
- Peckham
- Chingford
- Uxbridge
- Wimbledon
- Stamford Hill
- Brixton
- Hounslow
- Finchley
- Cricklewood
- Mitcham
- Feltham
- Acton
- Beckenham
- Chelsea
- Streatham
- South Croydon
Local questions answered
Can I stay at home while the work is done in London?
Usually, yes. The work area is screened and floors are protected. The rooms either side of the opening are out of action for a few days, and there is some noise and dust while the masonry comes out.
What happens at the survey visit in London?
We look at the wall, the floor and ceiling either side and what sits above, measure the opening you want, and note cables, pipes and access for the steel. It usually takes under an hour and there is no charge.
Do I need planning permission for bi-fold doors?
Usually not for a rear opening in a house, as this generally falls within permitted development. Planning or another consent may be needed for front elevations, flats, listed buildings, conservation areas with extra controls, or homes where permitted development rights have been removed. We flag this at survey so you can check before work is booked.
Will the house be open to the weather while the wall is out?
Only briefly, and it is protected throughout. Once the wall is out, the opening is sheeted or boarded so it stays weathertight and secure until the doors arrive. Timing the structural work close to the door delivery date keeps that period as short as possible.
How wide can a bi-fold door opening be?
There is no fixed limit, as it depends on the loads above and what the beam can bear on. The engineer designs the steel and, for very wide openings or ones near a corner, may specify columns or a goalpost frame. The door system's own maximum panel sizes and configurations also need checking.
How long does it take to make an opening for bi-fold doors?
The structural opening usually takes three to five working days, including propping, cutting out the wall, fitting the steel and outer leaf support, and forming the reveals. The doors can then be fitted, with inside making good and outside brickwork finishing following on. Lead times on made-to-order doors affect the overall timeline more than the steelwork.