Bi-fold & sliding door openings · Hampshire
Bi-fold & sliding door openings in Hampshire
Calculations, approvals, propping, steel and making good for bi-fold & sliding door openings across Hampshire.
- Price fixed in writing once scope is agreed
- Building control arranged
- Temporary works and making good included
- Free survey visit
- Engineer's calculations arranged
- Building control handled
- Fixed written price once scope is agreed
- England, Wales, mainland Scotland & NI
Planning bi-fold & sliding door openings in Hampshire
Bi-fold and sliding door openings are wide gaps formed in an external wall, usually at the back of the house, to take a run of folding or sliding glazed doors. A steel beam carries the wall, floor and roof loads above, and it is designed stiff enough that its movement does not press on the glass or stop the doors running.
Bi-fold & sliding door openings in Hampshire follows the same careful process wherever the property is: a survey, an engineer's design, the right approval and safe temporary works. Towns we cover include Basingstoke, Fareham and Farnborough, among other places in the area. We price it all up front so there are no surprises once the wall is open.
Key points for your project
- External walls can have gas meters, boiler flues, soil pipes, outside taps or cables near the new opening. These are found at survey and moved by the right trade, with any gas pipework done by a Gas Safe registered engineer as the law requires.
- Glazed doors need a stiffer beam than a plain opening of the same width. If the steel bends even slightly under load, folding panels can bind, sliders can stick and glass can be stressed, so the engineer sets a tighter deflection limit for door openings.
- The structural work for a typical bi-fold opening usually takes three to five working days. Doors are often made to order, so the steel goes in once opening sizes are confirmed and the doors are fitted soon after.
- Door suppliers quote a structural opening size, which allows for the frame and fixing tolerances. Agreeing that size before the steel is designed avoids reveals that are too tight or gaps that have to be packed out later.
- Replacing a rear window with doors in a house is usually permitted development, but front elevations, listed buildings, flats and homes where permitted development rights have been removed may need planning permission or another consent.
From survey to sign-off in Hampshire
Free visit
A short visit to Hampshire to see the job, agree what you want and check the bearings, floors and services that affect the design.
Calculations
The engineer's calculations and a simple drawing are prepared for your opening and shared with you before anything is ordered.
Building control
We submit a building notice or full plans application to the local council's building control team, so approval is in place before the wall is touched.
Steel in, made good
On site we prop, open up, fit and pack the steel, then fire protect, box in and plaster once the inspection is done.
How much should I budget in Hampshire?
As a guide, budget £2,800–£7,850 including VAT for rear wall opening for bi-fold or sliding doors in Hampshire, based on published UK cost guides adjusted for prices in the South East (+12%).
| Job | Typical guide range | What it usually covers |
|---|---|---|
| Rear wall opening for bi-fold or sliding doors | £2,800–£7,850 | External wall opened up to about 5 m with steel, propping, cavity tray and making good (doors supplied separately) |
| Opening into a rear extension | £2,800–£7,850 | Original rear wall removed with a beam or goalpost, approvals and propping, coordinated with the extension build |
| Structural calculations for a beam | £280–£840 | Site measure or photos, beam and padstone design and calculations for building control |
| Steel goalpost frame | £2,250–£6,700 | Two posts and a beam bolted as a frame, pad foundations, base plates and fitting |
Figures include our approximate regional adjustment for prices in the South East (+12%) and are rounded. How these figures are worked out.
Approvals in Hampshire
For Hampshire, building control is provided by the local council's building control team, or by a registered building control approver if preferred. We send them the engineer's calculations with a building notice or full plans application and book the inspections. Work done without approval can cause problems at sale and is far dearer to put right later.
If the beam bears into a wall you share with a neighbour, the Party Wall etc. Act 1996 applies, and a party structure notice must be served at least two months before that work starts. We arrange this through a party wall surveyor.
Bi-fold & sliding door openings by town
Bi-fold & sliding door openings in Hampshire: your questions
Who approves bi-fold & sliding door openings in Hampshire?
Structural work in Hampshire needs a building notice or full plans application to the local council's building control team or a registered building control approver. We prepare and submit it with the structural engineer's calculations and arrange the inspections, so the completion paperwork follows the job.
Which towns in Hampshire do you cover?
We cover towns including Southampton, Portsmouth, Basingstoke and Gosport, plus the villages and smaller towns around them.
Will the house be open to the weather while the wall is out?
Only briefly, and it is protected throughout. Once the wall is out, the opening is sheeted or boarded so it stays weathertight and secure until the doors arrive. Timing the structural work close to the door delivery date keeps that period as short as possible.
What does a bi-fold opening quote include?
Our itemised written quote covers the survey, calculations, building control, propping, removing the wall, steel and padstones, outer leaf support, cavity trays and closers, temporary weather protection and making good. Doors, threshold drainage and patio work are shown separately unless agreed. The price is fixed in writing once the opening size and specification are agreed.
Should I order my doors before the opening is made?
It helps to choose them first. The supplier's structural opening size and threshold detail feed into the steel design, so the opening is formed to suit the doors exactly. Many people order once the engineer has confirmed the opening, then time the structural work so the gap is weathered for as short a time as possible.
Can I have a level threshold with bi-fold doors?
Often yes, but it has to be designed. The inside floor, outside paving and drainage all need to work together so water cannot run in, usually with a drainage channel outside and the right damp-proof detail under the door frame. We look at levels at the survey and plan the threshold with the door supplier.
How soon can bi-fold & sliding door openings start in Hampshire?
Start dates depend on the engineer's calculations, the building control approval and, where needed, party wall notice periods. We give you a realistic timetable after the survey and keep you updated as each approval comes through.